MONTHYEARIR 07200051/20244022024-11-20020 November 2024 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200051/2024402 (Public) IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 IR 05000003/20240052024-05-21021 May 2024 And 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) IR 05000003/20230042024-02-22022 February 2024 NRC Inspection Report Nos. 05000003/2023004, 05000247/2023004, 05000286/2023004, and 07200051/2023004 and Notice of Violation IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 IR 05000003/20230012023-05-22022 May 2023 Unions 1, 2 and 3 - NRC Inspection Report Nos. 05000003/2023001, 05000247/2023001, 05000286/2023001, and 07200051/2023001 IR 05000003/20234012023-05-10010 May 2023 NRC Security Decommissioning Inspection Report Nos. 05000003/2023401, 05000247/2023401, and 05000286/2023401 IR 05000003/20220042023-03-13013 March 2023 NRC Inspection Report Nos. 05000003/2022004, 05000247/2022004, 05000286/2022004, and 07200051/2022002 IR 05000003/20220022022-11-17017 November 2022 NRC Inspection Report Nos. 05000003/2022002, 05000003/2022003, 05000247/2022002, 05000247/2022003, 05000286/2022002, 05000286/2022003, and 07200051/2022001 IR 05000003/20224022022-10-18018 October 2022 NRC Security Decommissioning Inspection Report 05000003/2022402, 05000247/2022402, and 05000286/2022402 IR 05000003/20220012022-05-25025 May 2022 NRC Inspection Report Nos. 05000003/2022001, 05000247/2022001, and 05000286/2022001 IR 05000003/20224012022-05-25025 May 2022 NRC Security Decommissioning Inspection Report Nos. 05000003/2022401, 05000247/2022401, and 05000286/2022401 IR 05000003/20210042022-03-0404 March 2022 NRC Inspection Report Nos. 05000003/2021004, 05000247/2021004, 05000286/2021004, and 07200051/2021001 IR 05000003/20210032021-11-0909 November 2021 NRC Inspection Report Nos. 05000003/2021003, 05000247/2021003, and 05000286/2021003 IR 05000003/20210022021-08-0404 August 2021 NRC Inspection Report Nos. 05000003/2021002, 05000247/2021002, and 05000286/2021002 IR 05000286/20210022021-06-0707 June 2021 Integrated Inspection Report 05000286/2021002 IR 05000286/20214022021-05-0505 May 2021 Security Baseline Inspection Report 05000286/2021402 IR 05000003/20210012021-04-21021 April 2021 Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Station Units 1 and 2 - NRC Inspection Report No. 05000003/2021001 and 05000247/2020001 IR 05000286/20210012021-04-15015 April 2021 Integrated Inspection Report 05000286/2021001 IR 05000286/20200062021-03-0303 March 2021 Annual Assessment Letter for Indian Point Energy Center, Unit 3 (Report 05000286/2020006) IR 05000247/20200142021-02-0101 February 2021 Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Station Unit 2 NRC Inspection Report No. 05000247/2020014 IR 05000286/20200042021-01-28028 January 2021 Integrated Inspection Report 05000286/2020004 IR 05000003/20200012020-12-0808 December 2020 Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Station Units 1 and 2, NRC Inspection Report No. 05000003/2020001 and 05000247/2020013 IR 05000286/20200032020-10-28028 October 2020 Integrated Inspection Report 05000286/2020003 IR 05000286/20200102020-09-16016 September 2020 Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000286/2020010 IR 05000286/20200052020-08-31031 August 2020 Updated Inspection Plan for Indian Point Energy Center, Unit 3 (Inspection Report 05000286/2020005) IR 05000247/20200022020-08-10010 August 2020 Integrated Inspection Report 05000247/2020002 and 05000286/2020002 IR 05000286/20200122020-07-27027 July 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000286/2020012 IR 05000247/20020102020-05-12012 May 2020 Final ASP Analysis - Indian Point 2 (IR 050002472002010) IR 05000247/20200012020-04-29029 April 2020 Integrated Inspection Report 05000247/2020001 and 05000286/2020001 IR 05000247/20190062020-03-0303 March 2020 Annual Assessment Letter for Indian Point Energy Center, Units 2 and 3 (Report 05000247/2019006 and 05000286/2019006) IR 05000247/20190042020-02-10010 February 2020 Integrated