Text
~
T q
.L )
U.S. NUCLEAR REGULATORY COMMISSION
-
OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-304/80-20
.
Docket No. 50-304 License No. DPR-48 Safeguards Group IV Licensee:
Commonwealth Edison Company
.
Post Office Box 767 Chicago, IL 60690 Facility Name: Zion Nuclear Power Station, Unit 2
?nspection At: Zion Site, Zion, IL Inspection Conducted: August 20-22, 1980 Date of Last Material Control and Accounting Inspection: March 29-31 and April 12-14, 1978 Type of Inspection: Unannounced Material Control and Accounting Inspectors:
[k8Y,,&& <f 9/9// 6 A. G. Finley f'
Auditor Date
.
.O f f f']
JgP.Patterson Chemist D4te
'
-
o
.[/r
'
Approved By:
' A. Hin, Chief
_
Safeguards Branch Inspection Summary
.
Areas Inspected:
Facility Organization and Operation, Measurements and Inventcry Control, Shipping and Receiving, Internal Controls, Records and Reports, and Management of Material Control System.
The inspection involved 42 inspection-hours onsite by two NRC inspectors and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements in the seven areas examined during the inspection.
(Details 2.790(d) Information)
.
r-F3. N - N Ccp -
_
of copleg
/3 F:se
,
l Mis
- 2EIT NOT TO BE l
8010010/73
2'Cc3 'nuot 1 q rzc l
A PRO *//.L OF RIII L_
a