Title | Part 21 - Potential Defect in General Electric Sb1 Switches and Hea Relays |
Event Description | {{#Wiki_filter:The following is an excerpt from a fax received from United Controls International (UCI):
The purpose of this letter is to provide the NRC with a report in general conformity of the requirements of 10CFR Part 21.21. On March 19, 2013, United Controls Issued an Interim letter regarding a discovered manufacturing change in the contact assembly of General Electric SBM series switches. Since 2009, the manufacturing process of the contact assembly of the SBM switch contacts has changed to have the whole assembly (contact holder and contact tip) tin plated. This was discovered while investigating an SBM switch that failed at a customer site due to high contact resistance across closed contacts. The finding that there was a manufacturing process change in the SBM switches lead to further discussions and evaluations regarding equipment of similar design. General Electric SB1 series switches and HEA series relays use the same contact arrangement design as the SBM series switches. The contact assemblies of the SB1 switches and HEA relays are subject to the same tin plating process of the contact assembly as previously reported on the SBM series switches. At this time, UCI is unable to evaluate if this manufacturing change may have an adverse effect on the capability of the General Electric SB1 switches and GE HEA relays to perform in their intended safety related application. UCI will notify the affected Utilities to our findings. The affected Part Number, Utility, Order Number and Quantity is listed below: Part Number 12HEA61B23SX2; Utility CFE; Order 700372018; Quantity 3 Part Number 12HEA61C236X2; Utility FPL Turkey Point; Order 02260642-34; Quantity 2 Part Number 12HEA61C237; Utility OPPD; Order 180520; Quantity 4 Part Number 12HEA61C238X2; Utility OPPD; Order 180520; Quantity 3 Part Number 12HEA61C237; Utility OPPD; Order 185929; Quantity 2 Part Number 12HEA61C237X2; Utility OPPD; Order 188314; Quantity 2 Part Number 12HEA63C239X2; Utility FPL St. Lucie; Order 02260642-41; Quantity 8 Part Number HEA61C234X2; Utility Antung; Order PP100204; Quantity 2 Part Number HEA61C244X2; Utility OPPD; Order 179664; Quantity 5 Part Number HEA61C241X2; Utility OPPD; Order 179664; Quantity 2 Part Number HEA63C239X2; Utility FPL St. Lucie; Order 02260642-103; Quantity 3 Part Number 12HEA61C238X2; Utility OPPD; Order 194686; Quantity 4 Part Number 16SB1BB339STS2P; Utility Duke Oconee; Order 156606; Quantity 11 Part Number 165BlFB2C85SWM2Y; Utility Nextera Seabrook; Order 2259825-3; Quantity 1 Part Number 16SB1LB2C01LSM2P; Utility CFE; Order 700327408; Quantity 3 Utility CFE is the Comisi�n Federal de Electricidad (Mexico) and Utility Antung is located in Taiwan. If you have any questions or wish to discuss this matter or this report, please contact: Jim Garrison Engineering Manager, Seismic and Equipment Qualification JGarrison@unitedcontrols.com 770-496-1406 X 103 The 10CFR Part 21.21 received on March 19, 2014 is EN #49940., }} |
Where | |
---|---|
United Controls International Norcross, Georgia (NRC Region 1) | |
Organization: | United Controls International |
Reporting | |
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component | |
Time - Person (Reporting Time:+369.62 h15.401 days <br />2.2 weeks <br />0.506 months <br />) | |
Opened: | Korina Looft 13:37 Apr 9, 2014 |
NRC Officer: | Steve Sandin |
Last Updated: | Apr 9, 2014 |
50013 - NRC Website | |
United Controls International with 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component | |
WEEKMONTHYEARENS 562932022-09-07T17:00:0007 September 2022 17:00:00
[Table view]10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 - Power Supply Failures ENS 563882022-09-07T05:00:0007 September 2022 05:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 - Deviation to Qualified Design ENS 562092022-09-07T04:00:0007 September 2022 04:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 - Primary/Secondary Power Supply Failures ENS 512432015-06-03T04:00:0003 June 2015 04:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Potential Part 21 - Allen Bradley Failure to Document Design Change ENS 509352015-01-30T04:00:00030 January 2015 04:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part-21 Notification - Sense and Transfer Module Resistive Short ENS 503312014-06-04T04:00:0004 June 2014 04:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 Interim Report - Temperature Switch Set Points Out of Calibration ENS 500132014-03-25T04:00:00025 March 2014 04:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 - Potential Defect in General Electric Sb1 Switches and Hea Relays ENS 499402014-03-21T04:00:00021 March 2014 04:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 - Sbm Selector Switches Contact Assembly Unplanned Manufacturing Change 2022-09-07T05:00:00 | |