Insp Rept 50-322/92-04 on 920627-1012.Violations Noted. Major Areas Inspected:Facility Tours,Observation of Work in Progress,Radiological Controls,Surveillance & Maint,Physical Plant Security & Housekeeping
ML20128E198
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 11/05/1992
From: Anderson C, Norris B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20128E108 List:
References
50-322-92-04, 50-322-92-4, NUDOCS 9212080020
Download: ML20128E198 (42)


Text

_

,,

e

..

!

U. S. NUCLEAR REGULATORY COMMISSION

'

REGION.I DOCKET / REPORT No.

50-322/92-04 LICENSE No.

NPF-82 (POL)

LICENSEE:

Long Island Power Authority P.O. Box 628, North Country Road Wading River, New York 11792 FACILITY NAME:

Shoreham Nuclear Power Station

DATES:

June 27,- 1992 - October 12, 1992

'

INSPECTORS:

B. S. Norris, Project Inspector (Shoreham)

F. L. Bower, Reactor Engineer J. T. Furia, Senior Radiation Specialist R. L. Nimitz, Senior Radiation Specialist

,

SUBMITTED:

/d/ W

//- F- %-

'

B. S.' Ndirt{s Date Project Inspector (Shoreham)

"

APPROVED BY:

u

.

C. J[ Anderson, Chief Date

'

Reactor Projects Section 2B

.

AREAS INSPECTED:

On-site and in-office inspection by Region I staff, consisting of facility tours, observation of

.

.

work-in-progress, and review of various licensee procedures and reports. Particular attention.--

was given to procedural adherence, radiological controls, surveillance and maintenance, physical plant security, decommissioning activities, housekeeping, and industrial safety.

4

.

9212080020 921202 PDR ADOCK 03000322 G

PCR

<

. -. *

. - -

..-

-

e

+

l-4

.

EXECUTIVE SUMMARY DECOMMISSIONING PLAN Inconsistencies were identi6ed between the Decommissioning Plan, the physical plant condition, and some equipmen' configurations. LIPA had failed to keep the Commission apprised, in writing, of changes that they had made to the proposed Decommissioning Plan that was under review by the NRC. This is an apparent violation of 10 CFR 50.9(a) (Refarence Section 2.0)

ItADIOLOGICAL CONTROLS Radiation controls personnel and general radiation workers were receiving the appropriate training and pre-job briefings prior to commencement of radiological work activities.

The implementation and adequacy of radiological controls practices was sufficient to casure that occupational radiation exposure was kept as low as reasonably achievable.

The licensee frequently used mock ups to test work techniques prior to actual performance of the activity.

(Reference Sections 3,1 and 3.2)

The engineering work associated with the construction and operation of the dry cutting statio:

was good. High ef6ciency ventilation systems were installed to control potential airborne radioactivity. The licensee plans to use a large diameter milling machine for cutting of the reactor vessel (Reference Section 3.3))

SOLID RADWASTE AND TRANSPORTATION The small volume of spent resin generated was placed in polyethylene liners, dewatered, and shipped to a low-level waste disposal site. The bulk of the radwaste shipments consisted of segmented plant piping and components. Reactor vessel internals were sectioned and placed in liners under water, the liners were then transferred into shipping casks. Bulk piping and valves were shipped in SeaVans. The licensee's radweste shipping prograrn and implementation of the program appeared to be generally good. Howev :r, an unresolved item was identified regarding the sign-off of activities associated with a shipment of irradiated control rod blades in advance of performing the required activities. The liccasee's program for assurance of quality in the radwaste area included vendor audits, supplier surveillances, in-plant audits and surveillances.

(Reference Section 4.0)

FIRE PROTECTION / PREVENTION PROGRAM When the fire protection requirements were moved from the Technical Specifications to the Fire Hazards Analysis Report, the limiting conditions and surveillance requirements related the diesel generators, the emergency switchgear, and the batteries were not incorporated. However, this equipment is required to be operable to support fuel handling. This is an unresolved item.

(Reference Section 5.1)

-

.

.

_ _ _ _ _ - _ _ - _ _

_ -

.

.__

_

_ _ _

L.-

.

