At 0315
CST T.S. 2.0.1 was entered for all four Raw Water pumps being declared
inoperable. The pumps were declared
inoperable due to inability to close one of the sluice gates. There are six sluice gates and one is not functional.
At 0518 the technical specification required shutdown commenced.
The licensee notified the NRC Resident Inspector.
- * * UPDATE FROM AMY BURKHART TO NESTOR MAKRIS ON 01/09/14 AT 1915 EST * * *
At 0900 CST 1/9/14 Fort Calhoun Station Unit 1 was manually tripped and entered Mode 3. Reactor Coolant System (RCS) cooldown to less than 300 deg F was commenced at time 1030 CST 1/9/14. The RCS temperature was less than 300 deg F at time 1433 CST. A press release has been issued.
The licensee informed the NRC Resident Inspector.
Notified R4DO [Hagar]