IR 05000128/1979003
| ML19253C514 | |
| Person / Time | |
|---|---|
| Site: | 05000128 |
| Issue date: | 11/13/1979 |
| From: | Caldwell R, Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML19253C513 | List: |
| References | |
| 50-128-79-03, 50-128-79-3, NUDOCS 7912050680 | |
| Download: ML19253C514 (1) | |
Text
.
.
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION IV
Report No. 50-128/79-03 Docket No. 50-128 License No. R-83 Licensee: Texas A&M University (TAMU)
Facility Name:
Nuclear Science Center (NSC)
Inspection At:
Coll'ege Station, Texas Inspection Conducted: November 1-2, 1979 Date of Last Physical Security Inspection: July 12-13, 1979, Report 50-128/79-01 Type of Inspection: Unannounced Physical Security Inspection Inspector:
/ Cbe
//// 3/7 j7
"
'R. A. Caldwell, Phy'sical Security / Investigation Date Specialist 7/7f Approved by:
\\
V
//
G. L. Madsen, Chief, Reactor Operations and Date Nuclear Support Branch
-
Inspection S.
_. o Areas Inspected:
Included a review of security plan; protection of SNM; security organization; access control; alarm systems; keys, locks and com-binations; communications; surveillance; physical protection procedures; security program review and protection against radiological sabotage.
The inspection involved 14 inspector hours on-site by one NRC inspector.
The inspection wa.s begun during regular shift.
Results: The licensee was found to be in compliance with NRC requirements in all areas examined during the inspection.
1503 354 7912050
-