The combustible materials control program was clearly denned and well implemented. The fire.

protection equipment was adequately maintained to support the safe storage of the fuel and in accordance with the licensee's fire protection program. - Housekeeping conditions were generahy _

good. The licensee had developed a program for training related to discovering and reporting nres. (Reference Sections 5.2 through 5.5)

SURVEILLANCE AND MAINTENANCE The inspectors monitored. work-in-progress, reviewed procedures and work packages.

Particular attention was given to procedural adherence, radiological controls practices, and housekeeping. All work observed was in conformance with applicable procedures and met the requirements of the Technical Specifications. Several weaknesses were noted in the area of-industrial safety. (Reference Section 6.0)

_

NRC LICENSED OPERATORS A recent amendment to the Technical Specifications eliminated the requirement for NRC licensed operators in the control roora. The applicable program was reviewed by the inspector and found to be acceptable. (Reference Section 7.0)

_

..

I

,

..

SUMMARY REPORT:

SG24 l

SORTED BY ZONE, SYSTEM, MATERIAL TYPE

,

PROGRESS TliROUGil 07/29/92 fSONE: (

1) Drywell Quantity Quantity Quantity To Remove Removect Remaining Valve

0

l i

i'

.

'

~'T--p+

ww y

+

r

-

m e-em-y.-

,,a p

.m

~,--------w-~

+-w-m W-

~

__ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _

,

I RUll DATE: 08/05/92 SilOREllAM DECOMMISSIONING PROJECT PAGE:

RUN TIME: 10:32:17 WORK ZONE REMOVAL SUMMARY REPORT:

SG24

,

SORTED BY DNE, SYSTEM, MATERIAL TYPE

)

PROGRLSS TilROUGli 07/29/92

20NE: (

2) Suppression Pool Quantity Quantity Quantity To Removo Remo"od Romaining R21 Euc_1 gar __Doiler Pipo 332

332 Eli Residual KeaLRemeyni Filter

0

pipe 227

227 Valve

0

i E21.QQJe BDIAY

'

Fi1ter

0

Pipe

0

El Diel Pool Cleanup Other Misc Components

0

Pipo 144

144 Pump

0

Valvo

0

_

_.._.m

_,.. _ _,,

,....

,

,

.

_

-.. _,... _.. -

.,

, -,,.. _.,,

-, _., _ _,.,... _,,,.. _, _

_. _. _ _ _

_

.

-

..- -

_ _ _

_ _ -

_ _ _ _

-.

___ -

_ -.-

.

RUN DATE8 07/30/92 S110REllAM DECOMMISSIONING PROJECT-PAGE:

RUN TIME: 12:12856 WORK ZONE REMOVAL SUMMARY REPORT:

SG24 SORTED BY ZONE, SYSTEM, MATERIAL TYPE

.

PROGRESS TliROUGil 07/29/92

-

l ZONE: (

3) Elev 8 East Quantity Quantity Quantity To Remove Removed Remaining gu gentrol Rod Driya Pipe 155 155

Valve

4

Eli B_ejsidy_a_L.fient Remoy_a.l e

lleat Exchanger

0

Other Misc Components

2

Pipe 1,188 859 329 Pump

0

Valve

86

ERA Core 8901 Pipe 441 406

Pump

0

Valve

39

E_il High_En.a##re _QR9 Lart_Inj e e t192 Other Misc Components

0

Pipe 292

292 Switch

0

Valve

0

,

,G_il Fuel Pool _Qlgan.yp Other Misc Components

0

Pipe 114

114 Valve

0

P11 Process BMgpling Pipo

0

-._.

... -.

._.. _..- -

_

- -.,-

-. - - -

.

RUN DATE: 07/30/92 SilOREllAM DECOMMISSIONING PROJECT PAGE:

RUN TIME: 12:12156 WORK ZONE REMOVAL SUMMARY REPORT SG24

SORTED BY ZONE, SYSTEM, MATERIAL TYPE PROGRESS TilROUGli 07/29/92

20NE: (

4) Elev 8 West Quantity Quantity Quantity To Removo Removed Remaining 911 Control Rod Drive Pipo

53

RAI RitituALX,.At_Reinoyal lleat Exchanger

0

Other Misc Components

1

Pipo 1,290 845 445 Pump

0

Valvo 103

17 K21 90E919ED3

.

Pipo 410 410

Pump

0

Valve

35

Eli High-Eressure coolant Infectior, Other Misc components

0

Pipo

0

Valve

0

911 Fuel Pool Cleanup Pipo

0

Valvo

0

PJJ Procepps Sampling Pipe

0

.

--

, - - -,, -

-

--yrw---,c,rv

- - -

,----r-,,,-

-.... -

4-+

,-r.--3

-

,,-rye---em,-,m,r---

r ww - w--

--

-,

,

v c-.--

,

-w-,e.

--w,v.w--~-e---,--

]

-

.

,.

RUN DATE: 07/30/92 SilOREHAM DECOMMISSION.TNG PROJECT PAGEt

RUN TIME: 12 12356 WORK ZONE REMOVAL SUMMARY REPORT SG24

SORTED BY ZONE, SYSTEM, MATERIAL TYPE

'

PROGRESS TilROUGH 07/29/92 ZONE: (

5) Elav 40 East Quantity Quantity Quantity

To Remove Removed Remaining

)

Cal Cpatrol Rod Drlyg Filter

1

l other Misc Components

10

Pipo 358 358

Valvo

45

Ell Res_idualJiaat_.R9Poval Pipe 518 518

Valvo

22

1121 Core DRIAy

-

Pipo

83

Valve

9

g_(1 liigh-Pressurg__Qoolant Iniection Pipo

0

9_41 ERe1 Poql C1eJDMR Pipo

0

Pal P_tptqpSs Bamp]Ing Pipo 111 111

i

.--

,.

,, -.. - -

,, -

, -, -,,,, -. - -

-

-..

,,.

.

-4

.

RUN DATE: 07/30/92_

' SHOREHAM DECOMMISSIONING PROJECT '

PAGE:

i

'

RUN TIME: 12:12:56.

WORK ZONE REMOVAL SUMMARY REPORT:

SG24

_!

SORTED BY ZONE, SYSTEM, MATERIAL TYPE l

+

PROGRESS THROUGH 07/29/92 l

l EONES (

6) Elev 40 West

Quantity Quantity Quantity

'

To Remove Removed Remaining-

-

Q11 Control-Rod Drive Filter

-

1

l

0 i

Other Misc Components

.147

Pipe 147 Valve

15

.

!

All Risi4911 Heat RfAqyAl Other Misc Components

1 0-Pipe 523 523

Valve

30

-j R11 pore SPIAY Pipe

99

Valve

7

-

111 Ki.gh-Pressure Coolant IDjAgtipJ Pipe

0 2 3 --

.

,

,

gil Fuel Pool cleanMR I

Pipo

0

.

' Valve

0-

211 Process _SamDisng Pipo 101 101

-

>

+

.

__

__

__

_ _ _.

-. _ _ _

,

.o RUN DATE: 07/30/92 Sil0REllAM DECOMMISSIONING PROJECT PAGE:

RUN TIME 12 12 56 WORK ZONE REMOVAL SUMMARY REPORT:

SG24 SORTED DY ZONE, SYSTEM, MATERIAL TYPE

.

'

PROGRESS TilROUGH 07/29/92 20NE (

7) Elev 63 East Quantity Quantity Quantity To Removo Removed Romaining D21 KuRLeBLD20M Pipo

0

Valvo

0

pm Ep_qqtor Water Recirculation Pipo 159

159 Valvo

0

i 911 Control Rqd_p h et Other Misc components

0

Pipo 462

462 Valvo

0

_.

9H TIP D3AktA Other Misc components

0

Pipo

0

Valvo

0

Eli ResidttaL}{ eat Remov41 Pipo 753

753 Valve

0

E21 Core op1 n pipo

0

Valvo

0

.

En Hich-Pressure Coolant InjectioR Pipo 113

113 Valvo

0

9)J Reactor Water clean 113 Pipo

0

g31 Fuel Pool Cleamyg pipo 111

111 p[#

888 88 119

119

.

.

