IE Insp Rept 50-304/80-20 on 800820-22.No Noncompliance Noted.Major Areas Inspected:Facility Organization & Operation; Measurements & Inventory Control.Details Withheld (Ref 10CFR2.790)
ML19337B008
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 09/09/1980
From: Finley A, Hind J, Patterson J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19337B000 List:
References
50-304-80-20, NUDOCS 8010010193
Download: ML19337B008 (1)


Text

~

T q

.L )

U.S. NUCLEAR REGULATORY COMMISSION

-

OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-304/80-20

.

Docket No. 50-304 License No. DPR-48 Safeguards Group IV Licensee:

Commonwealth Edison Company

.

Post Office Box 767 Chicago, IL 60690 Facility Name: Zion Nuclear Power Station, Unit 2

?nspection At: Zion Site, Zion, IL Inspection Conducted: August 20-22, 1980 Date of Last Material Control and Accounting Inspection: March 29-31 and April 12-14, 1978 Type of Inspection: Unannounced Material Control and Accounting Inspectors:

[k8Y,,&& <f 9/9// 6 A. G. Finley f'

Auditor Date

.

.O f f f']

JgP.Patterson Chemist D4te

'

-

o

.[/r

'

Approved By:

' A. Hin, Chief

_

Safeguards Branch Inspection Summary

.

Areas Inspected:

Facility Organization and Operation, Measurements and Inventcry Control, Shipping and Receiving, Internal Controls, Records and Reports, and Management of Material Control System.

The inspection involved 42 inspection-hours onsite by two NRC inspectors and was begun during the regular hours.

Results: The licensee was found to be in compliance with NRC requirements in the seven areas examined during the inspection.