MONTHYEARML23219A1432023-07-19019 July 2023 2023 BFN - CGD Inspection Information Request IR 05000259/20114032011-09-14014 September 2011 IR 05000259-11-403, 05000260-11-403, 05000296-11-403, on 08/18/2011, Brown Ferry Nuclear Plant, NRC Security Inspection Report ML1109603322011-04-0606 April 2011 NRC Response to TVA Concerning Disputed NOV in NRC Inspection Report 2010005 ML1016900812010-06-17017 June 2010 Reply to Tennessee Valley Authority Letter Dated 05/18/2010, Regarding Inspection Report No. 05000259-10-007, 05000260-10-007 and 05000296-10-007, Browns Ferry Nuclear Plant ML1010905032010-04-19019 April 2010 IR 05000259-10-007, 05000260-10-007 & 05000296-01-007 for Browns Ferry, Final Significance Determination of Yellow & White Findings & Notice of Violation IR 05000259/20084012008-10-16016 October 2008 IR 05000259-08-401, IR 05000260-08-401, and IR 05000296-08-401, on 07/28/2008 Through 07/31/2008, and 10/02/2008, Browns Ferry Nuclear Plant, NRC Inspection IR 05000253/20072012007-11-0606 November 2007 Security Inspection 05000253-07-201, 05000260-07-201 and 05000296-07-201 on 09/27/2007 for Browns Ferry Nuclear Plant IR 05000259/20074022007-04-0505 April 2007 NRC Physical Security Baseline IR 05000259-07-402, 05000260-07-402 and 05000296-07-402 IR 05000259/20060102006-09-29029 September 2006 NRC Security Inspection Report 05000259/2006010, 05000260/2006010 and 05000296/2006010 IR 05000259/20060072006-08-10010 August 2006 IR 05000259-06-007, on 04/16/2006 - 07/15/2006, Browns Ferry, Unit 1; Integrated Inspection Included Aspects of Licensee Engineering and Modification Activities Associated with Unit 1 Recovery Project IR 05000260/20060152006-07-25025 July 2006 Notification of Browns Ferry Nuclear Plant Component Design Bases Inspection - NRC Inspection Report Nos. 05000260/2006015, & 05000296/2006015 IR 05000260/20030122004-01-16016 January 2004 IR 05000260-03-012 & 05000296-03-012 Completed on 09/09/2003 for Browns Ferry, Physical Security Baseline Inspection Report IR 05000260/20030052003-12-19019 December 2003 Input to Browns Ferry Integrated IR 05000260-03-005 ML18283B5211977-09-21021 September 1977 Response to Inspection Conducted on 08/16-19/1977 & Reported in Inspection Report Nos. 05000259/1977015, 05000260/1977015, & 05000296/1977015 ML18283B5231977-08-22022 August 1977 Response to Inspection Conducted on 07/18-19/1977 & Reported in Inspection Report Nos. 05000259/1977012, 05000260/1977012, & 05000296/1977012 2023-07-19
[Table view] Category:Letter
MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] |
Text
ber 29, 2006
SUBJECT:
BROWNS FERRY NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000259/2006010, 05000260/2006010 AND 05000296/2006010
Dear Mr. Singer:
On September 1, 2006, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Browns Ferry Nuclear Plant. Portions of the Access Authorization and Fitness For Duty inspection procedures were completed at the Tennessee Valley authority (TVA) Corporate Office on June 23, 2006. The enclosed inspection report documents the inspection results, which were discussed with Mr. R Goodrich at the corporate office on June 23, 2006, and with Mr. B. Aukland, and other members of your staff at the site on September 1, 2006. A final telephone exit was conducted on September 28, 2006, with Mr. J. Wallace and other members of your staff.
This inspection examined activities conducted under your licenses as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390 a copy of this letters enclosure will not be available for public inspection.
DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED
TVA 2 DOCUMENT CONTAINS In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
Sincerely,
/RA: James Shehee for/
Brian R. Bonser, Chief Plant Support Branch Division of Reactor Safety Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68 Enclosure: NRC Inspection Report No. 05000259/2006010, 05000260/2006010 and 05000296/2006010 w/Attachment: Supplemental Information (Safeguards Information)
cc w/encl:
Ashok S. Bhatnagar Senior Vice President Nuclear Operations Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Preston D. Swafford Senior Vice President Nuclear Support Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402 cc w/o encl: (See page 3)
DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED
TVA 3 DOCUMENT CONTAINS (cc w/o encl)
Larry S. Bryant, Vice President Nuclear Engineering & Technical Services Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Randy Douet Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority P. O. Box 2000 Soddy-Daisy, TN 37384-2000 General Counsel Tennessee Valley Authority 11A East Tower 400 West Summit Hill Drive Knoxville, TN 37902 John C. Fornicola, Manager Nuclear Assurance and Licensing Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Glenn W. Morris, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 (cc w/o encl contd - See page 4)
DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED
TVA 4 DOCUMENT CONTAINS (cc w/o encl contd)
Paul L. Pace, Manager Licensing and Industry Affairs ATTN: James D. Smith Browns Ferry Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 David A. Kulisek, Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P. O. Box 2000 Soddy-Daisy, TN 37384-2000 Lawrence E. Nanney, Director TN Dept. of Environment & Conservation Division of Radiological Health 3rd Floor, L&C Annex 401 Church Street Nashville, TN 37243-1532 County Mayor Hamilton County Courthouse Chattanooga, TN 37402-2801 Ann Harris 341 Swing Loop Rockwood, TN 37854 James H. Bassham, Director Tennessee Emergency Management Agency P. O. Box 41502 Nashville, TN 37204-1502 DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED
_________________________
OFFICE RII:DRS RII:DRS RII:DRS RII:DRP RII:DRP RII:DRP SIGNATURE RA * RA *
NAME KDavis JTornow BBonser MWidmann DATE 9/21 /2006 9/ /2006 9/ /2006 9/28/2006 E-MAIL YES NO YES NO YES NO YES NO YES NO PUBLIC YES w/o SGI