Category:INSPECTION REPORT
MONTHYEARIR 05000170/19982011998-03-0303 March 1998 Insp Rept 50-170/98-201 on 980202-06.No Violations Noted. Major Areas Inspected:Plant Status Including Organization & Staffing,Operation Logs & Records & Facility Changes IR 05000170/19930011993-08-13013 August 1993 Safety Insp Rept 50-170/93-01 on 930720-22.No Violations Noted.Major Areas Inspected:Organization & Staffing,Status of Implementaion of Revised 10CFR20 Regulations,Radiation Monitoring & Environ Monitoring ML20196A4841988-11-23023 November 1988 Insp Rept 50-170/88-04 on 881026-28 & 1107.Violation Noted. Major Areas Inspected:Facility Operations,Organization, Reviews & Audits,Operator Requalification Training, Surveillance Activities & Allegation Followup IR 05000170/19880021988-07-26026 July 1988 Matl Control,Acounting & Physical Security Insp Repts 50-170/88-02 & 30-04545/88-01 on 880629-30.No Noncompliances Noted.Major Areas Inspected:Organization & Operation, Shipping & Receiving,Storage & Internal Controls & Records ML20235Y2451987-07-0909 July 1987 Insp Rept 50-170/87-02 on 870601-05.Violation Noted.Major Areas Inspected:Radiation Protection Activities in Support of Reactor License,Posting & Labeling,Training,Audits, Surveys,Instrument Calibr & Exposure Records IR 05000170/19850031985-08-26026 August 1985 Insp Rept 50-170/85-03 on 850813-14.No Violation Noted. Major Areas Inspected:Facility Operations,Organization, Reviews & Audits,Operator Requalification Training, Surveillance Activities & Radiation Protection IR 05000170/19850021985-05-0909 May 1985 Physical Protection Insp Rept 50-170/85-02 on 850422.No Violation Noted.Major Areas Inspected:Physical Protection Measures for Protecting SNM of Low Strategic Significance IR 05000170/19820011982-06-17017 June 1982 IE Safeguards Insp Repts 50-170/82-01 & 30-04545/82-01 on 820513.No Noncompliance Noted.Major Areas Inspected:Facility Organization & Operation,Shipping & Receiving,Storage & Internal Control,Physical Inventory & Records & Repts 1998-03-03
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000170/19982011998-03-0303 March 1998 Insp Rept 50-170/98-201 on 980202-06.No Violations Noted. Major Areas Inspected:Plant Status Including Organization & Staffing,Operation Logs & Records & Facility Changes IR 05000170/19930011993-08-13013 August 1993 Safety Insp Rept 50-170/93-01 on 930720-22.No Violations Noted.Major Areas Inspected:Organization & Staffing,Status of Implementaion of Revised 10CFR20 Regulations,Radiation Monitoring & Environ Monitoring ML20196A4841988-11-23023 November 1988 Insp Rept 50-170/88-04 on 881026-28 & 1107.Violation Noted. Major Areas Inspected:Facility Operations,Organization, Reviews & Audits,Operator Requalification Training, Surveillance Activities & Allegation Followup IR 05000170/19880021988-07-26026 July 1988 Matl Control,Acounting & Physical Security Insp Repts 50-170/88-02 & 30-04545/88-01 on 880629-30.No Noncompliances Noted.Major Areas Inspected:Organization & Operation, Shipping & Receiving,Storage & Internal Controls & Records ML20235Y2451987-07-0909 July 1987 Insp Rept 50-170/87-02 on 870601-05.Violation Noted.Major Areas Inspected:Radiation Protection Activities in Support of Reactor License,Posting & Labeling,Training,Audits, Surveys,Instrument Calibr & Exposure Records IR 05000170/19850031985-08-26026 August 1985 Insp Rept 50-170/85-03 on 850813-14.No Violation Noted. Major Areas Inspected:Facility Operations,Organization, Reviews & Audits,Operator Requalification Training, Surveillance Activities & Radiation Protection IR 05000170/19850021985-05-0909 May 1985 Physical Protection Insp Rept 50-170/85-02 on 850422.No Violation Noted.Major Areas Inspected:Physical Protection Measures for Protecting SNM of Low Strategic Significance IR 05000170/19820011982-06-17017 June 1982 IE Safeguards Insp Repts 50-170/82-01 & 30-04545/82-01 on 820513.No Noncompliance Noted.Major Areas Inspected:Facility Organization & Operation,Shipping & Receiving,Storage & Internal Control,Physical Inventory & Records & Repts 1998-03-03
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARML20239A2041998-08-24024 August 1998 NRC Operator Licensing Exam Rept 50-170/OL-98-01 (Including Completed & Graded Tests) for Tests Administered on 980810- 11.All Candidates Passed Exams IR 05000170/19982011998-03-0303 March 1998 Insp Rept 50-170/98-201 on 980202-06.No Violations Noted. Major Areas Inspected:Plant Status Including Organization & Staffing,Operation Logs & Records & Facility Changes ML20128N3981996-10-0909 October 1996 NRC Operator Licensing Exam Rept 50-170/OL-96-01 for Tests Administered on 960916-17.Exam Results Both Candidates Passed Exam IR 05000170/19930011993-08-13013 August 1993 Safety Insp Rept 50-170/93-01 on 930720-22.No Violations Noted.Major