Forwards Insp Repts 50-387/95-08 & 50-388/95-08 on 950328-0515 & Notice of Deviation.Nrc Recognizes That Departure from FSAR Does Not Concern safety-related Equipment Necessary to Support Basis for Accident Analysis
ML17158A712
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/15/1995
From: Jason White
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17158A713 List:
References
NUDOCS 9506210075
Download: ML17158A712 (5)


See also: IR 05000328/2005015

Text

PRIDRIT'Y Z

REGULATORY<<4855gRA5558fEIFbSVRIIl3lDTION SYSTEM

( RIDS )

ACCESSION NBR:9506210075

DOC.DATE: 95/06/15

NOTARIZED: NO

DOCKET ¹

FACIL:50-387 Susquehanna

Steam Electric Station, Unit 1, Pennsylva

05000387

~

~

~

50-388

Susquehanna

Steam Electric Station, Unit 2, Pennsylva

05000388

UTH.NAME

AUTHOR AFFILIATION

HITEiJ.R.

Region

1 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

BYRAM,R.G~

Pennsylvania

Power

6 Light Co.

SUBJECT:

Forwards insp repts

50-387/95-08

6 50-388/95-.08

on

950328-0515

6 notice of deviation.NRC recognizes

that

departure

from FSAR does

not concern safety-related

equipment

necessary

to support basis for accident analysis.

DZSTRZBUTZON CODE:

ZEOZD

COPZES

RECEZVED:LTR g ENCL J

SZSE: 4 f r27

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

P

0

NOTES:

05000387

R

RECIPIENT

ID CODE/NAME

PD1-2

PD

INTERNAL: ACRS

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRCH/HHFB

OE DIR

RGN1

FILE

01

EXTERNAL: LITCO BRYCEgJ

H

NRC PDR

NOTES:

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

'

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

POSLUSNYiC

AEOD/DEIB.

AEOD/~C

F~E-GEN%ER

NRR/DORS/OEAB

NUDOCS-ABSTRACT

OGC/HDS2

NOAC

COPIES

LTTR ENCL

1

'1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

D

0

U

YOTE TO ALL"RIDS" RECIPIENTS:.

Pl EASE HELP US TO REDUCE WASTE! COiNTACTTHE DOCLMEYTCOYTROL

DESK, ROOM PI -37 (EXT. 504-20S3 ) TO ELIMIYATEYOUR YAME FROiI

DISTRIBL'TIOY.LISTS FOR DOCUMENTS YOU DOi"1'EED!

~

~

1

)

~

I

~

~

~

~

~

~

0

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

June

15,

1995

Mr. Robert

G.

Byram

Senior Vice President - Nuclear

Pennsylvania

Power

& Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

SUBJECT:

NRC COMBINED INSPECTION REPORT

NOS. 50-387/95-08;

50-388/95-08

AND

NOTICE OF DEVIATION

Dear Mr. Byram:

The enclosed report documents

a resident

inspection

conducted

by Ms. H.

Banerjee,

Mr. B. J.

McDermott,

and others

from March 28,

1995 through

Hay 15,

1995, at the Susquehanna

Steam Electric Station

(SSES),

Salem Township,

Pennsylvania.

Areas relevant to the health and'safety of the public examined

during the inspection

are described

in the enclosed report.

At the conclusion

of the inspection,

the inspectors

summarized

the inspection findings with Mr.

H.

G. Stanley

and other members of your staff.

In summary,

the inspectors

concluded that the first forty five day refueling

outage at Susquehanna

Unit

1 was conducted

in a safe

and well controlled

manner with good supervisory oversight

and conservative

decision making.

Based

on the results of this inspection,

one activity appeared

to be

a

deviation from the

SSES Final Safety Analysis Report,

as specified in the

enclosed

Notice of Deviation (Notice).

On January

30,

1995, the Unit 2

non-vital instrument uninterruptible

power supply

(UPS)

2D240 failed a

post-maintenance

surveillance test

and

was returned to its normal operational

alignment in a degraded

condition.

The

FSAR states that when the

UPS is

inoperable,

the external

maintenance

bypass will be used to bypass

the

UPS and

supply its loads directly from the alternate

power supply.

The

UPS was in an

alignment contrary to the

FSAR description until April 15,

1995,

when it

failed to provide backup battery

power 'or transfer its alternate

supply in

response

to an electrical perturbation.

The

NRC recognizes

that this departure

from the

FSAR does not concern safety-

related

equipment

necessary

to support 'the basis for the facility accident

analysis.

Notwithstanding this, the

UPS failure caused

an unnecessary

complication for the operators

during the post scram recovery.

You are requested

to respond to this letter,

and should follow the

instructions specified in the enclosed

Notice when preparing your response.

In your response,

you should document the specific actions taken

and any

additional actions you plan to prevent recurrence.

After reviewing your

response

to this Notice, including your proposed corrective actions

and the

results of future inspections,

the

NRC will determine

whether further

NRC

action is necessary

to ensure

compliance with FSAR commitments.

95062i 0075 '750615

PDR

ADQCK 05000387

8

PDR

Mr. Robert

G.

Byram

2

In accordance

with 10

CF

90 of t e

Your cooperation with us in this matter is appreciated.

Si

erel

R 2.7

h

NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

The responses

requested

by this .letter and the enclosed

notice are not subject

to the clearance

procedure of the office of management

and Budget

as required

by 'the Paperwork Reduction Act of 1980, Public law No. 96.511.

John

R. White, Chief,

Reactor Projects,

Section

2A

Docket Nos. 50-387;50-388

Enclosure:

1.

Notice of Deviation

2.

Combined

NRC Inspection

Report 50-387/95-08;

50-388/95-08

S

Hr. Robert

G.

Byram

cc-we c

.

/n l.

H.

G. Stanley,

Vice President

Nuclear Operations

G. T. Jones,

Vice President -'uclear Engineering

J.-H.

Kenny, Nuclear Licensing

H. H. Urioste, Nuclear Services

Hanager

C.

D. Lopes,

Hanager

Nuclear Security

W. Burchill, Hanager,

Nuclear Assessment

Services

R.

R. Wehry, Nuclear Licensing

Susquehanna

H. D. Woodeshick,

Special Office of the President

J.

C. Tilton, III, Allegheny Electric Cooperative,

Inc.

Nuclear Safety Information Center

(NSIC)

Commonwealth of, Pennsylvania

Mr. Robert

G.

Byram

Distribution w/encl:

Region I Docket

Room (with concur rences)

K. Gallagher,

DRP

PUBLIC

D. Screnci,,PAO

(2) Inspection

Reports

(20)

SALP

NRC Resident

Inspector

Distribution w/encl: (Via E-Hail)

W. Dean,

OEDO

C. Poslusny,

Project Hanager,

NRR

J. Stolz,

PDI-2,

NRR

Inspection, Program Branch,

NRR (IPAS)

DOCUMENT NAME:

a:9508.sus

To receive a copy ofthh document, hrhte In the bmc 'C'

Copy without attachment/enclosure

'E'

Copy with

attachment/enclosure

'hP ~ No copy

OFFICE

RI:DRP

NAME

BHcDermo

DATE

6/

/95

RI:DRP

SBarbe

6/I /9

OFFICIAL RECORD

PY

95