August 28, 2025
SUBJECT:
UPDATED INSPECTION PLAN FOR MILLSTONE POWER STATION, UNITS 2 AND 3 (REPORT 05000336/2025005 AND 05000423/2025005)
Dear Eric Carr:
The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for Millstone Power Station, Units 2 and 3. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. As discussed in SECY-25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025 (ML25042A278), the NRC determined that a broad, comprehensive review of the Reactor Oversight Process (ROP) is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5205 with any questions you have regarding this letter.
Sincerely, Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety
Docket Nos. 05000336 and 05000423 License Nos. DPR-65 and NPF-49
Enclosure:
Millstone Power Station Inspection Plan
cc w/encl: Distribution via ListServ MATTHEW YOUNG Digitally signed by MATTHEW YOUNG Date: 2025.08.28 08:15:46 -04'00'
SUNSI Review
Non-Sensitive Sensitive
Publicly Available Non-Publicly Available
OFFICE RI/DORS RI/DORS
NAME NMentzer MYoung
DATE 8/26/2025 8/26/2025
Site Inspection Activity Plan Millstone 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count License Renewal Phase 2 - Millstone Unit 3
3 7/14/2025 7/18/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal
7/21/2025 7/25/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal RP - 71124.05 - Instrumentation - Millstone
2,3 7/14/2025 7/18/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 2025 MS3 Initial Operator Licensing Exam
3 8/10/2025 8/15/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
9/14/2025 9/20/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Age Related Degradation Inspection - Millstone
2,3 9/22/2025 9/26/2025 IP 71111.21N.04 001832 Age-Related Degradation 2,3 10/6/2025 10/10/2025 IP 71111.21N.04 001832 Age-Related Degradation RP - 71124.08 - Rad Waste & Transportation - Millstone
2,3 10/6/2025 10/10/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation MS3 Requal Inspection with P/F Results
3 11/2/2025 11/8/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance RP - 71151 - PIV - Millstone
2,3 11/17/2025 11/21/2025 IP 71151 000746 Performance Indicator Verification PI&R Biennial Team Inspection - Millstone
2,3 2/23/2026 2/27/2026 IP 71152B 000747 Problem Identification and Resolution 2,3 3/9/2026 3/13/2026 IP 71152B 000747 Problem Identification and Resolution Inservice Inspection - Millstone Unit 2
2 4/13/2026 4/24/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP-71124.01 - Rad Hazards - Millstone
2,3 4/27/2026 5/1/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Sec - Access Control, Training, SPR, PI Verification - MS
2,3 5/18/2026 5/22/2026 IP 71130.02 000734 Access Control 2,3 5/18/2026 5/22/2026 IP 71130.07 000739 Security Training 2,3 5/18/2026 5/22/2026 IP 71130.09 001656 Security Plan Changes 2,3 5/18/2026 5/22/2026 IP 71151 001338 Performance Indicator Verification EP Exercise Inspection - Millstone
2,3 6/22/2026 6/26/2026 IP 71114.01 000716 Exercise Evaluation 2,3 6/22/2026 6/26/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes Prepared on 8/19/2025 9:56:56 AM 1 of 3
Site Inspection Activity Plan 2,3 6/22/2026 6/26/2026 IP 71151 001397 Performance Indicator Verification Material Control and Accounting - Millstone
2,3 7/13/2026 7/17/2026 IP 71130.11 000742 Material Control and Accounting (MC&A)
Fire Protection - Millstone
2,3 7/20/2026 7/24/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
2,3 8/3/2026 8/7/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - MS
2,3 8/10/2026 8/14/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 2,3 8/31/2026 9/4/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing RP - 71124.06 - RETS - Millstone
2,3 8/17/2026 8/21/2026 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 2026 MS2 Initial Operator Licensing Exam
2 8/3/2026 8/7/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
9/14/2026 9/18/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
RP - 71124.03 & 71124.04 - Airborne & Dose - Millstone
2,3 9/14/2026 9/18/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2,3 9/14/2026 9/18/2026 IP 71124.04 000728 Occupational Dose Assessment Inservice Inspection - Millstone Unit 3
3 10/12/2026 10/23/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP - 71124.01 - Rad Hazzard & Controls - Millstone
2,3 10/12/2026 10/16/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls MS2 Biennial Requal Inspection
2 11/16/2026 11/20/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance RP - 71151 - PIV - Millstone
2,3 11/16/2026 11/20/2026 IP 71151 000746 Performance Indicator Verification Sec - AA, Access Control, FFD, SPR, PI - Millstone
2,3 1/11/2027 1/15/2027 IP 71130.01 000733 Access Authorization 2,3 1/11/2027 1/15/2027 IP 71130.08 000740 Fitness-For-Duty Program 2,3 1/18/2027 1/22/2027 IP 71130.01 000733 Access Authorization 2,3 1/18/2027 1/22/2027 IP 71130.02 000734 Access Control 2,3 1/18/2027 1/22/2027 IP 71130.08 000740 Fitness-For-Duty Program 2,3 1/18/2027 1/22/2027 IP 71130.09 001656 Security Plan Changes 2,3 1/18/2027 1/22/2027 IP 71151 001338 Performance Indicator Verification RP - 71124.08 - Rad Waste - Millstone
2,3 2/8/2027 2/12/2027 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Prepared on 8/19/2025 9:56:56 AM 2 of 3
Site Inspection Activity Plan RP - 71124.05 - Rad Instruments - Millstone
2,3 4/12/2027 4/16/2027 IP 71124.05 000729 Radiation Monitoring Instrumentation EP Program Inspection - Millstone
2,3 5/24/2027 5/28/2027 IP 71114.02 000717 Alert and Notification System Testing 2,3 5/24/2027 5/28/2027 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2,3 5/24/2027 5/28/2027 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2,3 5/24/2027 5/28/2027 IP 71114.05 000720 Maintenance of Emergency Preparedness 2,3 5/24/2027 5/28/2027 IP 71151 001397 Performance Indicator Verification Cyber Security - Millstone
2,3 6/7/2027 6/11/2027 IP 71130.10 000741 Cybersecurity Prepared on 8/19/2025 9:56:56 AM 3 of 3