IR 05000331/1981004
| ML19345G944 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 04/06/1981 |
| From: | Creed J, Finley A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML19064B192 | List: |
| References | |
| 50-331-81-04, 50-331-81-4, NUDOCS 8104220835 | |
| Download: ML19345G944 (1) | |
Text
_
("')s
..
\\_
e U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-331/81-04 Docket No. 50-331 License No. DPR-49 Safeguards Group IV Licensee:
Iowa Electric Light and Power Company Security Building Post Office Box 351 Cedar Rapids, IA 52406 Facility Name: Duane Arnold Energy Center Inspection At:
Palo, IA Inspection Conducted: March 17-20, 1981 Date of Last Material Control and Accounting Inspection: September 6-8, 1978 Type of Inspection: Unannounced Material Control and Accounting
3/-
-
,o,+,s
.
4? 4./
's Inspector:
A. 5.'F'inley, Aud'itor Mb/f/
i Date Approved By:
ed, Acting Chief, f/
.
Safeguards Section Date Inspection Summary Inspection on March 17-20, 1981 (Report No. 50-331/81-04)
Areas Inspected: Material control and accountability including facility organization and accountablility; measurement and controls; storage and internal controls; shipping and receiving; records and reports; inventory and inventory verification; and management of the material control system.
The inspection involved 26 inspector-hours onsite by one NRC inspector.
Results: The licensee was found to be in compliance with NRC requirements in the seven areas examined during the inspection.
l 8104220835
.
-
_
.
.
.
.
.