Category:CORRESPONDENCE-LETTERS
MONTHYEARML20138H3831999-10-25025 October 1999 Forwards Draft Model of Renewed License for Calvert Cliffs, Unit 2 to Illustrate How List of Minimum Requirements Could Be Incorporated Into License Condition ML20217M9991999-10-22022 October 1999 Forwards Response to NRC 990930 RAI Re Void Swelling Degradation Mechanism,Per License Renewal Application for Ccnpp,Units 1 & 2 ML20217M1721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept Form Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20212M2631999-10-0404 October 1999 Informs That Staff Concluded That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Calvert Cliffs Nuclear Power Plant ML20216J8671999-10-0101 October 1999 Forwards Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant. Rev Accurately Presents Changes Made Since Previous Submittal,Necessary to Reflect Info & Analyses Submitted to NRC or Prepared,Per to NRC Requirements ML20212J7811999-09-30030 September 1999 Requests That Licensee Address Potential Aging Mgt Issue Re Effects of Void Swelling of Rv Internals by Making Plant Specific Commitment to Implement Focused age-related Degradation Insp for Evidence of Void Swelling in Future ML20212J5611999-09-29029 September 1999 Informs That on 990916,NRC Completed mid-cycle Plant Performance Review of Calvert Cliffs.No Areas in Which Util Performance Warranted Addl Insp Beyond Core Insp Program Identified.Historical Listing of Plant Issues,Encl ML20216H7831999-09-28028 September 1999 Forwards Addl Info Re NRC SER for Ccnpp,Units 1 & 2,per License Renewal Application ML20212D5361999-09-20020 September 1999 Forwards Rev 1 to Calculation CA04048, Fuel Handling Accident During Reconstitution, as Agreed During 990909 Telcon ML20212C1861999-09-15015 September 1999 Requests That NRC Complete Review of TR CED-387-P,Rev 00-P, Abb Critical Heat Flux Correlations for PWR Fuel, by 000201.Util Expects to Use ABB-NV Correlation for Current non-mixing Vane Fuel in Reload Analyses in 2000 for Ccnpp ML20212A2001999-09-0808 September 1999 Forwards Insp Repts 50-317/99-06 & 50-318/99-06.Two Violations Being Treated as Noncited Violations ML20211N8971999-09-0707 September 1999 Responds to Ltr to D Rathbun of NRC Dtd 990720,in Which Recipient Refers to Ltr from Wc Batton Expressing Support on Renewal Application of Baltimore Gas & Electric Co for Calvert Cliffs Plants ML20211H9841999-08-31031 August 1999 Provides Comments Re Data Entered in Rvid for Ccnpp,Units 1 2,per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211K3091999-08-27027 August 1999 Informs That During 990826 Telcon,L Briggs & B Bernie Made Arrangements for NRC to Inspect Licensed Operator Requalification Program at Calvert Cliffs Npp.Insp Planned for Wk of 991025 ML20211J1611999-08-17017 August 1999 Documents Bg&E Consultations with MD Dept of Natural Resources Re Potential Impacts to Chesapeake Bay Critical Area & Forest Interior Dwelling Bird Habitat,Per Ccnpp License Renewal.Telcons Ref Satisfy Consulting Requirement ML20210V1181999-08-17017 August 1999 Forwards Toxic Gases Calculations for Control Room Habitability,As Discussed During 990713 Telcon.Util Will Make Final Submittal for Toxic Gases After NRC Has Completed Review of ARCON96 ML20210T5061999-08-16016 August 1999 Forwards Rev 0 to Ccnpp COLR for Unit 2,Cycle 13, Per Plant TS 5.6.5 ML20210U2761999-08-13013 August 1999 Forwards Listed Info Re Guarantee of Payment of Deferred Premiums for Ccnpp,Units 1 & 2,IAW 10CFR140.21 Requirements ML20210S8131999-08-12012 August 1999 Forwards Summary of Various Open Licensing Actions for Bg&E That Were Completed During Unit 2 Refueling Outage Ending 990506 ML20210S8101999-08-12012 August 1999 Forwards Application Requesting Renewal of License for Mv Seckens,License SOP-10369-2.Without Encl ML20210S7901999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data for Period of 990101-990630,IAW 10CFR36.71(d) ML20210Q1941999-08-11011 August 1999 Informs That Info Submitted in 981130 Application Re CEN-633-P,Rev 