U.S. NUCLEAR REGULATORY COMMISSION Q'
'
0FFICE OF INSPECTION AND ENFORCEMENT Region I s
Report No.
50-29/80-09 Docket No.
50-29 License No. DPR-3 Priority Category C
Licensee:
Yankee Atomic Electric Company 25 Research Drive Westborough, Massachusetts 01581 Facility Name:
Yankee Nuclear Power Station (Yankee Rowe)
Meeting at:
Rowe, Massachusetts Meeting conducted:
Jun 26, 198 NRC Personnel:
bW
[/23 AD R. J. Bores, Ehief, ESPS, FFMS Branch date signed E K N h -a.--
?As/sc R. Caruso, Project Man
&
3/PC 1_
T. Foley, Resident Insppr - YR dite signed K/ $=A 7/.s3/m T. T. Martin, Chief, RPS #3, RONS Branch date signed
_
[
A 7M NO
W. J. Raymond, Senior Res g nt Inspector - YR date signed Approved by:
f. 0 b%h. Ac h-t R 7/27/d*
E. J. Brunner, Chief, Reactor Operations date signed and Nuclear Support Branch Meeting Summary-Management t'eeting on June 26, 1980 (Report No. 50-29/80-09)
Areas Discussed: Management meeting held at NRC's request to discuss the regulatory performance of Yankee Nuclear Power Station as concluded in the Systematic Assessment of Licensee Performance (SALP) program.
<
Results: A sumary of the licensee performance evaluation was presented.
Areas of concern were discussed with corporate management.
Yankee Rowe's performance was considered to be acceptable.
s
%
l Region I Form 12-1 l
(Rev. August 77)
80200so OF)
'
.
.
.
'
.
DETAILS 1.
Persons Contacted On June 26, 1980, a meeting was held at Yankee Nuclear Power Station (Yankee Rowe) to discuss the iesults of NRC's Systematic Assessment of Licensee Performance (SALP), as it applies to the licensee.
a.
Liw..see Personnel Present Mr. H. A. Autio, Plant Superintendent Mr. B. L. Drawbridge, Plant Operations Engineer Mr. L. H. Heider, Vice President, Operations and Engineering (YAEC)
Mr. D. E. Moody, Manager of Operations (YAEC)
Mr. D. B. Pike, Manager of Operational Quality Assurance (YAEC)
Mr. L. L. Reed, Coordinator Operational Quality Assurance Mr. J. L. Staubb, Technical Assistant to Plant Superintendent b.
NRC Personnel Present Mr. R. J. Bores, Chief. Environmental and Special Projects Section, RI Mr. E. J. Brunner, Chief, Reactor Operations and Nuclear Support Branch, RI Mr. R. Caruso, Project Manager, Operating Reactors Branch 5, NRR Mr. T. Foley, Resident Inspector, Yankee Rowe Mr. T. T. Martin, Chief Reactor Projects Section No. 3, RO&NS Branch, RI Mr. W. J. Raymond, Senior Resident Inspector, Yankee Rowe 2.
Areas Discussed a.
A brief summary of the SALP program was presented, including the basis for the evaluation and its purpose.
b.
The results of NRC's evaluation of the licensee's performance were discussed.
Yankee Rowe's performance to date is considered acceptable.
c.
Items of concern were discussed with torporate management, including those areas where NRC considers additional licensee management attention may be warranted.
I
!
!
.
.
d.
The Yankee Rowe Performance Evaluation Report, dated June 23, 1980, was presented.
e.
NRC's position on the acceptability of surveillance as a substitute for mandatory witness points was provided to the licensee.
NRC does not consider independent surveillance as an acceptable substitute for mandatory witness points.
Furthermore, it was stated that if the licensee desires an alternate to mandatory witness points in their QA program, he is obligated to describe this alternate approach in a proposed revision to his docketed QA program, and submit it to NRR for approval.
f.
NRC's position on shipping papers and radiation level requirements for radioactive material transportation in exclusive use vehicles was also provided the licensee.
The Department of Transportation's requirement that flat-bed type vehicles must have personnel barriers which restrict access to the cargo to enable shipments under 49 CFR 173.393j was discussed.
