V. S. NUCLEAR REGULATORY COMMISSION
.C ION III Report No. 50-305/90002(DRSS)
Docket No. 50-305 License No. OPR-43 Licensee: Wisconsin Public Service Corporation Post Office Box 19002 Green Bay, WI 54305 Facility Name:
Kewaunee Nuclear Power Plant Inspection At:
Kewaunee Site, Kewaunee, Wisconsin Inspection Conducted: January 16-19, 1990 Onsite January 22-23 and 29, 1990 Region III Office
,
2//4/ft Inspector:
A T. J... M deda
~
D(te /
Phys c 1 Security Inspector J.;h iO Approvea By:
R. treed, CTief Date feguards Section Inspection _ Summary Inspection on January 16-19 and 22-23 and 29, 1990 (Report No. 50-305/90002(DRSS))
, Areas Inspected:
Routine, unannounced physical security ir.spection involving Management Support Security Program Plans, and Audits; Protected and Vital Area Physical barriers, Detection and Assessment Aids; Protected and Vital Area Access Control of Personnel, Packages and Vehicles; Alarm Stations and i
Communications; Power Supply; Testing, Maintenance and Compensatory Measures; l
and Security Training / Qualification.
Reviewed licensee actions on previous
'
inspection findings, and Land Vehicle Bomb Contingency Procedure Verification (SIMS-MPA L9-07).
A review of allegations relating to compensatory measures,
staffing, records and compliance with procedures was completed.
'
Results: The licensee was found to be in compliance with NRC requirements, except as noted below:
Access Control-Vehicles:
Failure to conduct an adequate search of a vehicle, j
Three of six previous inspection. findings were reviewed and closed. The remaining previous inspection findings pertaining to one violatior, and two open items remain open.
In each case regarding the open items licensee action l
was not completed.
Contingency planning for the land vehicle bomb threat was y
reviewed and the required planning had been completed.
Attachment Contains l
SAF1 GUARDS INFORMATI03 l
Upon Separation Thic l 9003120266g,$$$,og,
$
O A
~ ~ni f a nn
+ir nn i n n r n w Page Is Decontrolled PDR ADOCK ppc wt
. u u n \\l/ 0 iVi V aU.u n l lvi O
.
>
.
,
,
D A '* " A t t A D TO 41
- A n P A e v e n u
.
,
wn uunnsu ai vimitt l iv T-
,
,
,
i No violations with regulatory requirements were identified as a result of the
!
allegation review. General management of the licensee and contract security
organization and use of available resources were effective.
!
(Details )
t
,
!
!
,
i i
!
l
Attachment Contains *
Upon Separation This r
Tage Is Decontrolled
>
[
QA 7plg3wn trnma'
-^t
'
> u sn' \\ >0