U. S. NUCLEAR REGULATORY COMMISSION
,
,
OFFICE OF INSPECTION AND ENFORCEMENT
REGION I
50-245/80-16 Report No.
50-333/g0-17
-
50-245 DPR-21 Docket No.
50-336 License No. DPR-65 Safeguards Group C
,
Licensee:
Northeast Nuclear Enercy Comoany P. O. Box 270
.
Hartford, Connecticut 06101 Facility Name:
Millstone Nuclear Power Stations, Units 1 and 2 Inspection At:
Waterford, Connecticut Inspection Conducted:
September 21-26, 1980 Date of Last Physical Security Inspection Visit: June 23-27, 30 and July 1-3. 1980 Type of Inspect'on; Routine, Unannounced, Physical Protection Inspectors: '////[m s4
/ 8 ~~ M
-
WM nw J. Maodeh, Physical Security Inspector date U
l?. b O. W W
//Ilc1U l?0 Lisa M. McKeown, Physical Security Inspector
/ daty date Approved by /T4se/Mh
- O J[Japies W. Devlin, Chief, Security Section,
/ date'
feguards Branch Insoection Summary:
Insoection on Seotember 21-26,1980 (Combined Insoection Recort Nos. 50-245/80-16 and 50-336/80-17)
Areas Insoected:
Included a review of Security Plan; Security Organization; Physical Barriers (Protected and Vital Areas); Lightin Authorization and Badging); Access Controls (g; Access Control (Identification, Saarch and Escorting); Access Controls (Vital Areas); Alarm Stations; Detection Aids; Assessment Aids; Comunications; Testing and Maintenance; Compensatory Measures; Power Supply; Response; Locks, Keys and Combinations; and Records and Reports.
Also, a followup to previously identified items of noncompliance and a followup to Imediate Action Letter (IAL 80-28).
The inspection involved 72 inspector-hours onsite by two NRC Regional based inspectors.
The 1.nspection was begun during off shift, weekend hours; 5 inspector hours were performed during off shift periods.
Results: The licensee was found to be in compliance with NRC requirements within the 21 areas examined during this inspection.
Region I Form 167 81020507 h