ENS 54882
ENS Event | ||
---|---|---|
04:00 Sep 2, 2020 | ||
Title | Agreement State Report - Medical Event - Underdose | |
Event Description | The following was received from the Georgia Radioactive Materials Program via email:
At the end of the administration of Y-90 SIR Spheres [for the treatment of tumors in the right lobe of the liver], the delivery vial (D-Vial) appeared to overfill as the radiologist was attempting to mix the spheres with a 50/50 solution of contrast and 5 percent dextrose/glucose (D5W). The radiologist noticed some clumping and after attempting to gently disperse the Spheres, he gave a couple hard pushes of the contrast/D5W into the D-Vial. At that time, he noticed the leak. He examined the septum and found it to be dry. As a precaution the radiologist put Durabond on top of the septum. Further examination showed that the material leaked out of the sides of the crimped vial top rather than the septum. The procedure was stopped to prevent further contamination. The event occurred while using SIRTEX new SIROS delivery system. The SIRTEX representative was present providing guidance to the radiologist as this was the first time he used the new system. It is estimated that 75 percent of Y-90 SIR-Spheres were administered to the patient [Prescribed Activity: 3.1 GBq (83.7 mCi); Delivered Activity (estimated): 2.87 Gbq (77.7 mCi)]. It is likely that the residual activity was over estimated due to contamination of the SIROS delivery dome. The usual waste from the procedure is contained in a 1-liter Nalgene containers and then placed in a Lucite shield for dose rate measurements to determine the residual activity. The Siros delivery dome could not be measured in the same geometry and likely resulted in an increased dose rate and underestimate of the total dose delivered. At this time, the prescribing physician indicated he does not expect any adverse effects for the patient and is awaiting the dosimetry evaluation from the patients PET/CT Scan. Attempts have been made to recreate the event without success. There is speculation regarding the size of the dose and that the number of Spheres may have been a factor (larger than typically administered). Representatives from SIRTEX indicate that this has not been an issue at other sites. Prior and subsequent studies with the new SIROS delivery system were successful with less activity. Further evaluation of the equipment to determine why the vial leaked, will be performed following decay and return the manufacturer. Georgia Incident Number: 30 A Medical Event may indicate potential problems in a medical facility's use of radioactive materials. It does not necessarily result in harm to the patient. |
Where | |
---|---|
Georgia Radioactive Material Pgm Newman, Georgia (NRC Region 1) | |
License number: | GA 1632-1 |
Organization: | Georgia Radioactive Material Pgm |
Reporting | |
Agreement State | |
Time - Person (Reporting Time:+59.02 h2.459 days <br />0.351 weeks <br />0.0808 months <br />) | |
Opened: | Irene Bennett 15:01 Sep 4, 2020 |
NRC Officer: | Jeffrey Whited |
Last Updated: | Sep 4, 2020 |
54882 - NRC Website | |
Georgia Radioactive Material Program with Agreement State | ||||
WEEKMONTHYEARENS 560652022-08-23T16:00:00023 August 2022 16:00:00 Agreement State Lost Radioactive Portable Gauge ENS 548822020-09-02T04:00:0002 September 2020 04:00:00 Agreement State | Agreement State Report - Medical Event - Underdose ENS 548792020-08-27T04:00:00027 August 2020 04:00:00 Agreement State | Agreement State Report - Loss of Medical Seed After Removal from Patient ENS 548172020-07-21T04:00:00021 July 2020 04:00:00 Agreement State | ENS 546942020-05-04T04:00:0004 May 2020 04:00:00 Agreement State Agreement State Report - Patient Underdose ENS 546622020-03-31T04:00:00031 March 2020 04:00:00 Agreement State Agreement State Report - Loss of Iodine-125 Seed ENS 541102019-06-11T04:00:00011 June 2019 04:00:00 Agreement State Agreement State Report - Patient Under Dosage Due to Air Being Trapped in the Delivery Line ENS 545492019-05-02T05:00:0002 May 2019 05:00:00 Agreement State Agreement State Report - Broken Density Gauge Shutter ENS 539962019-04-03T04:00:0003 April 2019 04:00:00 Agreement State Agreement State Report - Underdose Administration of Y-90 Theraspheres ENS 545502019-01-18T05:00:00018 January 2019 05:00:00 Agreement State Agreement State Report - Improper Disposal of I-125 Seed ENS 545412018-12-18T05:00:00018 December 2018 05:00:00 Agreement State Agreement State Report - Leaking Promethium-147 Source ENS 545652018-06-29T05:00:00029 June 2018 05:00:00 Agreement State Agreement State Report - Lost Iodine-125 Seed ENS 545372018-04-03T05:00:0003 April 2018 05:00:00 Agreement State Agreement State Report - Stuck Open Shutter ENS 545632017-11-06T05:00:0006 November 2017 05:00:00 Agreement State Agreement State Report - Leaking Cesium-137 Source ENS 546442017-06-09T04:00:0009 June 2017 04:00:00 Agreement State Agreement State Report - Stuck Shutter ENS 545642016-08-09T05:00:0009 August 2016 05:00:00 Agreement State Agreement State Report - Lost I-125 Source 2022-08-23T16:00:00 [Table view] | |