IR 05000361/2002013
| ML031550789 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 12/20/2002 |
| From: | Troy Pruett Plant Support Branch Region IV |
| To: | Ray H Southern California Edison Co |
| References | |
| IR-02-013 | |
| Download: ML031550789 (10) | |
Text
December 20, 2002
SUBJECT:
NRC SAFEGUARDS INSPECTION OF COMPLIANCE WITH ORDER INSPECTION REPORT 50-361/02-013; 50-362/02-013
Dear Mr. Ray:
On October 11, 2002, the NRC completed an inspection at your San Onofre Nuclear Generating Station, Units 2 and 3, facility. The enclosed report documents the inspection findings which were discussed on October 11, 2002, with Mr. Dwight Nunn and other members of your staff.
This inspection examined activities conducted under your license as they relate to safety and compliance with an Order issued on February 25, 2002, which required your site to implement specific measures related to security of your facility. The inspection utilized Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures, to verify implementation of the Order as clarified in your responses dated March 18, 2002, and May 14, 2002. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel.
As discussed during the inspection and at the exit meeting, the Federal Bureau of Investigation provides the primary law enforcement interface for San Onofre Nuclear Generating Station.
Although the Federal Bureau of Investigation is the local law enforcement agency of record, the licensee had established additional verbal agreements with the Orange and San Diego County Sheriff departments and other members of the Critical Incident Response Group. The agreements are not formalized since a federal agency is responsible.
Southern California Edison Co.
-2-DOCUMENT CONTAINS ENCLOSURE(S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material will not be placed in the Public Document Room.
In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter, its enclosure, and your response will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
//RA//
Troy W. Pruett, Chief Plant Support Branch Division of Reactor Safety Dockets: 50-361 50-362 Licenses: NPF-10 NPF-15 Enclosure:
NRC Inspection Report 50-361/02-013; 50-362/02-013 cc Without safeguards enclosures:
Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, California 92101 Gary L. Nolff Power Projects/Contracts Manager Riverside Public Utilities 2911 Adams Street Riverside, California 92504
Southern California Edison Co.
-3-DOCUMENT CONTAINS ENCLOSURE(S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED Eileen M. Teichert, Esq.
Supervising Deputy City Attorney City of Riverside 3900 Main Street Riverside, California 92522 Joseph J. Wambold, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128 D