IR 05000287/1973005

From kanterella
Jump to navigation Jump to search
Insp Rept 50-287/73-05 on 730816.Corporate Mgt Meeting W/Licensee Discussing Regulatory Operations Organization & Insp Objectives & Methods Re Startup Testing Programs
ML19317F422
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 08/24/1973
From: Jape F, Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19317F417 List:
References
50-287-73-05, 50-287-73-5, NUDOCS 8001140667
Download: ML19317F422 (3)


Text

{{#Wiki_filter:" . % ,. O f. #'" %g UNITED STATES

(p# g ATOMIC ENERGY COMMISSION l ,, e DIRECTORATE OF P2GUIATORY OPEPATIONS l - ' , .[ REGION H SusT E 818 - ' / p 230 9E AC MT R EE ST R E ET. NORT MwES' 8iArgs o' AT L. A NT A. G E ORG e A 30303 ,,,,g , g,,, g,,3 . RO Inspection Report No. 50-287/73-5 Licensee: Duke Power Company . Power Building 422 South Church Street Charlotte, North Carolina 28201 Facility: Oconee Unit 3 Docket No. : 50-287 License No.: CPPR-35 Category: A3/B1 Location: Seneca, South Carolina Type of License: B&W, PWR, 2568 N (t) Type of Inspection: Special, Announced Dates of Inspection: August 16, 1973 Dates of Previous Inspection: July 24-27,1973 Principal Inspector: F. Jape, Reactor Inspector Facilities Test and Startup Branch Accompanying Inspector: C. E. Murphy, Chief Facilities Test and Startup Branch ~ . Other Accompanying Personnel: None Principal Inspector: 4(m /h/ O /2.GL_, D~ F. Jape, Reactor Inspedtor/ Date Facilities T st and Startup Branch Reviewed B : u -.e ( M / / z ne E-2d -73 _ ' . E. Murphy, Chief Date Facilities Test and Startup Branch

. 8001140[[7 l

. . - ~ ~ f . - .. RO Rpt. No. 50-287/73-5-2-SUMMARY OF FINDINGS . The second corporate level management meeting for oconee 3 was held with DPC personnel at their corporate offices in Charlotte, North Carolina, on August 16, 1973.

Regulatory Operations organization and inspection objectives and methods related to preoperational and initial startop testing programs were discussed with the licensee.

. % %

- _..

_- - .. , % .-. - . . ,. . RO Rpt. No. 50-287/73-5 I-l DETAILS I Prepared By: 40% fdA h-2.f -2 3 F. Jape L/ / Date Reactor Inspector Facilities Test and Startup Branch Date ol Inspection: August 16, 1973 Revd.ewed By: ml/[ / W[2V/73 M. E. Murphy, Chief ' Date' ( Facilities Test and Startup Branch 1.

Persons Contacted

Duke PoJer Comoany (DPC) E. D. Powell - Assistant Vice President, Steam Production J. E. Smith - Plant Superintendent W. O. Parker - Assistant Manager, Steam Production - K. S. Canady - Nuclear Engineer 2.

Summary of Items Discussed The meeting was opened by C. E. Murphy, Chief, Facilities Test and Startup Branch, Region II, with an explanation of the purpose of the - meeting. He explained the organization of Regulatory Operations and Region II.

Murphy discussed the major phases of the Facilities Test and Startup Branch (FT&SB) inspection efforts and the manner in which inspections are conducted.

Jape further discussed FI&SB inspection efforts and informed the licensee representatives of what Regulatory Operations inspectors use for guidance in reviewing tests and operating.

procedures and the Operational QA Plan.

Jape stated that Regulatory Guide 1.33, i' Quality Assurance Program Requirements (Operation)," will be used as general guidance' when - _, _. ... determining the adequacy of the licensee's QA program.

The' license '

was also informed that ANSI 18.7, 1972, " Standard for Administrative Controls for, Nuclear Power Plants," and ANSI N45.2, " Quality Assurance Program Requirements for Nuclear Power Plants," are generally acceptable and provide an adequate basis for fulfilling th e require =ents of Accendi:: B to 10 CFR 50.

l _ _ _ -_ }}