03-P,dtd Oct 1998,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20210N5881999-08-0606 August 1999 Forwards ISI Rept for Ccnpp,Unit 2,fulfilling Intentions & Requirements Stated in Program Plan & Commitment to Comply with ASME Code Section XI ISI Requirements ML20210N1291999-08-0505 August 1999 Forwards NRC Response to W Batton Ltr Expressing Support of Renewal Application for Calvert Cliffs Plants as Requested in Ltr ML20210N5491999-08-0505 August 1999 Requests That License SOP-10371-2,for RW Scott,Be Renewed IAW 10CFR55.57.Individual Has Satisfactorily Discharged License Responsibilities Competently & Safely.Without Application ML20210N5471999-08-0505 August 1999 Requests That License SOP-10031-3,for DF Theders,Be Removed from Active Files for Ccnpp,Due to Individual Being Reassigned to Position No Longer Requiring License ML20210N9291999-08-0404 August 1999 Forwards Clarification to Initial Response to Biennial Rept on Status of Decommissioning Funding,As Required by 10CFR50.75(f)(1) ML20210J0741999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by Nrc.Web Site Should Reflect Info within 2 Wks ML20211B5381999-07-30030 July 1999 Expresses Appreciation for Support in Y2K Training & Tabletop Exercise Held on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by NRC ML20211C0951999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20211C3251999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20210E4941999-07-23023 July 1999 Informs That 1999 Emergency Response Plan Exercise Objectives Is Scheduled for Wk of 991025.Exercise Scenario Will Test Integrated Capability & Major Portion of Elements Existing within Emergency Response Plan ML20210D0911999-07-22022 July 1999 Responds to to Chairman Jackson Referring to Ltr from New 7th Democratic Civic Club,Inc.Forwards Staff Response to W Batton,President of New 7th Democratic Civic Club,Inc ML20210C5011999-07-21021 July 1999 Informs That SL Walters,License OP-10096-3 & CC Zapp,License Number SOP-2188-9,have Been Reassigned within Organization & No Longer Require NRC License,Per 10CFR50.74(a).Removal of Subject Licenses from Active Files for Ccnpp,Requested ML20210C2681999-07-20020 July 1999 Forwards Certified Copy of Listed Nuclear Liability Policy Endorsement,Per 10CFR140.15(e) ML20210A5021999-07-20020 July 1999 Responds to ,Expressing Support for Renewal of Operating Licenses for Calvert Cliffs Plant & to Concerns Re Lack of Specificity for License Renewal Regulations & Length of Time Set Aside for Public Comment ML20211N9101999-07-20020 July 1999 Forwards Correspondence Author Received from New 7th Democratic Club Civic,Inc Raising Some Serious Concerns About Renewal of Nuclear Reactor Licenses for Calvert Cliffs Power Plant ML20210C8461999-07-19019 July 1999 Informs That CF Farrow,License OP-10648-1,will No Longer Be Employed with Bg&E,As of 990709,per 10CFR50.74(a).Removal of Subject License from Active Files for Ccnpp,Requested ML20209J5171999-07-16016 July 1999 Forwards Comments from Accuracy Review of License Renewal Application SER ML20210B7651999-07-15015 July 1999 Forwards SER Denying Licensee Proposed TS Amend Dtd 981120, to Delete TS Requirements for Tendon Surveillance & Reporting Because TS Requirements Duplication of Requirements in 10CFR50.55a.Notice of Denial Encl ML20209G2081999-07-13013 July 1999 Forwards Insp Repts 50-317/99-05 & 50-318/99-05 on 990509- 0626.No Violations Noted ML20210A6311999-07-0606 July 1999 Discusses Closure of TACs MA0532 & MA0533 Re Response to Requests for Addl Info to GL 92-01,rev1,suppl 1, Reactor Vessel Structural Integrity, for Plant,Units 1 & 2 ML20209C1391999-07-0202 July 1999 Forwards Responses to Open & Confirmatory Items Based on Review of SER for Bg&E Application for Renewal of Operating Licenses for Calvert Cliffs.Bg&E Intends to Forward Comments Based on Accuracy Verification in Near Future ML20210D1531999-06-30030 June 1999 Informs of Receipt of from New 7th Democratic Civic Club,Inc Expressing Support for License Renewal. Requests Consideration