IR 05000254/1984026
| ML20133G897 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 10/09/1985 |
| From: | Creed J, Pirtle G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML20133G877 | List: |
| References | |
| 50-254-85-26, 50-265-85-29, NUDOCS 8510160177 | |
| Download: ML20133G897 (1) | |
Text
.
. --
_-
- --
..__---_- ___-_ - -_
--
.-
-
j r
!
s U.S. NUCLEAR REGULATORY COMMISSION l
REGION III
I Report Nos. 50-254/85026(DRSS); 50-265/85029(DRSS)
l
Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30
l Licensee:
Commonwealth Edison Company Post Office Box 767 j
Chicago, Illinois 60690 Facility Name: Quad Cities Nuclear Power Station, Units 1 and 2 i
l l
Inspection At:
Quad Cities Site, Cordova, Illinois Inspection Conducted:
September 16-19, 1985
!
Date of Previous Physical Security Inspection:
December 11-14, 1984 J
Type of Inspection:
Unannounced Physical Security Inspector:
% i h_sh a tof&lSS
'
l G. L. Pirt'e Date
!
.
Physical Security Inspector l
A 8f l
Approved By:
i
. R. Creed, Chief Date afeguards Section f
i Inspection Summary
i Inspection on September 16-19, 1985 (Report Nos. 50-254/85026(DRSS);
50-265/85029(DR55))
Areas Inspected:
Included a review of Management Effectiveness - Security Program; Testing and Maintenance; Locks, Keys, and Combinations; Security
]
System Power Supply; Lighting; Assessment Aids; Access Control - Personnel -
Vehicles; Alarm Stations; Communications; Security Force Training and
,
)
Qualification Plan; Safeguards Coritingency Plan Implementation; and Licensee's
.
Actions on Previous Inspection Findings.
The inspection involved 23 inspector-hours by one NRC inspector.
The inspection began during the dayshift.
i Results:
The licensee was found to be in compliance with NRC requirements
in the areas examined during the inspection.
i
,
(Details:
UNCLASSIFIED )
i
)
!
l En:lo:ere contains f
l goigg {gs4 a
PDR S.VCCUA?,DS Ihf0mMTICN
j Upon ceparation this
-,
pgo 1:; Decontrolled j
I
!
j