IR 05000111/1982001

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-111/82-01 on 820202-03.No Noncompliance Noted.Major Areas Inspected:Radiation Protection Associated W/Dismantling Reactor
ML20041F689
Person / Time
Site: North Carolina State University
Issue date: 02/19/1982
From: Barr K, Peery W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20041F685 List:
References
50-111-82-01, 50-111-82-1, NUDOCS 8203170300
Download: ML20041F689 (7)


Text

.

4't,

UNITED STATES NUCLEAR REGULATORY COMMISSION g

a REGION 11 101 MARIETTA ST N.W., SUITE 3100 o,

~

ATLANTA, GEORGIA 30LM3 s

  • e***

FEB 2 : U82 Report No. 50-111/82-1 Licensee: North Carolina State University Raleigh, North Carolina 27607 Facility Name:

R-3 Research Reactor Docket No. 50-111 License No. R-63 Inspector:

"J.//9/Fz.

.De a

05te Signed c2//cf/Bk Approved by:

m K. P. Batr, 'Section Chief Efat6' Signed Technical Inspection Branch Engineering and Technical Inspection Division SUMMARY Inspection on February 2-3, 1982 Areas Inspected This special, announced inspection involved 16 inspector-hours onsite in the area of radiation protection associated with the dismantling of the R-3 reactor.

Results Of the areas inspected, no violations or deviations were identifiec

.

8203170300 820222 PDR ADOCK 05000111

PDR

_ _ _. _ _

_

__

-.

_

.

REPORT DETAILS 1.

Persons Contacted Licensee Employees Dr. Paul J. Turinsky, Head, Department of Nuclear Engineering

  • Dr. Robert G. Cockrell, Director, Nuclear Reactor Program
  • Mr. Robert D. Cross, Reactor Health Physicist
  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on February 3, 1982, with those persons indicated in paragraph 1 above.

3.

Licensee Action on Previous Inspection Findings Not inspected.

4.

Unresolved Items Unresolved items were not identified during this inspection.

5.

Disposition of Materials a.

This preliminary inspection revealed that irradiated fuel from the R-3 reactor has been shipped to SR00. The first shipment on November 11, 1979 was observed by a Region II inspector (Report No. 50-111/79-3) and no discrepancies were observed. The second shipment to SR00 was made on November 13, 1979. The inspector reviewed the licensee's " Nuclear Material Transaction Reports" for the two shipments (ATTACHMENTS A&B),

and had no questions.

Receipt of the shipments was verified by the authorized official at SR00.

The inspector observed that the fuel storage trench in the floor of the R-3 bay was empty.

Four unirradiated R-3 fuel elements were transferred to the North Carolina State University PULSTAR reactor facility which is located immediately adjacent to the R-3 facility. A five curie plutonium-beryllium neutron source was also transferred to the PULSTAR facility. The unirradiated fuel and neutron source are possessed under PULSTAR License No. R-120, Amendment 6 (Attachment C) issued September 17, 1980 in response to the licensee's application dated January 4, 1980.

The four unirradiated R-3 fuel elements were observed by the inspector to be stored in a three combination lock safe located on the PULSTAR Bay floor. The SNM of low strategic significance is secured in accordance with 10 CFR 73.67(f).

The plutonium-beryll t um neutron source was also observed to be stored in a secure area of the PULSTAR facilit.

.

b.

The licensee is continuing the dismantling and decontamination of the R-3 facility.

Materials containing activation-products and perhaps some contamination remain in the reactor bay, therefore, verification that licensable material is no longer present could not be accomplished at the time of this inspection. This determination will be made at the time of a final inspection and survey.

6.

Confirmatory Survey A review of licensee records of surveys and decontamination efforts revealed that systematic and thorough efforts have been made to eliminate residual contamination.

These efforts are continuing and upon completion of the dismantling, decontamination and final survey by the licensee, a complete review of the program and a verification survey will be performed in a final inspection.

b

~

\\

.

1

?

i

!

.. - -.-.

_ _ _ _

-

. __ __ _ _ __ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _

- _ _.

_

_

$

4;c)

)

io cen so. co. so. ro, iso r4UL.LtAN MAltMIAL IMI ' ACTION REPORT

=g c.,...u..,,...a.,,

......

.

,........

...

... w,

.o

....

. a.. m...

...m._....

......

..o.-

..

.m.um...

-. -. -.. -. _..,...

.. r-v MA f/L saw.t.

j.tct ws.

A s

  • e.

j.sta.vt.

B

/

/..<,.. ( n..

/ */

..r

,.

,

a.

...

-

.

..,. =,.o o. w.u

[...c.

%

n.o3

....-

~.w.=

[...u.

,.

l..

o... u a

..

j... u o...

c o.

a.

D

.

..

.

.oo m

t12 - ny

  • " " * " *

" " " * *

.:

Dept. of Nuclear Engineering E. I. PuPont deNemours w..o..uma e oc ),.,,,.,,,..,,,

n o so.u

== o. j...,,,,,,,

,

372 North Carolins State University Savannsh River Plant

'

MA - UA Raleigh, N. C.