in Addressing Concerns & Recommendations ML20209B5781999-06-29029 June 1999 Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML20210D1741999-06-24024 June 1999 Expresses Opinions on Renewal of Nuclear Reactor Licenses Re Plant & Support Renewal Application of Bg&E.Requests That NRC Revise Procedures to Allow Sufficient Time for Public to Review,Evaluate & Respond to Info ML20211H8431999-06-23023 June 1999 Ack Participation of Calvert Cliffs Nuclear Engineering Dept in NRC Cooperative Research Project with Univ of Virginia. Copy of Relevant Portion of NRC Cooperative Agreement with Univ of Virginia Encl ML20196C6831999-06-21021 June 1999 Discusses Proposed Alternative Submitted by Bg&E for Calvert Cliffs NPP to Requirements of 10CFR50.55a(g)(4) in Regard to Compliance with Latest Approved Edition of ASME Code,Section XI for Third Ten Year Insp Interval Beginning on 990701 ML20196C4291999-06-21021 June 1999 Forwards Rev to ERDS Data Point Library for Ccnpp,Unit 2,per 10CFR50,App E,Section VI.3.a.Table Provides Brief Summary of Changes ML20195J8271999-06-16016 June 1999 Ack Receipt of to Jackson,Chairman of NRC Re Environ Impacts of Increased Patuxtent River Complex Flight Operations on Ccnpp.Clarification & Correction of Listed Statement Found on Page Two,Provided 1999-09-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20138H3831999-10-25025 October 1999 Forwards Draft Model of Renewed License for Calvert Cliffs, Unit 2 to Illustrate How List of Minimum Requirements Could Be Incorporated Into License Condition ML20217M1721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept Form Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20212M2631999-10-0404 October 1999 Informs That Staff Concluded That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Calvert Cliffs Nuclear Power Plant ML20212J7811999-09-30030 September 1999 Requests That Licensee Address Potential Aging Mgt Issue Re Effects of Void Swelling of Rv Internals by Making Plant Specific Commitment to Implement Focused age-related Degradation Insp for Evidence of Void Swelling in Future ML20212J5611999-09-29029 September 1999 Informs That on 990916,NRC Completed mid-cycle Plant Performance Review of Calvert Cliffs.No Areas in Which Util Performance Warranted Addl Insp Beyond Core Insp Program Identified.Historical Listing of Plant Issues,Encl ML20212A2001999-09-0808 September 1999 Forwards Insp Repts 50-317/99-06 & 50-318/99-06.Two Violations Being Treated as Noncited Violations ML20211N8971999-09-0707 September 1999 Responds to Ltr to D Rathbun of NRC Dtd 990720,in Which Recipient Refers to Ltr from Wc Batton Expressing Support on Renewal Application of Baltimore Gas & Electric Co for Calvert Cliffs Plants ML20211K3091999-08-27027 August 1999 Informs That During 990826 Telcon,L Briggs & B Bernie Made Arrangements for NRC to Inspect Licensed Operator Requalification Program at Calvert Cliffs Npp.Insp Planned for Wk of 991025 ML20210Q1941999-08-11011 August 1999 Informs That Info Submitted in 981130 Application Re CEN-633-P,Rev 03-P,dtd Oct 1998,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20210N1291999-08-0505 August 1999 Forwards NRC Response to W Batton Ltr Expressing Support of Renewal Application for Calvert Cliffs Plants as Requested in Ltr ML20211C0951999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20210J0741999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by Nrc.Web Site Should Reflect Info within 2 Wks ML20211C3251999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20211B5381999-07-30030 July 1999 Expresses Appreciation for Support in Y2K Training & Tabletop Exercise Held on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by NRC ML20210D0911999-07-22022 July 1999 Responds to to Chairman Jackson Referring to Ltr from New 7th Democratic Civic Club,Inc.Forwards Staff Response to W Batton,President of New 7th Democratic Civic Club,Inc ML20210A5021999-07-20020 July 1999 Responds to ,Expressing Support for Renewal of Operating Licenses for Calvert Cliffs