IR 05000361/2011404

From kanterella
(Redirected from IR 05000362/2011404)
Jump to navigation Jump to search
IR 05000361-11-404; 05000362-11-404, on 11/16/2010 - 12/15/2010, San Onofre Nuclear Generating Station, Units 2 and 3, NRC Security Inspection Report, Cover Letter Only
ML110950582
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/04/2011
From: Shannon M
Plant Support Branch-1
To: Peter Dietrich
Southern California Edison Co
References
EA-10-247 IR-11-404
Download: ML110950582 (4)


Text

UNITED STATES NUC LE AR RE G ULATO RY C O M M I S S I O N ril 4, 2011

SUBJECT:

SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 NRC SECURITY INSPECTION REPORT 05000361/2011404; 05000362/2011404

Dear Mr. Dietrich:

This refers to an in-office inspection conducted between November 16, 2010, and December 15, 2010, of your San Onofre Nuclear Generating Station. The purpose of the inspection was to follow up on security events that occurred on August 1, 2009. The enclosed report presents the results of the inspection, which were discussed telephonically on March 17, 2011, with Mr. D. Bauder, Site Vice President, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents one NRC identified Severity Level IV non-cited violation (SLIV-NCV). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements immediately upon discovery of the deficiency. However, because of the very low safety significance and because it is entered into your corrective action program, the NRC is treating this violation as a non-cited violation (NCV) consistent with Section VI.A.1 of the NRC Southern California Edison Company -2-Enforcement Policy. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the San Onofre Nuclear Generating Station.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, (ADAMS).

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Michael P. Shannon, Chief Plant Support Branch-1 Division of Reactor Safety Docket No: 50-361, 50-362 License No: NPF-10, NPF-15 Nonpublic Enclosure:

NRC Inspection Report 05000361/2011404; 05000362/2011404 w/Attachment: Supplemental Information Southern California Edison Company -3-cc w/o enclosure:

Douglas K. Porter, Esquire Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770 Doug Bauder Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 R. St. Onge Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Southern California Edison Company -4-Distribution w/enclosure:

Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN 3D43 Branch Chief, RI DRS (James.Trapp@nrc.gov)

Branch Chief, RII DRS/PSB2 (Michael.Ernstes@nrc.gov)

Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)

Senior Resident Inspector (Greg.Warnick@nrc.gov)

Electronic distribution by RIV:

bcc w/o enclosure:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)

Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)

SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov)

Project Engineer, DRP/D (Peter.Jayroe@nrc.gov)

Project Engineer, DRP/D (Zachary.Hollcraft@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Randy.Hall@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

ACES (Ray.Kellar@nrc.gov)

OEMail Resource OEDO RIV Coordinator (Nathan.Sanfilippo@nrc.gov)

Report:

SUNSI Review Completed: JRL ADAMS: Yes G No Initials: JRL G Publicly Available O Non-Publicly Available O Sensitive G Non-Sensitive Letter Only:

SUNSI Review Completed: JRL ADAMS: Yes Initials: JRL Publicly Available Non-Sensitive SPSI:PSB1 C:PSB1 C:PBD ACES:OE C:PSB1 JRLarsen MPShannon RELantz RKellar MPShannon

/RA/ /RA/ /RA/ /RA/ /RA/

3/25/11 3/25/11 3/31/11 4/1/11 4/4/11 OFFICIAL COPY T=Telephone E=E-Mail F=FAX