27650 Aiken, S. C.

24301 Same as Block 9 Sat =e as Block 10

UA kq.D)Crossm. p A.;

o me c."..

W T Dickins

M c.,n.eu m

(411725.awNen m

.

DAA

..u..,,o..,,

ca

...c r o...v.

. u

..

....,.n

. o.u.o > n...

'

DZA DAA Ltr. DOE, SROO to Robert Cross, NCSU, dated 8 Nov.1979

. u s.c...,,,,,, m

.

ir-'ar. aev=

i..Rc.,,

.

....,..o..s.

i...c. u

.

c.v.o

..c,

.

Uranium enriched in isotope U-235

. v. ;,y...

i e..

...

T;,

. u '.,

c a.t.

..

..

...,,,

.=.* TRSM l***=

  • = * * 5957
  • * - * * * * '

.

11 7e

.

.,

...

.

.u n.

.

n.. co c

..

.c.u

.

...

..

..

.

e " **

12

SR00 Centract No. DE-AC09-76SR00001

". ' *. *. *

" ' " '

  • * * *

" ' * *

  • * * " " ' * * * * * * * * * * " * ' '

.

...

.

.c......co....

a vor.s s.oss w.aa v.v m'

21.171 lbs.

88*"*"*""-******'****

""

23. SHIPPE R'S DA T A ggg g

.

....

-.....

-.,......

o'Jiy

-

--.

.....

_.

.

l m.n coo coca ir '

,,,,aat,,,,,,

m.ei me

=u.

6805s at. car

.ar et.4=r Etsus.r et"'

"g *

sorwe,e,essarIggi, r, e,. ras twe m.i ma n.i

,

mum M,sm i

mn ai

.,

mo,

.

.,

n,

.

F.

C D

E F

G H

J K

L M

N O

P

20 375 A

USUSOOOO 23.173 lbs.

11+ 3 lb s.

1.615 gm 93.59 1.512 e-

@ u

..ve. T ouao

.=o o.y sa..ee 25. KECEIVER'S DATA

..

'

d,C /,'c.f p %

I (nae.

uss nu..e.

cou.v, -1.ot

~~

'

Chief Supv.

// ff./79

' JID:frc t..e oGe e.uci eve.

..,,,.. cowe.e

+ wars'os a. 0.

Ev0 e

Co CODg o.

ve.e.

G.053 *EsGMT

  • df eleG.or Ettut.: at Cui mE6C4F %

.,,

5 f ?0 gg,ut 810:0PE S,g EtEu.t r a10,r0.Pt ilGMT IAA #ul 6.E stwic.,ne.

CODE

.

i&GiDPE m EMSsT.ml qg g gg 12iM W Ms31

,,,,,

U lb.al thw.m3 g

Mt.1 IM ll ths. e4 k

C D

E F

G H

I J

K L

M N

O P

.t m

.ncrn m m a 9n m

r, n

exne_ n_ n_ n_ n_

un s n_w i_ m t

1g MHTPPFRt f'nNT,A T M FD 1hm DrPr'F t'nt'MI_VER ;EIEN ELEME4T-AND-ISOTOPl&-WEIGiTS-PitOVISif0tAf.t.i ACL*EPTED PENDT%'d n7A PDnf'r t c wra ct.ovrvT.

QW dy. b 7 [- 4

.

- _ _ _ _ _ _ _ _ _.

_ _ _ _ _ _ _ _ __________

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ - -

.

, _ _

so can so. so so. ro. iso

_

s

.

-

.. _

.. _.

geeUt t

.

P

.

.. w.

NUCLEAR MATERIAL TR/ IACTION REPORT

_. _. _..

,

(

_.-....s

....o.

..

.. ;..

.c..o= =.

i inici *

..... co...c.

.

.

. u.=<, coo....

...u.......

..c..o t oo.

...

..... con.....

ZFY

'DZA l

l f 3.erp s.*ri R

{atcrivta A sweest e l et:vvia n

.,......~

~.

m

.

[. /

7,o....

a

,

e. 3..

..

.ao=

{. 6...

E_o3

.

==.cm u j. 6.c.

s

""*"*

'

o si..wv.o= o, car s

.,

'

n =o o, o.e. si.w...

,n

}u=.*vno.v..=..cr.o===

[/ #E'

'

Dept. of Nuclear 5'ngineering E."I. DuPont deNemours is.

o so. ccov=v oo [,,,,,,,.,.,

D7.A. ZFY North Carolina Staw University Savannah River Plant u..a o so.ccou.i' o* j.....,...,

,

DZA Raleigh, N. C.

27650 Aiken, S. C. 29801 Same as Block 9 Same as Block 10 a

NA-WA c....=.,

R. D. Cross o...

(o, W. T Dickinson fJA

.

ra.=.e.ue o..r. g 7.. p an e.,e,s,,..,,o.=. (Rod 7p5. p59 o.

  • M co..

c r.

.n.

.

m....= =.

Ltr. DCE, SROO, to Robert Cross. NCSU, dated 8 Nov.1779

.