Plant & to Concerns Re Lack of Specificity for License Renewal Regulations & Length of Time Set Aside for Public Comment ML20210B7651999-07-15015 July 1999 Forwards SER Denying Licensee Proposed TS Amend Dtd 981120, to Delete TS Requirements for Tendon Surveillance & Reporting Because TS Requirements Duplication of Requirements in 10CFR50.55a.Notice of Denial Encl ML20209G2081999-07-13013 July 1999 Forwards Insp Repts 50-317/99-05 & 50-318/99-05 on 990509- 0626.No Violations Noted ML20210A6311999-07-0606 July 1999 Discusses Closure of TACs MA0532 & MA0533 Re Response to Requests for Addl Info to GL 92-01,rev1,suppl 1, Reactor Vessel Structural Integrity, for Plant,Units 1 & 2 ML20211H8431999-06-23023 June 1999 Ack Participation of Calvert Cliffs Nuclear Engineering Dept in NRC Cooperative Research Project with Univ of Virginia. Copy of Relevant Portion of NRC Cooperative Agreement with Univ of Virginia Encl ML20196C6831999-06-21021 June 1999 Discusses Proposed Alternative Submitted by Bg&E for Calvert Cliffs NPP to Requirements of 10CFR50.55a(g)(4) in Regard to Compliance with Latest Approved Edition of ASME Code,Section XI for Third Ten Year Insp Interval Beginning on 990701 ML20196E0371999-06-16016 June 1999 Forwards Insp Repts 50-317/99-03 & 50-318/99-03 on 990321-0508.Apparent Violation Being Considered for Escalated Enforcement Action ML20207G4331999-06-0707 June 1999 Informs That in Response Request by Nrc,Fema Evaluated Adequacy of Evacuation Plans & Training of Local First Responders for Area Around Ccnpp.Copy of FEMA & Encl to Ltr,Which Provides FEMA Recommendations Encl ML20207G4701999-06-0707 June 1999 Informs of Reorganization in NRR Ofc,Effective 990328. Organization Chart Encl ML20207B2491999-05-21021 May 1999 Forwards Insp Repts 50-317/99-04 & 50-318/99-04 on 990405-16.No Violations Noted.Insp Revealed Few Potential & Plausible Aging Effects NRC Team Determined Should Be Included in License Renewal Application ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML20206A6171999-04-22022 April 1999 Responds to Request for Statistics on Allegation Re Plant by J Osborne.Encl Tables Provides Breakdown of Allegations by Source Category for Allegations Receive in CY95-98 & First Six Month of 1999 ML20205R0961999-04-15015 April 1999 Forwards Insp Repts 50-317/99-01 & 50-318/99-01 on 990131- 0320.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20205P1381999-04-0909 April 1999 Discusses 990223 Ppr.Forwards Plant Issues Matrix & Insp Plan.Since Spring 1998 Unit 1 Operated at Essentially Full Power.Unit 2 Had Similar Power History Except for Jul 1998 Manual Reactor Trip Due to Small Bore Pipe Steam Leak ML20205P1281999-04-0808 April 1999 Forwards Monthly Status Rept on Licensing Activities & Regulatory Duties of NRC for Mar 1999.Targets for Licensing Action Age & Completion Rates & License Renewal Process for Calvert Cliffs Remains on Schedule ML20205E5511999-03-26026 March 1999 Forwards Insp Repts 50-317/99-02 & 50-318/99-02 on 990208-12.No Violations Noted.Insp Was First of Three Planned Visits to Verify Ccnpp License Renewal in Compliance with Requirements of Rule for License Renewal ML20205G8841999-03-24024 March 1999 Discusses Bg&E Application Filed on 980408 for Renewal of Operating Licenses DPR-53 & DPR-68 for Calvert Cliffs Units, 1 & 2.For Listed Reasons,Partial Exemption from 10CFR170 Fees Granted IAW 10CFR170.11(b)(1) ML20205B0291999-03-24024 March 1999 Informs That Author Determined That Partial Exemption from 10CFR170 Fee Requirements Appropriate for Footnote 4 of License Renewal Application for Plants,Units 1 & 2,dtd 980408,that Staff Determines Has Generic Value to Industry ML20204H6281999-03-21021 March 1999 Forwards SER Reflecting Status of Staff Review of Util License Renewal for Calvert Cliffs Nuclear Power Plants, Units 1 & 2 ML20207E9641999-03-0404 March 1999 Forwards Insp Repts 50-317/98-12 & 50-318/98-12 on 981213- 990130 & Notice of Violation Re Failure of Maint Workers to Tighten Bolting for Svc Water Heat Exchanger