MONTHYEARL-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 IR 05000250/20240112024-08-0606 August 2024 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000250/2024011 and 05000251/2024011 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000250/20240102024-05-0101 May 2024 Design Basis Assurance Inspection Programs Inspection Report 05000250/2024010 and 05000251/2024010 and Notice of Violation L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 ML24096A2142024-04-0505 April 2024 Ltr. to David Hill, Principal Chief, the Muscogee (Creek) Nation, Re., Section 106 Letters for Turkey Point ML24096A2152024-04-0505 April 2024 Ltr. to Lewis Johnson, Principal Chief, Seminole Nation of Oklahoma, Re., Section 106 Letters for Turkey Point ML24096A2162024-04-0505 April 2024 Ltr. to Marcellus Osceola, Chairman, Seminole Tribe of Florida, Re., Section 106 Letters for Turkey Point ML24096A2182024-04-0505 April 2024 Ltr. to Stephanie Bryan, Tribal Chair, Poarch Band of Creek Indians, Re., Section 106 Letters for Turkey Point ML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis 2024-08-06
[Table view] Category:License-Operator
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23191A8622023-07-10010 July 2023 301 Exam ADAMS 2B Administrative Items L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations ML22237A2022022-08-25025 August 2022 Notification of Licensed Operator Initial Examination 05000250/2023301, and 05000251/2023301 L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21160A2702021-06-0909 June 2021 301 ADAMS 2A-3 ML21160A2642021-06-0909 June 2021 301 ADAMS 2A-2 ML21160A2282021-06-0909 June 2021 301 ADAMS 2B ML21123A3032021-05-0303 May 2021 301 Exam Report Items - SRO as Given Written Exam ML21123A3022021-05-0303 May 2021 301 Exam Report Items - RO as Given Written Exam ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML19275G9532019-10-0202 October 2019 Exam Administrative Items (ADAMS-2D) ML19199A1702019-07-17017 July 2019 Operator Licensing Examination Approval 05000250/2019302 and 05000251/2019302 L-2019-108, NRC Regulatory Issue Summary 2019-02: Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 NRC Regulatory Issue Summary 2019-02: Preparation and Scheduling of Operator Licensing Examinations ML19108A2572019-04-18018 April 2019 301 ADAMS 2D Exam Admin Items - Normal Release ML19099A2912019-04-0909 April 2019 2019 Schedule Confirmation for Turkey Point ML19072A2502019-01-26026 January 2019 Tp 2019301 Post Exam Comments ADAMS-1B ML19004A3722019-01-0303 January 2019 Operating Licensing Examination Approval Letter 05000250/2019301 and 05000251/2019301 L-2018-202, NRC Regulatory Issue Summary 2018-02-Revised Response Preparation and Scheduling of Operator Licensing Examinations2018-10-30030 October 2018 NRC Regulatory Issue Summary 2018-02-Revised Response Preparation and Scheduling of Operator Licensing Examinations ML18240A4272018-08-28028 August 2018 301 Exam Draft Items 2A - Delay Release 2 Yrs ML18137A4252018-05-17017 May 2018 Tp 2017-301 Exam Administrative Items (ADAMS-2C) Delay Release 2 Yrs ML18137A4292018-05-17017 May 2018 Tp 2017-301 Exam Administrative Items (ADAMS-2D) ML17349A2092017-12-15015 December 2017 251/2017-301 Post-Exam Comments ML17349A1882017-12-15015 December 2017 05000250/2017301 and 05000251/2017301 Final SRO Written Exam - Delay Release 2 Yrs ML17349A1722017-12-15015 December 2017 05000250,251/2017-301 Final RO Written Exam - Delay Release 2 Yrs ML17298B2882017-10-20020 October 2017 Operator Licensing Written Examination Approval 05000250/2017301 and 05000251/2017301 L-2017-131, Preparation and Scheduling of Operator Licensing Examinations-Updated Response2017-07-28028 July 2017 Preparation and Scheduling of Operator Licensing Examinations-Updated Response