IR 05000331/1981004

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-331/81-04 & on 810317-20.No Noncompliance Noted.Major Areas Inspected:Matl Control & Accountability, Measurement & Controls,Storage & Internal Controls & Shipping & Receiving.Details Withheld (Ref 10CFR2.790)
ML19345G944
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 04/06/1981
From: Creed J, Finley A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19064B192 List:
References
50-331-81-04, 50-331-81-4, NUDOCS 8104220835
Download: ML19345G944 (1)


Text

_

("')s

..

\\_

e U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-331/81-04 Docket No. 50-331 License No. DPR-49 Safeguards Group IV Licensee:

Iowa Electric Light and Power Company Security Building Post Office Box 351 Cedar Rapids, IA 52406 Facility Name: Duane Arnold Energy Center Inspection At:

Palo, IA Inspection Conducted: March 17-20, 1981 Date of Last Material Control and Accounting Inspection: September 6-8, 1978 Type of Inspection: Unannounced Material Control and Accounting

3/-

-

,o,+,s

.

4? 4./

's Inspector:

A. 5.'F'inley, Aud'itor Mb/f/

i Date Approved By:

ed, Acting Chief, f/

.

Safeguards Section Date Inspection Summary Inspection on March 17-20, 1981 (Report No. 50-331/81-04)

Areas Inspected: Material control and accountability including facility organization and accountablility; measurement and controls; storage and internal controls; shipping and receiving; records and reports; inventory and inventory verification; and management of the material control system.

The inspection involved 26 inspector-hours onsite by one NRC inspector.

Results: The licensee was found to be in compliance with NRC requirements in the seven areas examined during the inspection.

l 8104220835

.

-

_

.

.

.

.

.