ML20207G8631999-02-25025 February 1999 Forwards Operator Initial Exam Repts 50-317/99-301OL & 50-318/99-301OL on 990122 & 25-29 (Administration) & 990201- 05 (Grading).All Applicants Passed All Portions of Exams ML20203D3981999-02-0505 February 1999 Forwards Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20203A6141999-02-0303 February 1999 Submits Details on Listed Areas Re Inspection Plan of Insp Scheduled for 990203 ML20202J1901999-01-28028 January 1999 Discusses License Renewal for Operating Power Reactors.Two Applications Received for Renewing Operating Licenses. Commission Established Adjudicatory Schedule Aimed at Completing License Renewal Process in 30-36 Months ML20202H7621999-01-28028 January 1999 Discusses Guidance Re License Renewal for Operating Power Reactors Developed in Response to FY99 Energy & Water Development Appropriations Act Rept 105-581 ML20199G4121999-01-20020 January 1999 Forwards SE Accepting Util USI A-46 Implementation Program for Plant ML20199L6621999-01-19019 January 1999 Informs That Licensee Authorized to Administer Initial Written Exam to Listed Applicants on 990122.NRC Region I Operator Licensing Staff Will Administer Operating Test to Applicants ML20199K8481999-01-19019 January 1999 Forwards Insp Repts 50-317/98-11 & 50-318/98-11 on 981025-1212.No Violations Noted ML20199F4101999-01-0808 January 1999 Forwards SE Accepting Util 960213,0725 & 981202 Responses to GL 95-07, Pressure Locking & Thermal Binding of Safety- Related Power-Operated Gate Valves ML20198S7491999-01-0707 January 1999 Forwards SER Accepting Licensee ,Suppl by 980424 & 1124 Ltrs Proposing Changes to Rev 49 of Calvert Cliffs Nuclear Power Plant Quality Assurance Program Description in Accordance with 10CFR50.54(a)(3) ML20198S4291999-01-0707 January 1999 Requests Addl Info Re License Renewal Application as Application Relates to Staff Position on Environ Qualification ML20196K2991999-01-0404 January 1999 Forwards Notice of Consideration of Approval of Transfer of Facility Operating License & Matl License & Opportunity for Hearing in Response to Application ML20202D0271998-12-15015 December 1998 Forwards Notice of Withdrawal of Application for Amend to License DPR-69.Proposed Change Would Have Modified Svc Water Head Tanks.Without Encl ML20198L3431998-12-12012 December 1998 Forwards Insp Repts 50-317/98-10 & 50-318/98-10 on 980706-10 & 1118.Insp Rept Documents App R Issues Which Constituted Violations of NRC Requirements.Nov Not Issued Because, Violations Identified by Licensee Staff as Part of C/A ML20198B1791998-12-10010 December 1998 Advises of Planned Insp Effort Resulting from Calvert Cliffs NPP Review Conducted on 981110.Details of Insp Rept for Next 6 Months & Historical Listing of Plant Issues Considered During Process Encl 1999-09-08
[Table view] |
Text
_- .- -
.
o
'
$
May 2, 1997 )
I
,
Mr. Charles l Vice President - Nuclear Energy I Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 -4702 SUBJECT: NRC INSPECTION REPORT NOS. 50-317/96-09 AND 50-318/96-09 AND NOTICE OF VIOLATION
Dear Mr. Cruse:
This letter refers to your December 12,1996, correspondence in response to our i November 1,1996, letter.
Thank you for informing us of the corrective and preventive actions documented in your letter. These actions will be examined during a future inspection of your licensed program.
Sincerely, Original Signed by:
Lawrence T. Doerflein, Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-317 50 318 cc:
T. Pritchett, Director, Nuclear Regulatory Matters (CCNPP)
R. McLean, Administrator, Nuclear Evaluations J. Walter, Engineering Division, Public Service Commission of Maryland cc w/ copy of Licensee's Response Letter:
K. Burger, Esquire, Maryland People's Counsel R. Ochs. Maryland Safe Energy Coalition State of Maryland (2)
9705130303 970502 PDR ADOCK 05000317 G PDR
'
l.li. lll l.ill,
.
lill lll i.lill.lll i.ll
--.................. .
- ,
0FFICIAL RECORD COPY IE:01
-
.._ . _ _ _ . . . . _ _ _ - _ _ _ . . . . _ . . _ _ _ _ . . __.. _ __ - _- _ _ _ _ . _ __
.
I
!.
- Mr. Charles h
'
Distribution w/ copy of Licensee's Response Letter:
- D. Screnci, PAO )
R. Correia, NRR D. R. Taylor, NRR j L. Cunningham, NRR j D. Barss, NRR
'
W. Dean, OEDO (WMD)
S. Stewart - Calvert Cliffs S. Bajwa, NRR l A. Dromerick, NRR j G. Vissing, NRR i L. Doerflein , DRP T. Moslak, DRP i
'
R. Junod, DRP S. Chaudhary, DRS M. Campion, RI Nuclear Safety Information Center (NSIC)
PUBLIC NRC Resident inspector j Region I Docket Room (with concurrences) '
Inspection Program Bra NRR (IPAS) i DOCDESK l DRS File l
DOCUMENT NAME: G:\ BRANCH 1\RL960909.CC To r ceive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" =
Copy with attachment / enclosure "N" = No copy i OFFICE Rl/DRP l NAME LDoerflein d 7(Q DATE 05/A/97 OFFICIAL RECORD COPY
e,
~
-
. .
. .
.
l
,
, CHAntxs II. CausE Baltimore Gas and Electric Company l Vice President Calvert Cliffs Nuclear Power Plant Nuclear Energy 1650 Calvert Cliffs Parkway Lusby. Maryland 20657 410 495-4455 l l
December 12,1996
I
.
U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk
. SUBJECT: Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Reply to Notice of Violation -- Combined NRC Region I Inspection Report Nos. 50-317(318V96-09
- REFERENCE
- (a) Letter from Mr. M. C. Modes (NRC) to Mr. C. (BGE), dated November 1,1996, Combined NRC Region I Inspection Report
,
Nos. 50-317/96-09 and 50-318/96-09 and Notice of Violation
,
In response to Reference (a), Attachment (1) details our response to a cited violation concerning an l j unauthorized modification to the auxiliary feedwater pump base guide blocks. I
1 Should you have questions regarding this matter, we will be pleased to discuss them with you.
,
- Very truly yours,
'
f /
/;Vr.' H Y ~' ^ '
CHC/DWM/bjd
/ ,j '
Attachment ,
e. l cc: D. A. Brune, Esquire H. J. Miller, NRC q
J. E. Silberg, Esquire Resident Inspector, NRC '
Director, Project Directorate I-1, NRC R.1. McLean, DNR A. W. Dromerick, NRC J. H. Walter, PSC WPDR Mal N 961212 G
ADOCK 05000317 i PDR '
l I
__
'
.
.
ATTACIIMENT (1)
REPLY TO NOTICE OF VIOLATION NOS. 50-317/96-09-01 AND 50-318/96-09-01 Notice of Violation Nos. 50-317/96-09-01 and 50-318/96-09-01 describes a non-conformance concerning an unauthorized modification to the auxiliary feedwater (AFW) pump turbine base guide blocks. The Notice of Violation states, in part, that:
On or about June 21,1996, a design change was made that was not subject to design control measures commensurate with the original design when the System Engineerfor the Auxiliary Feedwater (AFW) system implemented a " Defacto" modification (as defined in ES-1-100, RW5)
in the AFW system. The defacto modification involved not welding the guide blocks used to ensure the seismic quaHfication of the AFWpump. This design change / modification was not evaluated by the responsible design organizationfor validity and compatibility with the original design; and the maintenance personnel disregarded the configuration indicated on the approved drawing showing welded blocks on the basis ofan informalinstructionfrom a System Engineer. !
L REASON FOR THE VIOLATION
During the 1996 Unit I refueling outage, AFW Pump Turbines 11 and 12 were overhauled. To ;
facilitate the overhaul, the welded guide blocks, which provide seismic support and stabilize the l AFW pump turbines when they thermally expand during operation, were removed from the AFW pump turbine support base. In mid-June, during turbine reassembly, a question was raised as to whether the guide blocks, which are normally bolted and welded in place, needed to be I welded prior to the unit entering MODE 3. The gap between the guide block and the AFW pump l turbine housing is sufficiently small (twelve thousandths of an inch) that thermal expansion of the guide block material during welding has, in the past, resulted in the gap being out of tolerance. Based on personal observations in the field, the System Engineer believed that the guide blocks served no function in support of pump operability and, therefore, issued an informal !
memorandum stating that the guide blocks did not have to be welded prior to entering MODE 3.