!
<
-
-
,
.
- __.._
_
o
.
YANKEE R0WE Enclosure 2 PERFORMANCE EVALUATION REPORT JUNE 23, 1980 Region I LICENSEE PERFORMANCE EVALUATION (OPERATIONS)
Facility:
Yankee Rowe Licensee:
Yankee Atomic Electric Company Unit Identification:
Docket No.
License No./Date of Issuance 50-29 DRP 3/ December 24, 1963 Reactor Information:
NSSS:
Westinghouse MWt:
600 Appraisal Period:
May 1979 to May 1980 Appraisal Completion Date: June 23, 1980 Review Board Members:
B. H. Grier, Director, R:I E. J. Brunner, Chief, R0&NS Branch, R:I T. T. Martin, Chief, RPS No. 3, RO&NS Branch, R:I R. Caruso, Licensing Project Manager, Operating Project Branch 5 P. J. Knapp, Chief, Radiation Support Section, FF&MS Branch, R:I R. J. Bores, Chief, Environmental and Special Projects Section, R:I W. J. Raymond, Senior Resident Inspector, YR W. J. Lazarus, Senior Resident Inspector, MY
,
,
I l
I
..
.
.
A.
Number and Nature of Noncompliance Itens Noncompliance category:
Number of Itens:
Violations
Infractions
Deficiencies
Areas of Noncompliance:
Plant Operations
Health Physics
Transportation
Security and Safeguards
B.
Number and Nature of Licensee Event Reports Type of Events:
Number of Reports:
Component Failure
Design / Fabrication / Analysis Error
Defective Procedures
Personnel Error
Other
Causally - linked Events:
10 events divided into 6 groups number of groups (event / group):
3(1), 2(2) and 1(3).
Licensee Event Reports Reviewed:
LER 79-12 to 79-30, and LER 80-01 to 80-09
,
{
I f
..
..
'
C.
Escalated Enforcement Actions Civil Penalties None Orders (1)
Show Cause January 2, 1980, to explain why short term lessons learned Category "A" items will not be implemented by January 31,1980 (January 30, all Cat "A" items were implemented).
(2)
Executive Transportation Order from State of South Carolina, January 23, 1980, prohibiting Transportation of all Radioactive materials to South Carolina.
(Order subsequently lifted).
(3) Confirmatory order, April 4,1980, documenting licensee's commitment to remain shutdown until response to IEB 79-27 submitted to headquarters.
Immediate Action Letters None D.
Management Conferences Held During Past Twelve Months None E.
Justification of Evaluations of Functional Areas Categorized as Requiring an Increase in Inspection Frequency / Scope (See evaluation sheets)
None Required.
!
'
<
~
---
~
r-
.....
/
'
Inspection
.
Frequency and/or Sc.cpe
_
FbNCTIONALAREA Increase No Change Decrease
.
-
.-
1.
Management Controls x
~2.
Plant Operations x
3.
Refueling Operations and Activities x
.-
-
. - _ - - _. _--
4.
Maintenance
-
x
-_ _.
._
_
_
_.
_
__
5.
Surveillance and Preop. Testing x
_:
__
- - - _ - - -
_ - _ - _
=_~.
. --
6.
Training x
7.
Health Phys cs x
8.
Radwaste Operations X
.
9.
Radwaste Transportation x
.-
_-
10.
Environmental Protection x
.
11.
Emergency Planning
.,
j 12.
Fire Protection x
13.
Security and Safeguards x
!
j
__
_ _ _
_ _ _
_ _
-
.-
. _ ~ --
--
-- --
-
-
_ - - -
14.
Design Change and Modifications x
15.
Reporting x
__
,, _ _ _ _ _
.._ __
_
16.
QA Audits x
!
j 17.
Committee Activities
'
x
_ _.
,__
_ _
_
,
__
- _ -.
,
18.
Quality Control x
-
_
- _ _
____ ___
_ __
__ - _-
-
_
19.
Proct eemen't
.
x l
.-
'
i
!
(
-
~ gp: %.,..
fQ
......
a { Resiona' Director Uate Q
'
Q demi-
%
.
..
~