ENS 48558
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
05:31 Dec 5, 2012 | |
Title | Radiation Monitor Out of Service for Planned Maintenance |
Event Description | This is a non-emergency eight hour notification for a loss of emergency assessment capability. On December 5, 2012, Radiation Monitor R-9, Letdown Line Radiation Monitor, was bypassed at 0031 hours3.587963e-4 days <br />0.00861 hours <br />5.125661e-5 weeks <br />1.17955e-5 months <br /> as part of planned maintenance on the Chemical Volume and Control System and is not available for monitoring letdown line radiation.
This radiation monitor is used for accident assessment and is credited for Emergency Action Level (EAL) classification for an Unusual Event in the Robinson Nuclear Plant Emergency Plan. Additionally, this monitor is one of multiple indicators used to detect the loss of a fission product barrier. Inability to classify an EAL due to an out of service monitor is considered a loss of accident assessment capability and is reportable per 10 CFR 50.72(b)(3)(xiii) as described in NUREG-1022, Rev. 2. Actions are in place to restore the monitor to functional status. The NRC Resident Inspector will be notified.
Radiation Monitor R-9 was returned to service at 2022 EST. The licensee informed the NRC Resident Inspector. Notified R2DO (Blamey). |
Where | |
---|---|
Robinson South Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+2.48 h0.103 days <br />0.0148 weeks <br />0.0034 months <br />) | |
Opened: | Kenneth Myhren 08:00 Dec 5, 2012 |
NRC Officer: | Bill Huffman |
Last Updated: | Dec 5, 2012 |
48558 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48558\u003C/a\u003E - \u003Ca href=\"/Robinson\" title=\"Robinson\"\u003ERobinson\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ERadiation Monitor Out of Service for Planned Maintenance\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48558 - Robinson\n","link":"","lat":34.40111111111111,"lon":-80.15933333333334,"icon":"/w/images/7/75/Duke_Energy_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 547682020-07-10T13:00:00010 July 2020 13:00:00
[Table view]10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Common Emergency Operations Facility Maintenance ENS 523322016-10-29T14:32:00029 October 2016 14:32:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center (Tsc) and Emergency Operations Facility (Eof) Ventilation System Out of Service ENS 485662012-12-07T14:20:0007 December 2012 14:20:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Emergency Offsite Facility/Technical Support Center Ventilation Maintenance ENS 485582012-12-05T05:31:0005 December 2012 05:31:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Radiation Monitor Out of Service for Planned Maintenance ENS 485082012-11-14T14:27:00014 November 2012 14:27:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Radiation Monitor Out of Service ENS 483542012-09-28T12:30:00028 September 2012 12:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Emergency Offsite Facility/Technical Support Center Ventilation Maintenance ENS 482882012-09-08T12:00:0008 September 2012 12:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Emergency Offsite Facility/Technical Support Center Ventilation Maintenance ENS 481802012-08-11T11:30:00011 August 2012 11:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Ventilation Out of Service for Scheduled Maintenance ENS 478282012-04-12T13:30:00012 April 2012 13:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Tsc and Eof Out of Service Due to Maintenance ENS 476632012-02-14T17:40:00014 February 2012 17:40:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Response Facility Information System Due to Planned Modification ENS 475012011-12-06T14:00:0006 December 2011 14:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Assessment Capability ENS 468282011-05-07T12:27:0007 May 2011 12:27:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Emergency Data Systems Out of Service Due to Planned Modification ENS 462042010-08-25T12:45:00025 August 2010 12:45:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Several Display Systems Due to Planned Computer Modifications ENS 431342007-01-30T10:43:00030 January 2007 10:43:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Response Facility Information System ENS 431272007-01-27T14:05:00027 January 2007 14:05:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Erfis Removed from Service for Planned Modification ENS 430812007-01-06T15:00:0006 January 2007 15:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Spds Parameter Display Due to Planned Modification ENS 412952004-12-26T14:04:00026 December 2004 14:04:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Communications/Response Capability ENS 405342004-02-21T04:20:00021 February 2004 04:20:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Emergency Response Facility Information System Inoperable ENS 404772004-01-26T03:36:00026 January 2004 03:36:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Response Communications Due to Failed Uninterruptible Power Supply 2020-07-10T13:00:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_48558&oldid=423440"