Inspection Report 05000247/2019004 and 05000286/2019004 IR 05000003/20190012020-01-16016 January 2020 Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Station Unit 1 - NRC Inspection Report No. 05000003/2019001 IR 05000247/20190122020-01-0909 January 2020 Temporary Instruction 2515/194 Inspection Report 05000247/2019012 and 05000286/2019012 IR 05000247/20194112020-01-0909 January 2020 Material Control and Accounting Program Inspection Report 05000247/2019411 and 05000286/2019411 (Cover Letter Only) IR 05000247/20194032019-11-0505 November 2019 Cyber Security Inspection Report 05000247/2019403 and 05000286/2019403 (Cover Letter Only) IR 05000247/20190032019-11-0404 November 2019 Integrated Inspection Report 05000247/2019003 and 05000286/2019003 IR 05000247/20194102019-10-0202 October 2019 Security Inspection Report 05000247/2019410 and 05000286/2019410 (Cover Letter Only) IR 05000247/20190102019-09-26026 September 2019 Biennial Problem Identification and Resolution Inspection Report 05000247/2019010 and 05000286/2019010 IR 05000247/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Report 05000247/2019005 and 05000286/2019005) IR 05000247/20190022019-08-13013 August 2019 Integrated Inspection Report 05000247/2019002 and 05000286/2019002 IR 05000247/20190112019-07-0909 July 2019 Design Basis Assurance Inspection (Programs) Inspection Report 05000247/2019011 and 05000286/2019011 IR 05000247/20190012019-05-13013 May 2019 Integrated Inspection Report 05000247/2019001 and 05000286/2019001 ML19130A0422019-05-0808 May 2019 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000247/2019403 and 05000286/2019403 IR 05000247/20193012019-04-18018 April 2019 Initial Operator Licensing Examination Report 05000247/2019301 IR 05000247/20180062019-03-0404 March 2019 Annual Assessment Letter for Indian Point Energy Center, Units 2 and 3 (Reports 05000247/2018006 and 05000286/2018006) IR 05000247/20180042019-02-0707 February 2019 Integrated Inspection Report 05000247/2018004 and 05000286/2018004 IR 05000247/20180102019-01-15015 January 2019 Design Bases Assurance Inspection (Teams) Report 05000247/2018010 and 05000286/2018010 2024-08-06
[Table view] |
Text
ary 24, 2002
SUBJECT:
INDIAN POINT UNIT 3 - NRC INSPECTION REPORT NO. 50-286/01-011
Dear Mr. Barrett:
On December 13, 2001, the NRC completed a team inspection at your Indian Point Unit 3 Nuclear Power Station. The enclosed report documents the results of that inspection which were discussed with you, and other members of your staff, on December 13, 2001.
This inspection was an examination of activities conducted under your license as related to safety and compliance with the Commissions rules and regulations and with the conditions of your license. Within these areas, the inspection consisted of a selected examination of procedures and representative records, observation of activities, and interviews with personnel.
Based on the results of this inspection, the team identified two findings that were determined to be of very low safety significance (Green). Both issues were determined to involve violations of NRC requirements. However, because of their very low safety significance and because they have been entered in your corrective action program, the NRC is treating these issues as non-cited violations in accordance with Section VI.A.1 of the NRCs Enforcement Policy. If you deny the non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.:
Document Control Desk, Washington, D.C. 20555-0001, with copies to the Regional Administrator, Region I, the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-0001, and the NRC Resident Inspector at the Indian Point Unit 3 Nuclear Power Station.
R. In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/ADAMS.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Lawrence T. Doerflein, Chief Systems Branch Division of Reactor Safety Docket No. 50-286 License No. DPR-64 Enclosure: Indian Point Unit 3 - NRC Inspection Report 50-286/01-011 Attachments: Supplemental Information