ENS 54263
Jump to navigation
Jump to search
| Where | |
|---|---|
| Davis Besse Ohio (NRC Region 3) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
| LER: | 05000346/LER-2019-003 Anticipatory Reactor Trip System Actuated During Turbine Stop Valve Testing Due to the Closure of a Main Turbine Stop Valve |
| Time - Person (Reporting Time:+-1.27 h-0.0529 days <br />-0.00756 weeks <br />-0.00174 months <br />) | |
| Opened: | Tim Thompson 15:53 Sep 7, 2019 |
| NRC Officer: | Andrew Waugh |
| Last Updated: | Sep 7, 2019 |
| 54263 - NRC Website
| |