ML17191B4822017-07-10010 July 2017 Exan Final Itens 2B - Delay Release 2 Yrs ML17191B4832017-07-10010 July 2017 Exam Administrative Items 2C - Delay Release 2 Yrs ML17065A3262017-03-0303 March 2017 Notification of Licensed Operator Initial Examination 05000250/2017301 and 05000251/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16271A0802016-09-27027 September 2016 301 Final RO Written Exam ML16271A0832016-09-27027 September 2016 301 Final SRO Written Exam ML16271A0852016-09-27027 September 2016 301 Post Exam Comments ML15119A4832015-04-29029 April 2015 Initial Exam 2015-301 Draft Simulator Scenarios ML15119A5372015-04-29029 April 2015 Initial Exam 2015-301 General Correspondence ML15119A5342015-04-29029 April 2015 Initial Exam 2015-301 Final Administrative JPMs ML15119A5262015-04-29029 April 2015 Initial Exam 2015-301 Final Sim In-Plant JPMs ML15119A5192015-04-29029 April 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15119A4992015-04-29029 April 2015 Initial Exam 2015-301 Final Administrative Documents ML15119A4972015-04-29029 April 2015 Initial Exam 2015-301 Draft Administrative JPMs ML15119A4912015-04-29029 April 2015 Initial Exam 2015-301 Draft Sim In-Plant JPMs ML15119A4782015-04-29029 April 2015 Initial Exam 2015-301 Draft SRO Written Examination ML15119A4692015-04-29029 April 2015 Initial Exam 2015-301 Draft RO Written Exam ML15119A4672015-04-29029 April 2015 Initial Exam 2015-301 Draft Administrative Documents ML15068A0352015-03-0909 March 2015 Initial Exam 2015-301 Final SRO Written Exam ML15068A0312015-03-0909 March 2015 Initial Exam 2015-301 Final RO Written Exam L-2014-103, Preparation and Scheduling of Operator Licensing Examinations2014-05-14014 May 2014 Preparation and Scheduling of Operator Licensing Examinations ML13156A1112013-06-0505 June 2013 Initial Exam 2013-301 General Correspondence ML13156A0292013-06-0505 June 2013 Initial Exam 2013-301 Draft Administrative Documents ML13156A0322013-06-0505 June 2013 Initial Exam 2013-301 Draft SRO Written Exam 2023-07-10
[Table view] |
Text
ber 7, 2002
SUBJECT:
TURKEY POINT NUCLEAR PLANT - NRC EXAMINATION REPORT NOS. 50-250/2002-301 AND 50-251/2002-301
Dear Mr. Stall:
During the period October 7-11, 2002, the Nuclear Regulatory Commission (NRC) administered operating examinations to employees of your company who had applied for licenses to operate the Turkey Point Nuclear Plant. At the conclusion of the examination, the examiners discussed the examination questions and preliminary findings with those members of your staff identified in the enclosed report. The written examination was administered by your staff on October 15, 2002.
All seven applicants passed both the written and operating examinations. A Simulation Facility Report is included in this report as Enclosure 2. There were no post examination comments.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Michael E. Ernstes, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41
Enclosures:
(See page 2)
FP&L 2 Enclosures: 1. Report Details 2. Simulation Facility Report
REGION II==
Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 Report Nos.: 50-250/02-301, 50-251/02-301 Licensee: Florida Power & Light Company (FP&L)
Facility: Turkey Point Nuclear Plant Location: 9762 S. W. 344th Steet Florida City, FL 33035 Dates: Operating Tests - October 7-11, 2002 Written Examination - October 15 , 2002 Examiners: R. Aiello, Chief Examiner E. Lea, Senior Operations Engineer R. Monk, Operations Engineer Approved by: M. Ernstes, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Enclosure 1
SUMMARY OF FINDINGS Examinations Report 05000250-02-301, 05000251-02-301 Florida Power & Light Company, on October 7-11, 2002, Turkey Point Nuclear Power Plant, Units 3 and 4, licensed operator examinations.
