ENS Event | |
---|---|
20:00 Sep 20, 2013 | |
Title | Potential Design Basis Flooding Issues Related to Battery Room Wall Penetrations and Cable Vault Floor Drains |
Event Description | On 9/20/2013 at 1600 EDT, R.E. Ginna Nuclear Power Plant determined that there was a potential for flooding of both battery rooms during a design basis flood due to unqualified wall penetration material and partially blocked cable vault floor drains. Testing of underground cable vault drain lines failed to demonstrate that they could pass the required flow due to debris accumulation. The penetrations are below grade and approximately five feet above the bottom of the vault floor. During a design basis flood, water could flow through the holes in the vault manhole covers and fill up the vaults to the level of the penetrations. Since the penetration barriers do not appear to be qualified for flooding, leakage into Battery Room B could be expected. Battery Room A and Battery Room B have a normally closed emergency fire door between them that allows water to pass under the door into Battery Room A where a sump pump exists. It is not currently known if the sump pump capacity would have been able to mitigate flooding of both battery rooms. The discovery of this condition is being reported as an unanalyzed condition as defined by 10 CFR 50.72(b)(3)(ii)(B).
The 125VDC system is currently Operable. Current weather forecasts do not predict the conditions necessary for flooding. Additionally, compensatory measures have been implemented to provide barriers to water entry into the vault manholes until corrective actions are implemented. The NRC Resident Inspector has been notified of this condition |
Where | |
---|---|
Ginna New York (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
Time - Person (Reporting Time:+-0.25 h-0.0104 days <br />-0.00149 weeks <br />-3.4245e-4 months <br />) | |
Opened: | Don Dettman 19:45 Sep 20, 2013 |
NRC Officer: | Charles Teal |
Last Updated: | Sep 20, 2013 |
49374 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 49374\u003C/a\u003E - \u003Ca href=\"/Ginna\" title=\"Ginna\"\u003EGinna\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EPotential Design Basis Flooding Issues Related to Battery Room Wall Penetrations and Cable Vault Floor Drains\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 49374 - Ginna\n","link":"","lat":43.277569444444445,"lon":-77.30936388888888,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 499142014-03-13T20:30:00013 March 2014 20:30:00
[Table view]10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Postulated Hot Short Fire Event That Could Adversely Impact Safe Shutdown Equipment ENS 493742013-09-20T20:00:00020 September 2013 20:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Potential Design Basis Flooding Issues Related to Battery Room Wall Penetrations and Cable Vault Floor Drains ENS 489182013-04-12T14:10:00012 April 2013 14:10:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition - Missing Backflow Preventer ENS 483332012-09-21T18:00:00021 September 2012 18:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Identified in Appendix R Fire Scenario ENS 471672011-08-18T14:00:00018 August 2011 14:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition That Could Potentially Impact Both Trains of 480V Safeguards Buses ENS 467352011-04-06T19:30:0006 April 2011 19:30:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Degraded Fire Barrier ENS 428312006-09-07T02:00:0007 September 2006 02:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Historical Unanalyzed Condition Identified ENS 425882006-05-18T19:00:00018 May 2006 19:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unevaluated Failure of Charging Pump in Fire Scenario ENS 408932004-07-22T13:42:00022 July 2004 13:42:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Gap Discovered in Control Room Envelope ENS 401842003-09-19T22:00:00019 September 2003 22:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition 2014-03-13T20:30:00 | |