Areas Inspected:Organization & Staffing,Status of Implementaion of Revised 10CFR20 Regulations,Radiation Monitoring & Environ Monitoring ML20246D9221989-08-22022 August 1989 EN-89-032A:on 890822,notice of Violation & Proposed Imposition of Civil Penalties in Amount of $2,500 Will Be Issued for Licenses.Action Based on Number of Violations Involving Failure to Perform Written Safety Evaluations ML20247E8111989-03-22022 March 1989 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $2,500.Violation Noted:Changes Made to Facility W/O Performing Written Safety Evaluation to Assure That Changes Did Not Involve Unreviewed Question ML20246P0541989-03-17017 March 1989 EN-89-032:on 890322,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $2,500 Will Be Issued to Licensee.Action Based on Failure to Perform Written Safety Evaluations ML20196A4841988-11-23023 November 1988 Insp Rept 50-170/88-04 on 881026-28 & 1107.Violation Noted. Major Areas Inspected:Facility Operations,Organization, Reviews & Audits,Operator Requalification Training, Surveillance Activities & Allegation Followup IR 05000170/19880021988-07-26026 July 1988 Matl Control,Acounting & Physical Security Insp Repts 50-170/88-02 & 30-04545/88-01 on 880629-30.No Noncompliances Noted.Major Areas Inspected:Organization & Operation, Shipping & Receiving,Storage & Internal Controls & Records IR 05000170/19880031988-07-21021 July 1988 Unsigned Exam Rept 50-170/88-03OL on 880721.Exam Results: One Senior Reactor Operator Took & Passed Exam IR 05000170/19880011988-03-30030 March 1988 Exam Rept 50-170/88-01OL on 880224-25.Exam Results:One Senior Reactor Operator Candidate Passed Operating Exam But Failed Two Sections of Written Exam ML20235Y2451987-07-0909 July 1987 Insp Rept 50-170/87-02 on 870601-05.Violation Noted.Major Areas Inspected:Radiation Protection Activities in Support of Reactor License,Posting & Labeling,Training,Audits, Surveys,Instrument Calibr & Exposure Records ML20235Y2251987-07-0909 July 1987 Notice of Violation from Insp on 870601-05.Violation Noted: Six 55-gallon Drums Contained Radioactive Matl in Excess of That Specified in 10CFR20,App C & Did Not Bear Required Labels ML20137U5101986-02-14014 February 1986 PNS-I-86-003:on 860213,licensee Received Anonymous Ltr Threatening Use of Bomb to Cause Political & Social Problems for Facility.Military Intelligence & FBI Advised & Investigating Threat ML20140A8041986-02-0606 February 1986 Exam Rept 50-170/86-01 on 860107-08.Exam Results:Both Senior Reactor Operator Candidates Passed.Problems Identified W/ Housekeeping & Maint Controls Outside Reactor Area IR 05000170/19850031985-08-26026 August 1985 Insp Rept 50-170/85-03 on 850813-14.No Violation Noted. Major Areas Inspected:Facility Operations,Organization, Reviews & Audits,Operator Requalification Training, Surveillance Activities & Radiation Protection IR 05000170/19850011985-05-14014 May 1985 Exam Rept 50-170/85-01 on 850311.Exam Results:One Reactor Operator & One Senior Reactor Operator License Issued IR 05000170/19850021985-05-0909 May 1985 Physical Protection Insp Rept 50-170/85-02 on 850422.No Violation Noted.Major Areas Inspected:Physical Protection Measures for Protecting SNM of Low Strategic Significance IR 05000170/19820011982-06-17017 June 1982 IE Safeguards Insp Repts 50-170/82-01 & 30-04545/82-01 on 820513.No Noncompliance Noted.Major Areas Inspected:Facility Organization & Operation,Shipping & Receiving,Storage & Internal Control,Physical Inventory & Records & Repts 1998-08-24
[Table view] |
Text
. .
.
. .
+
.
.
'U.S. NUCLEAR REG'JLATORY COMMISSION
REGION I
Report Nos: 50-170/88-02
,
30-4545/88-01-Docket Nos: '50-170 30-4545 License Nos: R-84 19-08330-02 Safeguards Group: III Licensee: Defense Nuclear Agency Armed Forces Radiobiology Institute Bethesda, Maryland 20014 Facility Name: Armed Forces Radiobiology Research Institute Inspection At: National Naval Medical Center, Bethesda, Maryland Inspection Conducted: June 29-30, 1908 Type of Inspectioo: Routine Unannounced Material Control, Accounting and Physical Security
^
Inspector: de >N/ #M-M
[ A. Della' Rabta, S gu 's Auditor date Approved by: M*)FSafeguards Section, 7-N-M date
. R. Keim1 M hie DRSS Inspection Summary: Inspection on June 29-30,1988 (Combined Inspection Report Nos. 50-170/88-02 and 30-4545/88-01)
Areas Inspected: Nuclear material control, accounting and physical security including: organization and operation, shipping and receiving, storage and internal controls, inventory records and reports, and physical pro".ection measures for special nuclear material of low strategic significanc Results: The licensee was in compliance with NRC requirements in the areas examine PDR ADOCK 05000170 p a PDC ,
- . - - _ - - . - - - - - - , . _ . - - - - _ - . . . - . - -- - -.. . . -
_ . -_- .
