ENS 50214
ENS Event | |
---|---|
05:01 Jun 20, 2014 | |
Title | Technical Specification Required Shutdown |
Event Description | The National Weather Service predicts that the Missouri River level at Fort Calhoun Station will exceed 1004 feet above mean sea level on 6/20/14 at approximately 2300 CDT. Fort Calhoun Station will begin a ramp down in power to satisfy technical specification 2.16 which states, 'When the Missouri River level reaches elevation 1004 feet mean sea level, the reactor shall be in a HOT SHUTDOWN condition [Mode 3] and in Cold Shutdown [Mode 4] within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> following entry into Hot Shutdown.' The river level is currently 998 feet 3 inches and rising approximately 0.5 inches per hour. At time 0001 CDT 6/20/14 Fort Calhoun station will initiate a plant shutdown to Hot Standby and will proceed to a Cold Shutdown condition within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> following entry into Hot Shutdown, as required.
The licensee notified the NRC Resident Inspector.
EN 50214 is being retracted. At 2300 [CDT] on 6/21/14, actual Missouri River level at Fort Calhoun Station peaked at 1001' 2" mean sea level (msl) and did not reach TS 2.16 (1) shutdown criteria of 1004' msl. Based on current Army Corps of Engineers and National Weather Service published Missouri River levels, the river upstream of Fort Calhoun Station has peaked and is trending down following the recent storms. River level is predicted to continue trending downward to normal summer navigation season levels. Plans to shutdown have been terminated. Fort Calhoun Station will continue to monitor weather and river levels. Current reactor power is 66% and Fort Calhoun Station is raising power to 100%. The lowest reactor power achieved was 30 percent at 1200 CDT on 06/20/2014. The licensee notified the NRC Resident Inspector. Notified R4DO (Hay) |
Where | |
---|---|
Fort Calhoun ![]() Nebraska (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
Time - Person (Reporting Time:+-4.53 h-0.189 days <br />-0.027 weeks <br />-0.00621 months <br />) | |
Opened: | Amy Burkhart 00:29 Jun 20, 2014 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Jun 22, 2014 |
50214 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 50214\u003C/a\u003E - \u003Ca href=\"/Fort_Calhoun\" title=\"Fort Calhoun\"\u003EFort Calhoun\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ETechnical Specification Required Shutdown\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 50214 - Fort Calhoun\n","link":"","lat":41.520963888888886,"lon":-96.07684444444445,"icon":"/w/images/6/6a/Omaha_Public_Power_District_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Cold Shutdown (0 %) |
WEEKMONTHYEARENS 502142014-06-20T05:01:00020 June 2014 05:01:00
[Table view]10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown ENS 500382014-04-15T20:15:00015 April 2014 20:15:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Failure of Control Room Air Conditioning ENS 497042014-01-09T11:18:0009 January 2014 11:18:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Tech Spec Required Shutdown Due to Inoperable Raw Water Pumps. ENS 463682010-10-27T17:22:00027 October 2010 17:22:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unit Commenced Shutdown After Declaring Containment Spray Inoperable ENS 458282010-04-08T21:22:0008 April 2010 21:22:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Inoperable Steam Generator Inlet Isolation Valve ENS 448512009-02-13T21:26:00013 February 2009 21:26:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unusual Event - Engineering Analysis Requires Technical Specification Shutdown ENS 424862006-04-10T15:55:00010 April 2006 15:55:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Personnel Air Lock Door Equalizing Valve Leaking by 2014-06-20T05:01:00 | |