NRC Security Inspection Report 05000275/2015405 and 05000323/2015405 (Letter)
ML17088A328
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/29/2017
From: Mark Haire
Plant Support Branch-1
To: Halpin E
Pacific Gas & Electric Co
References
IR 2015405
Download: ML17088A328 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 March 29, 2017 Mr. Edward D. Halpin, Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424 SUBJECT DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000275/2015405 AND 05000323/2015405

Dear Mr. Halpin:

On September 3, 2015, the Nuclear Regulatory Commission (NRC) staff completed a Security inspection at the Diablo Canyon Power Plant, Units 1 and 2. This inspection began on May 4, 2015. Issuance of this letter closes NRC Inspection Report 05000275/2015405 and 05000323/2015405. The inspection results associated with the 2015-405 report are documented in Inspection Report 2015-404.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82 cc: Electronic Distribution