Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2019006 and 05000278/2019006)
ML20059K969
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/03/2020
From: Dan Collins
Division Reactor Projects I
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Greives J
References
IR 2019006
Download: ML20059K969 (6)


Text

March 3, 2020

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2019006 AND 05000278/2019006)

Dear Mr. Hanson:

The NRC has completed its end-of-cycle performance assessment of Peach Bottom Atomic Power Station, Units 2 and 3, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2019 through December 31, 2019. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Peach Bottom Atomic Power Station, Units 2 and 3 during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Peach Bottom Atomic Power Station, Units 2 and 3. Note that Peach Bottom Atomic Power Station, Units 2 and 3, returned to the Licensee Response Column on June 27, 2019 following a supplemental inspection documented in NRC Inspection Report 05000277/2019040 and 05000278/2019040 (ML19178A008).

The enclosed inspection plan lists the inspections scheduled through December 31, 2021. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections) and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule. Furthermore, all the inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In addition to baseline inspections, the NRC will also conduct Inspection Procedure (IP) 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations, in April 2020; IP 60854.1, Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants, in March through May 2020; IP 60855.1, Operation of an ISFSI at Operating Plant, in June 2020; and Temporary Instruction (TI) 2515/193, Hardened Containment Vent, in May 2020. Lastly, during this period the NRC will perform inspections per TI 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01).

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact Jonathan Greives at (610) 337-5337 with any questions you have regarding this letter.

Sincerely, X /RA/

Signed by: Daniel S. Collins Daniel S. Collins, Director Division of Reactor Projects Docket Nos. 50-277 and 50-278 License Nos. DPR-44 and DPR-56 Enclosure:

Inspection/Activity Plan cc w/ encl: Distribution via LISTSERV

ML20059K969 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME LCasey JGreives DCollins DATE 3/2/20 3/2/20 3/3/20

IP 22 Inspection Activity Plan Report Peach Bottom 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count Access Authorization and Fitness for Duty-PB 3 2, 3 02/03/2020 02/06/2020 IP 71151 001338 Performance Indicator Verification ISFSI Dry Run & Operational Inspection - PB 2 2, 3 03/16/2020 03/20/2020 IP 60854.1 000589 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 2, 3 03/30/2020 04/03/2020 IP 60854.1 000589 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 2, 3 04/20/2020 04/24/2020 IP 60854.1 000589 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 2, 3 05/11/2020 05/15/2020 IP 60854.1 000589 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 2, 3 06/01/2020 06/05/2020 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants TI-194 Open Phase Condition Inspection-PB 2 2, 3 04/13/2020 04/17/2020 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)

FY20 PEACH BOTTOM Initial Exam 3 2, 3 04/19/2020 04/25/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2, 3 05/24/2020 06/06/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

EP EXERCISE INSPECTION - PEACH BOTTOM 5 2, 3 04/20/2020 04/24/2020 IP 71114.01 000716 Exercise Evaluation 2, 3 04/20/2020 04/24/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2, 3 04/20/2020 04/24/2020 IP 71151 001397 Performance Indicator Verification ISFSI- Security Inspection-PB 2 2, 3 04/20/2020 04/24/2020 IP 71130.09 001656 Security Plan Changes 2, 3 04/20/2020 04/24/2020 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations Resp Protection & Dose Assessment (71124.03/71124.04) 1 2, 3 04/27/2020 05/01/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 04/27/2020 05/01/2020 IP 71124.04 000728 Occupational Dose Assessment This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

3/2/2020 9:48:08 AM Enclosure

IP 22 Inspection Activity Plan Report Peach Bottom 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count TI-193 Hardened Containment Vent 2 2, 3 05/04/2020 05/08/2020 TI 2515/193 000511 Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation under Severe Accident Conditions Rad Monitoring Instrumentation (71124.05) 1 2, 3 06/08/2020 06/12/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation Design Basis Assurance Inspection - Teams - Peach Bottom Units 2 and 3 6 2, 3 07/13/2020 07/19/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

2, 3 07/27/2020 08/02/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - PB 6 2, 3 07/27/2020 07/31/2020 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 2, 3 08/17/2020 08/21/2020 IP 71130.03 000735 Contingency Response - Force-On-Force Testing REMP (71124.07) 1 2, 3 09/21/2020 09/25/2020 IP 71124.07 000731 Radiological Environmental Monitoring Program ISI - UNIT 2 1 2 10/26/2020 10/30/2020 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

Rad Hazards (71124.01) & PIs (71151) 1 2, 3 10/26/2020 10/30/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 10/26/2020 10/30/2020 IP 71151 000746 Performance Indicator Verification EP Program Inspection - Peach Bottom 1 2, 3 02/08/2021 02/12/2021 IP 71114.02 000717 Alert and Notification System Testing 2, 3 02/08/2021 02/12/2021 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2, 3 02/08/2021 02/12/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2, 3 02/08/2021 02/12/2021 IP 71114.05 000720 Maintenance of Emergency Preparedness 2, 3 02/08/2021 02/12/2021 IP 71151 001397 Performance Indicator Verification Access Control, Equipment Testing and Maintenance, Training, SPR 3 2, 3 04/05/2021 04/09/2021 IP 71130.09 001656 Security Plan Changes 2, 3 04/05/2021 04/09/2021 IP 71151 001338 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

3/2/2020 9:48:08 AM

IP 22 Inspection Activity Plan Report Peach Bottom 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count FY2021 Peach Bottom Initial Examination 5 2, 3 05/02/2021 05/08/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2, 3 05/30/2021 06/05/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

INSERVICE INSPECTION - UNIT 3 1 3 10/24/2021 10/30/2021 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

Rad Hazards (71124.01) and PIs (71151) 1 2, 3 10/25/2021 10/29/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 10/25/2021 10/29/2021 IP 71151 000746 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.