IR 05000275/2011405

From kanterella
(Redirected from IR 05000323/2011405)
Jump to navigation Jump to search
IR 05000275-11-405 and 05000323-11-405 on 04/22/2011 for Diablo Canyon Power Plant, Units 1 and 2, NRC Security
ML111400377
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/20/2011
From: Shannon M
Plant Support Branch-1
To: Conway J
Pacific Gas & Electric Co
References
IR-11-405
Download: ML111400377 (4)


Text

UNITE D S TATES NUC LEAR RE GULATOR Y C OMMIS SI ON May 20, 2011

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000275/2011405 AND 05000323/2011405

Dear Mr. Conway:

On April 22, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a supplemental inspection pursuant to Inspection Procedure 95002, Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area, at your Diablo Canyon Power Plant, Units 1 and 2 to follow up on previous security inspection findings. The enclosed inspection report documents the inspection results, which were discussed on April 22, 2011, with you and other members of your staff. The NRC was informed of your readiness for the inspection on January 13, 2011.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The team reviewed selected procedures and records, observed activities, and interviewed personnel.

As required by the NRC Reactor Oversight Process (ROP) Action Matrix, this supplemental inspection was performed because, during a security inspection conducted in March 2010, violations of Greater-than-Green security significance were identified which placed Diablo Canyon Power Plant in the Degraded Cornerstone Column in the third quarter of 2010. The violations which degraded the Security Cornerstone are documented in inspection report 05000275; 323/2010201. Pacific Gas and Electric Company -2-The objectives of this supplemental inspection were to: 1) provide assurance that the root causes and the contributing causes for the risk-significant performance issues were understood; 2) provide assurance that the extent of condition and extent of cause of the issues were identified; and 3) provide assurance that corrective actions were sufficient to address and prevent the recurrence of the root and contributing causes. This inspection also included independent NRC reviews of the extent of condition and extent of cause for the Greater-than-Green violations, and assessments of whether any safety culture component caused or significantly contributed to the issue. The inspection consisted of examination of activities conducted under your license as they relate to safety, compliance with the Commission's rules and regulations, and the conditions of your operating license.

Based on the results of the inspection, no findings were identified.

The NRC determined that your staff performed a comprehensive evaluation of the individual and collective causes for the Greater-than-Green findings, performed an adequate review of the extent of condition and extent of cause of the performance issues, and implemented appropriate corrective actions to address the identified causes.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b) (1) (ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b) (1).

Sincerely,

/RA/

Michael P. Shannon, Chief Plant Support Branch-1 Division of Reactor Safety Pacific Gas and Electric Company -3-Docket Nos.: 50-275, 50-323 License Nos.: DPR-80, DPR-82 Nonpublic Enclosure:

NRC Inspection Report 05000275/2011405 and 05000323/2011405 w/Attachment:

Supplemental Information cc w/enclosure:

Michael Priebe, Security Director Pacific Gas and Electric Company Diablo Canyon Nuclear Plant P.O. Box 56, Mail Station 104/6/601 Avila Beach, CA 93424 cc w/o enclosure:

James R. Becker, Site Vice President Pacific Gas and Electric Company Diablo Canyon Nuclear Plant P.O. Box 56, Mail Station 104/6/601 Avila Beach, CA 93424 Jennifer Post, Esq.

Pacific Gas & Electric Co.

77 Beale Street, Room 2496 Mail Code B30A San Francisco, CA 94120 Pacific Gas and Electric Company -4-Electronic distribution w/enclosure:

Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN 3D43 Branch Chief, RI DRS (James.Trapp@nrc.gov)

Branch Chief, RII DRS/PSB2 (Michael.Ernstes@nrc.gov)

Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)

Senior Resident Inspector (Michael.Peck@nrc.gov)

Electronic distribution w/o enclosure:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

Branch Chief, DRP/B (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)

Project Engineer, DRP/B (Greg.Tutak@nrc.gov)

Project Engineer, DRP/B (Nestor.Makris@nrc.gov)

DC Administrative Assistant (Agnes.Chan@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA:OEDO (Stephanie.Bush-Goddard@nrc.gov)

Security Related Complete Report - OUO:

SUNSI Review Completed: JRL ADAMS: : Yes Initials: JRL

Non-Publicly Available : Sensitive-Security- Related-Periodic Review Required Letter Only:

SUNSI Review Completed: JRL ADAMS: : Yes Initials: JRL

Publicly Available : Non-Sensitive SPSI:PSB1 SPSI:PSB1 PSI:PSB1 EB C:PSB1 C:PBB D: DRS C:PSB1 JLarsen EByre JRollins GPick MShannon GMiller AVegel MShannon

/RA/ /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ /RA/

5/13/11 5/13/11 5/13/11 5/13/11 5/18/11 5/18/11 5/20/11 5/20/11