Title | Secondary Containment Hatch Left Open |
Event Description | On Thursday, April 5, 2018, at approximately 1117 hours0.0129 days <br />0.31 hours <br />0.00185 weeks <br />4.250185e-4 months <br /> Central Daylight Time, Entergy contract personnel opened the personnel hatch allowing access to the roof of the Secondary Containment Building for the purposes of performing an inspection of various items located on the roof.
During the time period the individuals were on the roof, the hatch was left open. An individual was adjacent to the door with a radio and had constant communication link with the control room operator. Pursuant 10 CFR 50.72(b)(3)(v)(C), and 10 CFR 50.72(b)(3)(v)(D) this event is being reported as an event or condition that could have prevented the fulfillment of a safety function. Because the site had an individual briefed and at the door in constant communications with the control room to close the hatch if condition required such an action, this event is not viewed as an actual loss of safety function. The NRC Resident Inspector was notified. |
Where | |
---|---|
Grand Gulf ![]() Mississippi (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+2.1 h0.0875 days <br />0.0125 weeks <br />0.00288 months <br />) | |
Opened: | Jay Comfort 18:23 Apr 5, 2018 |
NRC Officer: | Steven Vitto |
Last Updated: | Apr 5, 2018 |
53317 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 53317\u003C/a\u003E - \u003Ca href=\"/Grand_Gulf\" title=\"Grand Gulf\"\u003EGrand Gulf\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ESecondary Containment Hatch Left Open\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 53317 - Grand Gulf\n","link":"","lat":32.009233333333334,"lon":-91.04695833333334,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Grand Gulf ![]() | |
WEEKMONTHYEARENS 569382024-01-29T16:05:00029 January 2024 16:05:00
[Table view]10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Core Spray Failure ENS 561852022-10-27T17:28:00027 October 2022 17:28:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Inoperable During Surveillance ENS 561712022-10-20T09:27:00020 October 2022 09:27:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Inoperable During Surveillance ENS 560582022-08-19T17:15:00019 August 2022 17:15:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Four Automatic Depressurization System Valves Inoperable ENS 554512021-09-09T05:33:0009 September 2021 05:33:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Core Spray Inoperable ENS 543712019-11-06T00:11:0006 November 2019 00:11:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Two Diesel Generators Concurrently Inoperable ENS 542712019-09-11T22:19:00011 September 2019 22:19:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Primary Containment Airlock Door Not in Fully Seated Position ENS 542442019-08-28T18:16:00028 August 2019 18:16:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Loss of High Presssure Core Spray ENS 542012019-08-05T14:36:0005 August 2019 14:36:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Personnel Door Unable to Be Closed and Latched ENS 540622019-05-12T15:39:00012 May 2019 15:39:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Reactor Scram Due to Partial Loss of Service Water ENS 533172018-04-05T16:17:0005 April 2018 16:17:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Hatch Left Open ENS 533042018-03-31T07:06:00031 March 2018 07:06:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Inoperable Due to Failed Surveillance Test ENS 532272018-02-18T06:06:00018 February 2018 06:06:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Emergency Diesel Generators Inoperable ENS 532012018-02-11T00:35:00011 February 2018 00:35:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Both Inner and Outer Containment Airlock Doors Inoperable at the Same Time ENS 531172017-12-12T19:30:00012 December 2017 19:30:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Core Spray Declared Inoperable ENS 530382017-10-26T19:45:00026 October 2017 19:45:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Both Divisions of Drywell Vacuum Relief Declared Inoperable ENS 528432017-07-10T02:58:00010 July 2017 02:58:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Loss of Safety Function - Control Room Envelope Inoperable ENS 525162017-01-28T00:08:00028 January 2017 00:08:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Core Spray Declared Inoperable ENS 514732015-10-14T17:20:00014 October 2015 17:20:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Two Containment Isolation Valves Not Properly Tested Per Technical Specifications ENS 514592015-10-08T00:30:0008 October 2015 00:30:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Rendered Inoperable ENS 507862015-02-04T15:34:0004 February 2015 15:34:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Control Room Ventilation Inoperable Due to Mispositioned Ventilation Inspection Port ENS 496472013-12-17T19:32:00017 December 2013 19:32:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Loss of Containment Isolation Capability Due to Surveillance Procedure Error ENS 466872011-03-20T03:36:00020 March 2011 03:36:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident High Pressure Core Spray Valve Breaker Overcurrent Trip Setpoint Out of Tolerance ENS 463342010-10-14T09:22:00014 October 2010 09:22:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Both Trains of Control Room Air Conditioning Inoperable ENS 453162009-08-31T15:14:00031 August 2009 15:14:00 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Secondary Containment Boundary Door Inoperable ENS 416502005-04-29T06:27:00029 April 2005 06:27:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Reactor Core Isolation Cooling Full Flow Test Line May Not Isolate ENS 416452005-04-27T23:07:00027 April 2005 23:07:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Main Steam Line Drain Containment Isolation Valves May Not Isolate ENS 409522004-08-14T15:25:00014 August 2004 15:25:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident Grand Gulf Standby Service Water "C" and High Pressure Core Spray Declared Inoperable 2024-01-29T16:05:00 | |