_
.
.
.
.
.
Details Key Persons Contacted
- Mr. M. Moore, Chairman, Radiation Sources Department
- Maj. J. Feltry, Chief, Reactor Division
- Capt. K. Hodgdon, Reactor Operations Supervisor
- Mr. D. Eagleson, Interim Radiation Protection Officer Maj. L. Alt, Manager, Radiation Sources Program Msg. T. Quinn, Jr. , Security SFC. G. Talkington, Reactor Operator Ms. W. Ting, Assiscant Aeactor Division Chief Mr. T. O'Brien, Safety and Health Department
- present at exit interview Material Control and Accounting Orgar.tzation and Operation The inspector verified through a review of records that the licensee maintained nuclear material control procedures that are documented in the licensee's Radiological Safety Instructions manual, dated June 8, 1988. The manual contairs appropriate written procedures for special nuclear material (SNM) cortrol and accounting. Written state-ments of responsibility and authority were established for those
, positions with responsibility for SN Shipping and Receiving The inspector determined through a review or records that the licensee maintained procedures to assure that all nuclear material shipped or received was accurately accounted for. There were no transactions involving shipments or receipts of SNM during the period of April 1,1984 to March 31, 198 Storage and Internal Control The inspector determined through observations and review of records that the licensee was maintaining a system of storage and internal controls that indicated the quantity, identity, and current location of all SNM within the facilit Inventory The licensee conducted a physical inventory of all special nuclear material in its possession at intervals not exceeding twelve months. This was substantiated by the inspector upon review of the physical inventory results for the years 1984 through 198 .
.
.
,
-
.
.
The inspector conducted a physical inventory of the facility on June 30,-198 The results of this inventory verified the listings on the licensee's fuel element history cards and foil and source accountability sheets that consisted of the following:
License License R-84 19-08330-02 87-Fuel Elements - Reactor Core 1-PuBe Source - Warm Storage 8-Fuel Elements - Reactor Pool 5 Pu Sources - Warm Storage 4-Fission Chambers-2 Incore 25-Pu Foils - Warm Storage 2 In Reactor Room-3161 Records and Repor The inspector reviewed the licensee's records, reports, and source dat All Material Balance Reports (DOE /NRC Form-742), submitted by the licensee for the period April 1, 1984, to March 31, 1988 were reviewed for compliance with 10 CFR 70.5 Total uranium and uranium depletion records were also reviewed. No discrepancies were identifie Leak test records for six sealed sources were reviewed for complete-ness and timeliness. No exceptions were note The licensee's authorized possession limits were compared with the actual holdings and were in accordance with license condition Exhibit I of this report summarizes the nuclear material activity for the period April 1, 1984 through March 31, 198 . General Physical Security Requirements for SNM of Low Strategic Significance The licensee's program for the physical protection of SNM of low strategic significance was reviewed by the inspector for conformance to the NRC-approved physical security plan, by examining physical barriers, procedures for access and key control, and by observation of a licensee test of alarm system features. Implementation of the physical security plan was found to conform to NRC requirement The licensee is presently in the process of revising its physical security plan to be consistent with Regulatory Guide 5.59, Revision I, dated February 1983, for safeguarding SNM of low strategic significance. The licensee's cu* rent NRC-approved physical security plan, in several areas, exceeds the NRC requirements stated in 10 CFR 73.67 for that materia .
. .
.
.
4. Exit Interview The inspector met with the licensee representatives indicated in paragraph 1 on June 30, 1988 and summarized the scope and findirgs of the inspectio At no time during this inspection was written material provided to the licensee by the inspector.
L l
__ _ . ._ .- .
. _ . - _ . . . _
'M.'
.
. . . .
4 e
's EXHIBIT 1
'
ARMED-FORCES RADI0 BIOLOGICAL'RESEARCH INSTITUTE Docket No. 50-170 License No.'R-84 Docket No.- 30-4545
~
License No.- 19-08330-02 Material Balance for Period April 1, 1984 - March 31, 1988 Reporting Identification Symbol: YAE Reporting Unit: Grams Enriched Uranium Plutonium Element Isotope Element Isotope Physical Inventory:
(April 1, 1984) 18,005 3,599 186 172 Receipts: -0- -0- -0- -0-
.
Material to Account For: 18,095 3,599 186 172 Removals:
Shipments: -0- -0- -0- -0-Fission and Transmutation: 8 8 -0- -0 -
Total Removals 5- ~5- -0- -0-Physical Inventory:
, (March 31, 1988) 18,087 3,591 186 172 Material Accounted For: 18,095 3,599' 186' 172~