U.S. NUCLEAR REGULATORY COFSiISSION OFFICE OF INSPECTION AND ENFORCD1ENT

REGION III

Report No. 30-305/79-03 Docket No. 50-305 License No. DPR-43 Licensee:

Wisconsin Public Service Corporation P. O. Box 1200 Green Bay, WI 54305 Facility Name:

Kewaunee Nuclear Power Plant Inspection At:

Kewaunee Site, Kewaunee, Wisconsin Wisconsin P;blic Service Corporation, Green Bay, Wisconsin Inspect Jonducted: March 22-23 and April 23-24, 1979 f, ha YY gcrukaJA-

_

f/7!7[

Inspector:

K. D. Ward

'

//77 Approved Sy; H. Danielson, Chief d

u.

Engineering Support Section 1

'

Inspection Suc=ary Inspection on March 22-23 and April 23-24, 1979 (Report No. 50-305/79-03)

Areas Inspected:

Spent fuel rack QA/QC programs, implementing welding and nondestructive examination (NDE) procedures and record review.

This inspection involved a total of 20 inspector-hours onsite by one NRC inspector.

Results:

No items of noncompliance or deviations were identified.

2hb O

r 7907050ll7 ?

@

.

DETAILS Persons Contacted Wisconsin Public Service Corporation (WPS)

  • C.

Luoma, Superintendent Kewaunee Plant

  • R.

Lange, Assistant Superintendent - Maintenance

  • A. Ruege, Plant Performance Engineer
  • V.

LeGreve, QA Lead Auditor

  • D. Restan, Nuclear Technical Review Supervisor
  • M. March, Nuclear Systems Engineer
  • K. Weinhauer, Nuclear Service Engineer G. Spiering, QA Supervisor R. Maigatter, QC Records Technical D.

Berg, QA Technician The inspector also contacted and interviewed other licensee and contractor employees.

  • De..ates those present at the exit interview.

Fuactional or Program Areas Inspected 1.

Spent Fuel Pool Modification a.

A transmittal letter was sent to Mr. Victor Stello, Director, Washington D.C.,

requesting to modify the spent fuel storage facilities.

The letter stated that a modification is neces-sary to continue operations beyond mid-1980 due to the limited space remaining within the existing spent fuel storage rack, the absence of available storage at remote existing locations at a reasonable cost, and the refueling schedule for 1978 and 1979. The title of the submi;tal letter was, " Spent Fuel Pool Modification, Description aid S-#aty Analysis, Environmental Impact Evaluation," dated ?.ove.er 14, 1977.

On March 6, 1979, A. Schewencer, Chief Operating Reactors Branch No. 1, Division of Operating Reactors, authorized an increase in the storage capacity of the spent fuel pools.

b.

Leckenby Company, Seattle, Washington, fabricated three high density spent fuel racks for the North Pool and four for the South Pool, all in accordance with ASME Section IX, 1977 Edition with Summer 1977 Addenda.

.

-2-286 005

.

.

Three of the racks are installed in the North Pool and the other four will be onsite and ready for installation approxi-mately August, 1979.

In approximately 1985, there will be a bid go out for the fabtication of four more spent fuel racks for the South Pool.

c.

The replacement of the spent fuel racks appears to satisfy the requirement of the Code, Purchase Order No. 77762, dated May 11, 1978, Leckenby QA Program No.78-081 dated Feburary 10, 1978, WPS Operational Quality Assurance Program, Rev. 2, dated January 20, 1979, ar.d procedures.

d.

The inspector determined that applicable welding procedures and material were used and the appearance of the weld surface was acceptable.

The following Leckenby documents were reviewed:

(1) Precedure Qualification Records PQR-03-024, Rev. 1 PQR-06-025, Rev. 1 PQR-02-027, Rev. 1 PQR-01-043, Rev. 1 (2) Welding Procedure Specification WPS-P08-02 (Repair), Rev. 1 WPS-001-A, Rev. 1 WPS-007-A, Rev. O WPS-008-A, Rev. O WPS-009-A, Rev. O WPS-010-A, Rev. O WPS-013-A, Rev. O WPS-01-22, Rev. 0 WPS-P-08-01.01 (Repair), Rev. 0 (3) Welding Perf >r. nance Qualification WPQ-03-007, Rev. 2 WPQ-06-005, Rev. 2 WPQ-06-006, Rev. 2 WPQ-02-008, Rev. 2 WPQ-02-009, Re". 2 WPQ-01-021, Rev. O WPQ-01-023, Rev. 0 WPQ-01-024, Rev. 0-3-9O/

(10, 'Jd LUU vs

.

t e.