-

l r

RUN DATE: 07/30/92 Sil0RE!!AM DECOMMISSIONING PROJECT PAGE:

RUN TIME: 12112356 WORK ZONE REMOVAL SUMMARY REPORTS SG24

,

SORTED DY ZONE, SYSTEM, MATERIAL TYPE PROGRESS Ti!ROUGil 07/29/92

'

_

20NE: (

8) Elev 63 West

l;uantity Quantity Quantity

a Removo Removed Remaining R21 Nuclear Boiler other Misc Components

0

Pipo

0

Valvo

0

_

C11 CentrnLEsA Driu Filter

0

Other Misc Components

0

Pipo 194

194 Valve

0

_

Eli Refidual float __ Rempy_al Pipo 693

693 Valvo

0

Ell core spray Pipo 174

174 Valve

0

Kil High-PresJure Coolpnt Iniection Pipo

0

Valvo

0

___

Q11 Eng1_Ep_ql_g)oanup Pipo 106

106 E11 Procens Damp)JJ1g Other Misc Components

0

Pipe

0

Valvo

0

,._ -. _ _ _

_ _ _ _ _ _ - -.

-

_

_. _ _ _ - - -. _ _ _ _ _ ____ __ _ _

.

'

.

RUN DATE: 07/30/92 SHOREHAM DECOMMISSIONING PROJECT PAGE:

RUN TIME 12:12:56-WORK ZONE REMOVAL SUMMARY.

REPORT:

SG24

SORTED BY ZONE, SYSTEM, MATERIAL TYPE

PROGRESS THROUGH 07/29/92 RONE: (

9) Elev 78 East

._

Quantity Quantity Quantity To Remove Removed Remaining All Engitir_soller Other Misc Components

0

Pipe 273

273 Valve

0

.

a gli gentrol Rod Drive Other Misc Components

1 0-Pipe 5,286 5,264

Switch

7

Valve

50

gil TIP Sysing Other Misc Components

0

Pipe

0

Valve

0

Eli Roaidgal__KtAt_Agjo&Y.pl Pipe 143

133 Valve

0

E11 gate sprav Pipe

0

Valve

0-12-

.

gli 11 auld Radwasta Pipe

0

gal Remotor water cleangy Pipe 366

_366 Valve-17 0-

_. _ _.

gil Fuel Pool Cleanuy Pipe

0

Valve

0

211 Process Sampling Pipe 139

139_

d

>

-

C

O

'

RUN DATE8 07/30/92 SHOREHAM DECOMMISSIONING PROJECT PAGEt

RUN TIME 12112156 WORK ZONE REMOVAL SUMMARY REPORT SG24 SORTED BY ZONE, SYSTEM, MATERIAL TYPE PROGRESS THROUGH 07/29/92

RONE: ( 10) Elev 78 West Quantity Quantity Quantity To Remove Removed Remaining

_..

En Muglear Boll u Other Misc Components

Pipe

439 Valve

0

roi ned_ Drive

-

O switch Valve

26

g Residual Heat Removal 176

145 Va e

5

3 Core sorsty

Valve In High-Pressure Cpolant IDjection Other Misc Components

0 Pipe

_

_

gli Licuid_Radvagit Pipe

0

9 Fuel Pool CleanUD 257

257

,

a

_ _. _. _ _

...__ __ _ _

. _ _ _ _ _

.

e RUN DATE: 08/05/92 SilOREllAM DECOMMISSIONING PROJECT PAGE:

RUN TIME: 10t32117 WORK ZONE REMOVAL SUMMARY REPORT:

SG24

,

SORTED BY ZONE, SYSTEM, MATERIAL TYPE PROGRESS Ti!ROUGli 07/29/92 ZONE: ( 11) Elev 112 East

.

Quantity Quantity Quantity To Removo Romoved Romaining R 2 1 Ily_9 1 9 a E _ D 9 1 1.e._t Pipe

0

Valve

0

.

Gli Gsntr_qLR9A_ Drive Pipe

0

Valve

0

pli 1,1guld Radwa_p_Le Other Misc Components

0

Pipe 1,417

1,417 Switch

0

Tank

0

Pump

0

Valve

0

pla R9 actor Water Cleanup Heat Exchanger

0

Other Misc Components

0

Pipo 1,141

1,141 Valve 129

129 9.11 fuel PooJ_Qle_anup Pipe 422

422 Valve

0

_

231 Erscess Sampilng Pipe 398

398

,

l l-

_.