The turbines were reassembled with the weld blocks bolted in place, but not welded. Unit 1 ,
initially entered MODE 3 on June 21,1996. l On August 8,1996, Maintenance and Quality Verification discussed the configuration and brought it to the attention of another System Engineer, who was under the impression that the ,
design change had been approved. Upon finding, on August 9,1996, that the design change had I not been approved, Plant Engineering personnel contacted Operations, who declared the Unit I steam driven AFW pumps inoperable and effected repairs. The guide blocks were welded as required in about six hours and the AFW pumps were returned to service. During the time that ,
this condition existed, Unit I was brought up above MODE 3, shut down, and brought back above MODE 3, resulting in approximately 17 days of operation in MODE 3 or greater with this condition before the guide blocks were welded to return the system to its design configuration.
Subsequent engineering review found that the AFW pumps are seismically qualified with the guide blocks bolted but unwelded. This condition did not, therefore, compromise plant safety.
The root cause of this event was personnel error. The System Engineer made an incorrect interpretation of the design function of the guide blocks and failed to properly process the plant configuration change through the existing engineering procedures. The System Engineer believed that the guide blocks did not need to be welded, but did not verify that this was the case.
I
. , , . . . - - . . - - . - - - - . ~ . - _ - . - _ - . _ - _ . . - - - . - - ,
.
-
- . . , --
- .
A*ITACHMENT (1)
!
l*
i REPLY TO NOTICE OF VIOLATION NOS. 50-317/96-P9-01 AND 50-318/96-09-01 ;
'
He issued informal, unreviewed guidance to the Maintenance pesonnel to this effect despite f'
reference to the guide blocks in the Technical Manual and a plant drawing showing that the i
guide blocks must be welded. As a result, through a lack of research and questioning attitude, !
. improper technical guidance was issued in a fashion contrary to established procedures. i
.
- A review of the modification process found that, had it been followed, this non-conformance j would not have resulted. The process for making design changes of this sort normally requires
!
the System Engineer to submit an Engineering Services Request or a Temporary Alteration to ,
j. Design Engineering to revise the configuration of the AFW pump turbine guide blocks. He
'
failed to recognize this as a technical manual revision, so he dNn't use the configuration change j process. In this case, this woc!d have entailed a review of the information in the Vendor j Technical Manual, which was sufficient to lead either the System Engineer or Design Engineering to the correct conclusion regarding the need for welding the guide blocks.
Maintenance personnel are expected to function as a barrier to implementation of unapproved !'
design changes. In this case, Maintenance personnel twice questioned guidance on not welding the blocks and escalated the matter to the General Supervisor-Mechanical Maintenance, who accepted the change as part of his pre-startup review. While Operations' procedures caused them to raise the question about the incomplete Maintenance Order before startup, they relied upon the report from Maintenance that the condition had Engineering approval. An independent evaluation by Operations in greater detail is not expected. ,
II. . CORRECTIVE STEPS TAKEN AND RESULTS ACHIEVED J l
%e blocks were welded on August 9.1995, approximately six hours after the condition was '
determined to be non-conforming. The thit 2 AFW pump guide blocks were verified to bc )
welded.
l The System Engineer was provided appropriate counseling to emphasize the need to obtam !
proper design review prior to making plant configuration changes. Lessons learned training has been conducted with all Plant Engineering personnel to reiterate that System Engineers cannot authorize plant configuration changes without formal approval. Additionally, guidance that contradicts the design configuration cannot be issued from Plant Engineering without formal approval from Design Engineering. While guidance that provides an interpretation or resolution of ambiguity can be made by System Engineers, they cannot contradict or waive design configuration requirements.
Awareness training was conducted within the Maintenance organization regarding this event to )
heighten awareness of craft personnel to the possibility of unapproved plant modifications being )
implemented without proper or prior approval. q
'
Design-related guidance issued by Plant Engineering to the field during the 1996 Unit 1 outage was reviewed to determine if other similar events had occurred. No similar instances where the correct engineering processes were not followed to implement configuration changes were found. !
!
!
2.
m. ~ I
_._ _ _ _ . . _
~.
i
. . . . ^
,
.
, - 3
.
ATTACHMENT (1)
REPLY TO NOTICE OF VIOLATION NOS. 50-317/96-09-01 AND 50-318/96-09-01 III. CORRECTIVE STEPS WHICH WII I BE TAKEN TO AVOID FURTHFR VIOLATIONS
Although review indicates that the present processes for design change and operability determination have not resulted in significant similar events, we believe that vulnerabilities exist in the Engineering interfaces required by these processes. We will revise the appropriate procedures to clarify when it is appropriate to justify operability of plant equipment and when a design change is needed.
IV. DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Full compliance was achieved on August 9,1996 when the guide blocks were welded in place.