The inspector reviewed Leckenby material test and receiving reports No. 13267, No. 13245 and No. 13244; also the following welder qualification records of Leckenby personnel.

Name No.

T. Hoselton W33 C. Nelson W21 C.

Saerbon W36 M. Mcdonald W47 J. Cisneros W11 B. Heath W37 P. Houlihan W48 0'Neill W49 K. Ellingson Tacker V. Martin W4 G. Fincher Tacker A. Guiberson Tacker K. Fender Tacker F. Guidry Tacker L. Gingrich Tacker f.

The inspector reviewed liquid penetrant reports of the fuel box assembly and of the crane h60k, also the following procedures by Lackenby NDE personnel certifications.

WPS Procedures

- Liquid Penetrant Inspection cf Welds No. GMP-107-7, September 14, 1974.

- Qualification of Certification of Nondestructive Testing Personnel No. 13.4, Rev. O, January 8, 1979.

Leckenby Procedures

- Liquid Penetrant Procedure No. QCP.9.3, Rev. 1.Section V, 74, W76, August 25, 1979.

- Qualification and Certification Procedure for Nondestructive Test Personnel No. QCP.9.4, Rev. 1, July 25, 1978.

NDE Personnel Certifications Name Level Method E. Hcmilton III PT-MT-UT L. Noland II VT-PT C. Parker II VT-PT-4-

") O

qQ7 6UU Uo/

.

t R. Johnson II VT-MT-PT-UT D. Almos II VT-PT G.

Briest II VT-PT G. Eggers II VT g.

The inspector reviewed several audits that were performed at Leckenby by a WPS representative and an audit performed onsite No. 79-17, titled " Receipt Inspection and Testing and Installation of High Density Feed Storage Racks."

h.

The following was used as a check list for receipt inspection of the three spent racks.

The inspector verified that all items had been performed.

(1) Mandrel Test (?) Plumbness of Rack and Cells (3) Top Grip. Dimensions (4)

Bottom Grid Hole Location Dimensions (5)

Bumper Screw Hole Alignment

,

(6) Hold Down Bolt Thread Engagement (7) Dimension Sheet of Support Frames 1.

The inspector verified that the items below were performed during installation and the following procedures were reviewed.

(I)

Blackness Test (2) Tie Down Bolt Thread Engagement (3) Verification of Rack Vertical Alignment (4) Leveling Leg Torquing (5) Seismic Restraint Setting (6) Rack Tie Down Bolt Torquing (7) Rack Drag Testing-5-c86 ()DS

.

.

Procedures (8) High Density Spent Fuel Rack Project, Fuel Rack Removal and Pool Preparation Procedure "A" F" ' Pool, (Bolting Installation)

(9) High Density Spent Fuel Rack Project, Fuel Rack Removal and Pool Preparation Procedure "B" Fuel Pool.

(10) High Density Spent Fuel Rack Project Installation Procedure Pool "A".

(11) High Denisty Spent Fuel Rack Froject Neutron Absorption Verification, lbrch 19, 1979.

(12) Inspection and Test Procedure fcus Tubes P-1, Rev. 3, December 4, 1978 (Poison Plates Installation)

(13) Final Inspection and Test Procedure for Rack P-2, Rev. 2, October 5, 1978.

(Mandrel Test Record)

(14) Support Frame Set-up P-3, Rev. 3, September 28, 1978.

(Dimension Check of Support Frames)

(15) Handling, Packaging and Shipping Procedure for Nuclear Storage Modules and Cc,ponents P-4, Rev. 1, December 23, 1976.

(16) Acid Cleaning Procedure for Heat Treated Components P-5, Rev. O, October 5, 1978.

(17) Tube Handling Procedure P-6, Rev.

1, November 30, 1979.

No items of noncompliance or deviations were identified.

Exit Interview The inspectors met with site representatives at the conclusion of the inspection.

The inspector summarized the scope and findings of the inspection noted in this report.

-6-OI'

l f t ',)

L J L, fue