DAA

.

, o.

o.v v.

..

...c.

=o.=ns.

. v s co.v e-*>w.v a m DZA DAA

,,

n.n eve.

.c....o a

..,._....o=.i.

Uranium enriched in U-235

, c.

.w.c v.o-

=.cv.o= e.v.

.

e g,.=,* a.c..

,

e.......o.,

..oc

.=v..

,,,

..ggy

,"r. ;T.%

.3..

,

'

,

,,,,,,,

.

.,,,, 5,957

..

337.1

.

=,

13

,.

c. u.=.oo.

,

.,

u.

. =,

.u n.

..- a.. co c,.=

.

...

.

n.

.=

1R00 Contract No. DE-AC 09-7(SR00001

.

.a c = a **

14

" '

" " "

  • ~
  • ~

"

  • " " ' ' ' ' ~ ~ ' '

F9167 T2725 ATE D-110

.

.

u.

....

. u... co.....

ar vevat e.ou woons.u m 23,175 ids.

vo,. voiv r

,

iu 24. $ HIPPER'S DATA

. searun o.

=c euo.s.vu=oems.r.to)

2s. REMAN Ks

....

..o n..

/

4 g79

..n..

co O

=

o,,,,

,,,

........

no

p.M me nie g*,*,*,

,,rree,,E,,o',d,,*,c,ao,s,,c,a,o,s,,d,,,es,,

  • * * *

t-as... 6a 58055 * o5*1

  1. E ' *D8*'

' L 8 "u'm*G"'"a"gg"' 'isot,or,t,uosief

' s,u,ut,e r,

,,,o,s,

,

,,

u.u emi

PA C

D E

F G

H I

J K

L M

N O

P n

we

,

pn 379 A

t?I1Ronon 93_179 The.

1h3 1he 1 f17 me Q3" A QL b

rs 25. s'.ECitVE R1 DATA a w vanunaunumnoun n pup.un swa

/

g g,7

,g g

&# S

.U. Pae.s.t.s.vu.ig

,,,,,,g towpo

,y,.g g g5g guygt R cou.T y E era 0L g

// pt/

1b0 lhM Jest 08mven.Teo.

y y,g EeM%

p. otto,3,to,ps or uu ta Ga055 mE $nt atT pflGHT ElfWitT WEIGHT WDGMT %

Li tfl0FfRROR c006 lb thi g,

,

pse.u1.1

  1. Tf.3 Umle.pl s

q,yg IPM.9tl I

DPt fSOTOP[ h(IGNT O

C D

E F

G H

I J

K L

M N

O P

P.u W 560681 E t t s.t et 110TO.PE

DCEO_2A0lp__ 20 183 c

lbst W1 tw. al t_.sgsocco 143-1.M 7 93 63-1,514

_

___

.

SHIPPER'S_CONIAINER J m p1rrr en MEA.~SURMEN1.

UN7_ygg;rMDA > D;T AN'n T90 TOPIC EEICI

-

-

PROVISIONALLY-ACCEPTED-PENDINO-SZA-PROCUS5

.-

-

l

^

18. U S.C.. Sf CTION 1* t Art or e ie = "

n"

._ - uxf4,P%L~A RE PPI '.

A.m

..

- - _ _ _ - - - - - - - -

-

- - -

--

  • L'.'

' pa %,,'0

,

f, 3,

UNITED STATES

,.

g NUCLEAR REGULATORY COMMISSION y

5.*g

, C WASHING TON. D. C. 20%!>

f*....

NORTH CAROLINA STATE UNIVERSITY AT RALEIGH DOCKET NO. 50-297 NCSU PULSTAR AMENDMENT TO FACILITY LICENSE l

Amendment No. 6 License No. R-120 1.

The Nuclear Regu'atory Commission (the Commission) has found that:

!

A.

Thr. applicaticn for cmendm2nt by the North Carolina State University at Raleigh (the licensec) dated January 4,1980, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended l

(the Act), and the Commission's rules and regulations sat forth in 10

.CFR Chapter I; I

B.

The facility will operate in conformity with the application, the pro-visions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission"s regulations and all applicable requirements have been satisfied; and F.

Publication of notice of this amendment is not required since it does not involve a significant hazards con *,ideration nor amendnent of a ' license of the type described in 10 CFR Section 2.106(a)(2).

Ch

'

&

,

ffhY

-

_ _ - - - - - - - - - -

--

-

'

/'

s

.

-2-2.

Accordingly, paragraph 2.B.(2) of Facility License No. R-120 is hereby amended to read as follows:

(2) Pursuant to the Act and Title 10, Chapter I, CFR, Part 70, "Special Nuclear Material", to receive, possess, and use in connection with operation of the reactor up to 435 kilograms of uranium, including no more than 1.0 kilogram of highly enriched uranium, and up to 200 grams of plutonium-239 in the form of plutonium-beryllium neutron sources.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR RECULATORY COMMISSION

,

James R. Miller, Chief Standardization & Special Projects Branch Division of Licensing Date of Issuance: September 17, 1980

.

b