__

_

__

e RUN DATE: 08/05/93 SIIOREllAM DECOMMISSIONING PROJECT PAGE:

RUN TIME: 10 32117 WORK ZONE REMOYAL SUMMAEY REPORT:

SG24 a-SORTED BY ZONE, SYSTEM, MATERIAL TYPE PROGRESS TilROUGli 07/29/92 EONE: ( 12) Elev 112 West Quantity Quantity Quantity To Remove Removed Romaining D._2_1 N171 ear __B9Q11R Pipe

0

Valve

0

Eli ReRid_qal__}{ eat Regola1 Pipe

0

Valve

0

.

911 ki_qvid RadyAs_ts Pipo 118

118 911 RfAp_ tor water. glannyp

Pipe

0

G41 DIA1 Pool ClegApp Other Misc Components

0 S

Pipe 1,250

1,250 Pump

0

Valve

0

t

-

-

..

e RUN DATE: 08/05/92 SilOREllAM DECOMMISSIOllING PROJECT PAGE

RUll TIMER 10:32:17 WORK ZONE REMOVAL SUMMARY REPORT:

SG24

,

SORTED BY ZONE, SYSTEH, MATERIAL TYPE

]

PROGRESS TilROUGil 07/29/92 2ONE: ( 13) Elev 150 Quantity Quantity Quantity To Removo Removed Remaining K11 RuldRal_) Jest Reggynl Pipo

0

i Valvo

0

?

~

GH Bra.Atar_later c1e_anyn Filter

0

Other Misc components

0

Pipo 1,084

1,084 Tank

0

,

Pump

0

Valvo 108

108 l

Gn Biel Pool._C1HILup float Exchanger

0

1 Other Misc components

0

1 Pipo 1,514

1,514 Pump

0

Valvo

0

Ell Ergoess Sampling float Exchanger

0

Other Misc Components

0

Pipo 448

448 Switch

0

Valve

0

i i

i

. - -

.,,

..

m

,.

...-,m-

.

-, - - - -.

,, _..-

,,~~.~_...y.,,7.~._,..--

-,.

y--

-

_. _... _. _ __.._.

..- - _ - -.

_ - -

-

,

RUN DATEt 08/05/92 SHOREllAM DECOMMISSIONING PROJECT PAGE:

.

RUN TIME: 10132 17 WORK ZONE REMOVAL SUMMARY REPORT SG24 SORTED BY ZONE, SYSTEM, MATERIAL TYPE PROGRESS Ti!ROUGli 07/29/92 20 net ( 20) Turbine Bldg

_

Quantity Quantity Quantity To Remove Removed Romaining Dil R#Antar_.X.ater Cleanum Pipe 469

409 911 Dtel Pool citanyg Pipe 1,013

1,013 Valvo

0 2-

., -. -.., - _..

-.

-. -

. - - -.

_ --

.. -. -.., _.

... -

-

,

.

.

-

.. -

-

- - _.... _

.-.

.

-.. -...

-._

- - _. _.- -.-.

.

_ _. -

'

.

RUN DxTT, 08/05/92 Sil0REllAM DECOMMISSIONING PROJECT PAGES

  • RUN TIMEt 10:32:17 WORK ZONE REMOVAL SUMMARY REPORT:

SG24 SORT)'D BY ZONE, SYSTEM, MATERIAL TYPE PROGRESS TilROUGil 07/29/92 p-

{gDNES ( 30) Radwante Bldg Quantity Quantity Quantity To Removo Removed Romainir.g

I Q11 LiqM14_., A5(M3.9 Y

Pipo

0

Valve

0

i

_%_

._

911 Recto _r y.ater ct,anga Pipe

0

.

'

9.11 Fue1 Pqq M in nup other Hive components

0

Pipo 603

603 Tank

0

-

Valvo

0

K51 Cradannate DomineJalizer other Misc components

0

Pipo 560

560 Tank

0

Pump

0

Valve

0

l

-

.

  1. -.

w-v-9-----

c

-

y7 y

y yy.a.