The NRC examiners conducted operator licensing initial examinations in accordance with the guidance of Examiner Standards, NUREG-1021, Revision 8, Supplement 1. This examination implemented the operator licensing requirements of 10 CFR §55.41, §55.43, and §55.45.
The NRC administered the operating tests during the period October 7- 11, 2002. Members of the Turkey Point Nuclear Plant training staff administered the written examination on October 15, 2002. The operator licensing initial written examinations were developed by the NRC. The operating tests were developed by the Turkey Point staff from an outline submitted by the NRC. All applicants, two Reactor Operators (RO) and five Senior Reactor Operators (SRO) passed the operating and written examinations and were issued operator licenses commensurate with the level of examination administered.
No significant issues were identified.
Report Details 4. OTHER ACTIVITIES (OA)
4OA5 Operator Licensing Initial Examinations a. Inspection Scope The examiners evaluated two RO and five SRO applicants who were being assessed under the guidelines specified in NUREG 1021, Revision 8, Supplement 1, and reviewed written examinations that were administered under the guidelines specified in the NUREG. The NRC administered the operating tests during the period October 7- 11, 2002. Members of the Turkey Point Nuclear Plant training staff administered the written examination on October 15, 2002. The evaluations of the applicants and review of documentation were performed to determine if the applicants, who applied for licensees to operate Turkey Point Nuclear Plant, met requirements specified in 10 CFR Part 55.
b. Findings No findings of significance were identified.
The licensee did not submit any post examination comments concerning the written examination. The written examination and answer key may be accessed in the ADAMS system (ADAMS Accession Number ML023100593).
4OA6 Meetings Exit Meeting Summary On October 11, 2002, the Chief Examiner discussed generic applicant performance and examination development issues with members of licensee management.
The inspectors asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
PARTIAL LIST OF PERSONS CONTACTED Licensee R. Bretton, Operations Continuing Training Supervisor D. Henry, Acting Operations Initial Training Supervisor D. Hutchins, Support Services Supervisor T. Jones, Plant General Manager M. Lacal, Operations Manager G. Laughlin, Acting Training Manager J. McElwein, Site Vice President W. Parker, Licensing Manager B. Stamp, Operations Supervisor NRC R. Reyes, Resident Inspector
SIMULATION FACILITY REPORT Facility Licensee: Turkey Point Facility Docket No.: 050-00250, 050-00251 Operating Tests Administered on: 10/07-11/2002 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review, are not indicative of noncompliance with 10 CFR 55.45(b). These observations do not affect NRC certification or approval of the simulation facility other than to provide information that may be used in future evaluations. No licensee action is required in response to these observations.
While conducting the simulator portion of the operating tests, examiners observed the following items:
ITEM DESCRIPTION SGTR A SGTR of 200 gpm from the A SG was initiated. With all feedwater isolated to the A SG, blowdown isolated and all steam stops were open, it was noted that the A SG level decreased. The B and C SGs were carrying one Terry Turbine each with the steam from A SG isolated to the Terry Turbines. When asked the reason the level in the ruptured SG was decreasing, the Examiner was told by the Simulator Engineer and shown on a monitor that the A SG was supplying about three times as much steam to the common header as were the B and C SGs, even though all steam stops were open to a common header.
He explained that this was due to higher enthalpy in the A SG due to the RCS water entry through the rupture. The level decrease was counter to any previous experience of the Examiner. As the scenario played out, break flow would stop without any mitigating actions by the crew as specified in the SGTR procedure E-3. In order to exercise the crew and the procedure, the leakrate was increased to 700 gpm. This did provide a level rise in the A SG.
Enclosure 2