IR 05000305/1980025

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-305/80-25 on 801117-21.Noncompliance Noted: Packages Not Searched Prior to Entering Protected Area. Details Withheld (Ref 10CFR2.790)
ML19343B487
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 12/10/1980
From: Creed J, Hind J, Kniceley J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19343B486 List:
References
50-305-80-25, NUDOCS 8012240061
Download: ML19343B487 (2)


Text

~.

-

_ - -

+

.

.

'

'

i..

.. -.

O

" '

""

.,

U.S. NUCLEAR REGULATORY CO.T11SSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-305/80-25 l

Docket No. 50-305 License No. DPR-43 Safeguards Group IV Licensee: Wisconsin Public Service Corporation Post Office Box 1200 Green Bay, WI 54305 Facility Name: Kewaunee Nuclear Power Plant Inspection At: Kewaunee Site, Kewaunee, Wisconsin Inspection Conducted: November 17-21, 1980 Date of Last Physical Security Inspection: June 23-27, 1980 Type of Inspection: Routine Unannounced Physical Protection 0,!SO Inspectors:

-.

/)

(F.'R. Creed Date Physical Security Specialist hJ.R.Kniceley Y.

-

F Date'

~

L I1/uolTo

.

Physical Security Specialist

/

d d

Approved By:

'

,

y A. Hind, Chief Date Safeguards Branch Incpection Summary i

l Inspection on November 17-21, 1980 (Report No. 50-305/80-25)

Areas Inspected:

Included a review of the Security Plan; Security Program

'

Audit; Security Organization; Protected Area Fhysical Barriers; Vital Area Physical Barriers; Lighting; Access Control (Identification, Authorization and Badging); Access Control (Search); Access Control (Escorting); Alarm Stations; Detection Aids; Assessment Aids; Communications; Testing and Maintenance; Compensatory Measures; Power Supply; Records and Reports; Licensee Action on Previous Inspection Findings; Followup on Unresolved

,

Items; Independent Inspection Effort. The inspection involved 88 inspector i

hours onsite by two NRC inspectors. The inspection began during the day shift.; 26 inspection hours were accomplished during offshift periods.

8012240dali liiinati con 10 cn us w wnnmice

.

.

.. -

.-. -. -. -.

.

- - _, -

,_ -,

-

.-

--

e

'

Ai 4.'.',, i. * P,

-

10 DR 2.L :

..,.. ;(,

,

<;> a. r a f.

Results: The licensee was found to be in compliance with NRC requirements within the seventeen areas examined during the inspection except for the following one item:

Access Control (Searching) - Some packages were not searched prior to entering the protected area.

(Details Part 2.790(d) Information)

ATTACilMii.i 0%ia'u-2 10 CFR 2.DJ (:!) INTCi.Ei:?: