U. 5. NUCLEAR REGULATORY COMMISSION
REGION I
Report No E.C. 50-304/83-05 Docket No. 50-309 License No.
DPR-36 Priority Category Licensee:
fiaine Yankee Atomic Power Company 83 Edison Drive Augusta, liaine 04336 Facility Name:
Maine Yankee Nuclear Power Station Meeting at:
NRC Region I Office, King of Prussia, Pennsylvania Meeting conducted:
April 21, 1983 EkAS NRC Personnel:
R. M. Gallo, Chief, Reactor Projects date signed Section date signed date signed Approved by:
b 6'/9 J'd
^-
t.
6. Greenman, Uniet, Projects date signed
~
.
Branch flo.1 Meeting Summary:
neeting on April 21, 1983
'
An Enforcement Conference convened at the request of NRC Region I to discuss the results of NRC Region I Inspection 50-309/83-05 with representatives of Maine Yankee Atomic Power Company.
The meeting accounted for 10 man hours of work by NRC Region I personnel.
,
Region I Form 12-1 (Rev. February 1982)
8306030316 830527 PDR.ADOCK 05000309 ()
_ _ _
_
... _ _ _
_. _ _
..
.
DETAILS 1.
Meeting Attendees Maine Yankee J. B. Randazza, Vice President, Nuclear Operations J. H. Garrity, Senior Director, Nuclearing Engineering and Licensing E. Wood, Plant Manager F. Baxter, Manager, Electrical Engineering Group, YAEC NRC J. M. Allan, Acting Regional Administrator R. W. Starostecki, Director, Division of Project and Resident Programs (DPRP)
E. G. Greenman, Chief, Projects Branch No. 1, DPRP R. M. Gallo, Chief, Reactor Projects Section lA, DPRP C. F. Holden, Project ingineer, DPRP P. Swetland, Senior Resident Inspector, Maine Yankee D. J. Holody, Enforcement Specialist J. M. Gutierrez, Regional Attorney C. J. Anderson, Chief, Plant Systems Section J. T. Wiggins, Project Engineer 2.
Meeting Purpose and Topics of Discussion The Enforcement Conference was held at NRC Region I request to discuss the violations related to the degradation of the High Pressure Safety Injection System (HPSI) which was identified in Inspection Report 50-309/83-05, dated April 19, 1983.
During this conference, Region I personnel expressed their concerns regarding
'the violations, specifically:
(1) that this situation exists for an extended period; (2) that plant personnel were unaware of plant status; and (3) what corrective and preventive actions were taken by the licensee.
The licensee indicated that the circumstances surrounding the event were as described in Inspection Report 50-309/83-05.
Immediate corrective action taken was to remove the grounding device from the High Pressure Safety Injec-tion pump A.
The licensee initiated a review of other breakers to determine if interlocts were installed that could cause similar problems during main-tenance. The licensee also informed the Architect Engineer of the recent occurrence and requested they take appropriate action.
The licensee initiated a training program to ensure personnel were aware of the interlock in question and understood the effect the grounding device has on the high pressure safety injection system. They have also initiated an in-vestigation into permanent breaker modification to eliminate recurrences of this event.
-
r
. -..
.
3.
- Results The NRC indicated that the licensee would be notified with regard to the en-forcement action which would result from'the violations.
In addition, the NRC acknowledged the licensee's open and informative dialogue which took place during the meeting.
,.
.
$
<