ML17158A712
| ML17158A712 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/15/1995 |
| From: | Jason White NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Byram R PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17158A713 | List: |
| References | |
| NUDOCS 9506210075 | |
| Download: ML17158A712 (5) | |
See also: IR 05000328/2005015
Text
PRIDRIT'Y Z
REGULATORY<<4855gRA5558fEIFbSVRIIl3lDTION SYSTEM
( RIDS )
ACCESSION NBR:9506210075
DOC.DATE: 95/06/15
NOTARIZED: NO
DOCKET ¹
FACIL:50-387 Susquehanna
Steam Electric Station, Unit 1, Pennsylva
05000387
~
~
~
50-388
Susquehanna
Steam Electric Station, Unit 2, Pennsylva
05000388
UTH.NAME
AUTHOR AFFILIATION
HITEiJ.R.
Region
1 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
BYRAM,R.G~
Power
6 Light Co.
SUBJECT:
Forwards insp repts
50-387/95-08
6 50-388/95-.08
on
950328-0515
6 notice of deviation.NRC recognizes
that
departure
from FSAR does
not concern safety-related
equipment
necessary
to support basis for accident analysis.
DZSTRZBUTZON CODE:
ZEOZD
COPZES
RECEZVED:LTR g ENCL J
SZSE: 4 f r27
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
P
0
NOTES:
05000387
R
RECIPIENT
ID CODE/NAME
PD1-2
INTERNAL: ACRS
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRCH/HHFB
OE DIR
RGN1
FILE
01
EXTERNAL: LITCO BRYCEgJ
H
NRC PDR
NOTES:
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
'
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
POSLUSNYiC
AEOD/DEIB.
AEOD/~C
F~E-GEN%ER
NRR/DORS/OEAB
NUDOCS-ABSTRACT
OGC/HDS2
NOAC
COPIES
LTTR ENCL
1
'1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
D
0
U
YOTE TO ALL"RIDS" RECIPIENTS:.
Pl EASE HELP US TO REDUCE WASTE! COiNTACTTHE DOCLMEYTCOYTROL
DESK, ROOM PI -37 (EXT. 504-20S3 ) TO ELIMIYATEYOUR YAME FROiI
DISTRIBL'TIOY.LISTS FOR DOCUMENTS YOU DOi"1'EED!
~
~
1
)
~
I
~
~
~
~
~
~
0
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
June
15,
1995
Mr. Robert
G.
Byram
Senior Vice President - Nuclear
Power
& Light Company
2 North Ninth Street
Allentown, Pennsylvania
18101
SUBJECT:
NRC COMBINED INSPECTION REPORT
NOS. 50-387/95-08;
50-388/95-08
AND
NOTICE OF DEVIATION
Dear Mr. Byram:
The enclosed report documents
a resident
inspection
conducted
by Ms. H.
Banerjee,
Mr. B. J.
McDermott,
and others
from March 28,
1995 through
Hay 15,
1995, at the Susquehanna
Steam Electric Station
(SSES),
Salem Township,
Areas relevant to the health and'safety of the public examined
during the inspection
are described
in the enclosed report.
At the conclusion
of the inspection,
the inspectors
summarized
the inspection findings with Mr.
H.
G. Stanley
and other members of your staff.
In summary,
the inspectors
concluded that the first forty five day refueling
outage at Susquehanna
Unit
1 was conducted
in a safe
and well controlled
manner with good supervisory oversight
and conservative
decision making.
Based
on the results of this inspection,
one activity appeared
to be
a
deviation from the
SSES Final Safety Analysis Report,
as specified in the
enclosed
Notice of Deviation (Notice).
On January
30,
1995, the Unit 2
non-vital instrument uninterruptible
power supply
(UPS)
2D240 failed a
post-maintenance
surveillance test
and
was returned to its normal operational
alignment in a degraded
condition.
The
FSAR states that when the
UPS is
the external
maintenance
bypass will be used to bypass
the
UPS and
supply its loads directly from the alternate
power supply.
The
UPS was in an
alignment contrary to the
FSAR description until April 15,
1995,
when it
failed to provide backup battery
power 'or transfer its alternate
supply in
response
to an electrical perturbation.
The
NRC recognizes
that this departure
from the
FSAR does not concern safety-
related
equipment
necessary
to support 'the basis for the facility accident
analysis.
Notwithstanding this, the
UPS failure caused
an unnecessary
complication for the operators
during the post scram recovery.
You are requested
to respond to this letter,
and should follow the
instructions specified in the enclosed
Notice when preparing your response.
In your response,
you should document the specific actions taken
and any
additional actions you plan to prevent recurrence.
After reviewing your
response
to this Notice, including your proposed corrective actions
and the
results of future inspections,
the
NRC will determine
whether further
NRC
action is necessary
to ensure
compliance with FSAR commitments.
95062i 0075 '750615
ADQCK 05000387
8
Mr. Robert
G.
Byram
2
In accordance
with 10
90 of t e
Your cooperation with us in this matter is appreciated.
Si
erel
R 2.7
h
NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
The responses
requested
by this .letter and the enclosed
notice are not subject
to the clearance
procedure of the office of management
and Budget
as required
by 'the Paperwork Reduction Act of 1980, Public law No. 96.511.
John
R. White, Chief,
Reactor Projects,
Section
2A
Docket Nos. 50-387;50-388
Enclosure:
1.
Notice of Deviation
2.
Combined
NRC Inspection
Report 50-387/95-08;
50-388/95-08
S
Hr. Robert
G.
Byram
cc-we c
.
/n l.
H.
G. Stanley,
Vice President
Nuclear Operations
G. T. Jones,
Vice President -'uclear Engineering
J.-H.
Kenny, Nuclear Licensing
H. H. Urioste, Nuclear Services
Hanager
C.
D. Lopes,
Hanager
Nuclear Security
W. Burchill, Hanager,
Nuclear Assessment
Services
R.
R. Wehry, Nuclear Licensing
Susquehanna
H. D. Woodeshick,
Special Office of the President
J.
C. Tilton, III, Allegheny Electric Cooperative,
Inc.
Nuclear Safety Information Center
(NSIC)
Commonwealth of, Pennsylvania
Mr. Robert
G.
Byram
Distribution w/encl:
Region I Docket
Room (with concur rences)
K. Gallagher,
PUBLIC
D. Screnci,,PAO
(2) Inspection
Reports
(20)
NRC Resident
Inspector
Distribution w/encl: (Via E-Hail)
W. Dean,
OEDO
C. Poslusny,
Project Hanager,
J. Stolz,
PDI-2,
Inspection, Program Branch,
NRR (IPAS)
DOCUMENT NAME:
a:9508.sus
To receive a copy ofthh document, hrhte In the bmc 'C'
Copy without attachment/enclosure
'E'
Copy with
attachment/enclosure
'hP ~ No copy
OFFICE
RI:DRP
NAME
BHcDermo
DATE
6/
/95
RI:DRP
SBarbe
6/I /9
OFFICIAL RECORD
PY
95