-q*-+---+,--er p--

y wq-g----

m-v-:---e-T----r

-

P e

w-1-- - - - " - * - ' ' -

7v--

-

-w-7

=r m'N---rvww

'-=Fu

"-

W-'M

.- _ _

_ _ _ _ - _ _ _ _ _ _ _ _ _. __

_ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _

..

l

STATUS _ QF RPV INTERNALS SEGMENTATIQhl

_

AFTER RECEIPT OF THE DECOMMIS$10NING ORDER, THE FOLLOWING RPV INTERNALS WERE REMOVED AND SEGMENTED:

1.

TEN IRM/SRM DRY TUBES WERE CUT / REMOVED AND TEMPORARILY G10 RED IN THE SPENT FUEL STORAGE POOL. TWO OF THE TWELVE DRY

~UBE9 STILL HEMAIN IN THE RPV THEY WILL BE REMOVED AT A LATER DATE.

.

2.

THE TOP GUIDE WAS REMOVED, PLACED IN THE WCS, SEGMENTED,.

PLACED IN LINERS, AND SHIPPED OFF SITE.

i i

'

3.

THE INTERNAL FEEDWATER AND CORE SPRAY SPARGER PIPING HAS BEEN REMOVED, PLACED IN C VANS AND SHIPPED OFF SITE.

.

4.

THE MS/SD GUIDE RODS HAVE BEEN CUT, REMOVED AND AWAIT FURTHER SEGMENTATION IN THE WCS.

.

5.

THE SHROUD ABOVE THE CORE PLATE WAS CUT INTO THREE RING SECTIONS AND REMOVED FROM THE VESSEL:

l

'

-THE TOP SHROUD RING IS CURRENTLY BEING SEGMENTED IN THE WCS.

THE OTHER TWO SHROUD RINGS HAVE BEEN SEGMENTED IN THE WCS, PLACED IN LINERS, AND SHIPPED OFF SITE.

6.

THE JET PUMP HOLDOWN BFAMS WERE SEVERED TO RELEASE THE RAMS

,

HEAD FROM THE DIFFUSER ANie RISER SECTION.

7.

TEN RAMS HEAD WERE REMOVED AND PLACED IN THE WCS AND AWAIT FURTHER SEGMENTATION.

!

8.

TEN JET PUMP RISES ADAPTERS WERE CUT, REMOVED, AND PLACED IN l

THE WCS. THEY WILL BE PLACED IN LINERS FOR SHIPMENT OFF SITE.

'

9.

TEN JET PUMP RISERS WERE FURTHER CUT, REMOVED, AND PLACED IN THE WCS AND AWAIT FURTHER SEGMENTATION.

,

!

.

. _,.,

_., _, _ ~

-

- - -

-.

.

-

. -

,

CDMPOMEST_ DOSE RATES

-

CHMEONEST D_OEEEATE RPV INTERNALS:

Top Guide 94 R/hr @ 6" water Dry Tubes 49 R/hr - contact Core Shroud 9 R/hr @ 6" water

.

Jet Pumps 2 R/hr - contact Core Plate 1 R/hr - contact Guide Tubes 120 mR/hr - contact Steam Separator 2 mR/hr - contact Steam Dryer

< 1 mR/hr - contact NUCLEAR FUEL 94 R/hc - contact CONTROL ROD BLADES 100 R/hr - contact RPV EXTERIOR (DRY)

< 5 mR/hr - contact RECIRCULATION PIPING 0.3 mR/hr - contact

.

+

y

,,-----,n

.-

n-,,.,

-,. --, -.

,,,,

,

.

.

GENERALAREA DOSE _ RATES

.

AREA DOSE RATE

'

Refuel Floor - 175' el

< 0.5 inR/lir

~

Rx Cavity 0.5 mR/lir Wet Cuttinji Station 0.5 mR/hr

-

Drywell

-

< 0.5 mR/hr Rx Building

< 0.5 mR/hr

-

,

Radwaste Building

< 0.5 mR/hr Turbine Building

< 0.5 mR/hr

.

..

_ _ _. _ - _ _.

_

_

. _ _.

_ _

_ _ _ _ _.

_.

_ _

. _.

$J

,

CL1URINVENTORY

,

CORPONENT CLRIES Nuclear Fuel 176,000 Control Rod Blades 960 Reactor Vessel (including internals)