ENS 47501
ENS Event | |
---|---|
14:00 Dec 6, 2011 | |
Title | Loss of Emergency Assessment Capability |
Event Description | At 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> EST, on December 6, 2011, Emergency Preparedness personnel determined that the Unusual Event and Alert EAL criteria for the Liquid Waste Disposal Effluent could not be achieved due to the monitor range capability. Specifically, the R-18 effluent monitor instrument range has a maximum range of 1.0E+06 with the alarm set at 1.0E+06. The UE and Alert criteria, which are 2 times the alarm and 200 times the alarm respectively, both exceed the instrument range.
The NRC Resident Inspector has been notified. This condition has existed for some time (at least three years) and was discovered during a review of the Operating Experience database involving a similar condition reported by Crystal River-3. The licensee maintains the ability to perform grab samples of the liquid effluent for assessment.
As a follow-up to the condition reported above, the licensee inspected other discharge and effluent radiation monitors for similar conditions and provided the following update: At 2250 hours0.026 days <br />0.625 hours <br />0.00372 weeks <br />8.56125e-4 months <br /> EST, on December 8, 2011, it was determined that the Alert EAL classification criteria for the Steam Generator Blowdown radiation monitors and the Condensate Polisher Sump discharge radiation monitor could not be achieved due to the monitors range capability. Specifically, the R-19 A, B, C and the R-37 monitors instrument range have a maximum range of 1.6E+06 which is less than the Alert EAL classification criteria. This information was validated as a follow-up to a similar event which was reported on December 6, 2011 in EN 47501. The NRC Resident Inspector has been notified. R2DO (Musser) notified. |
Where | |
---|---|
Robinson South Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-0.1 h-0.00417 days <br />-5.952381e-4 weeks <br />-1.3698e-4 months <br />) | |
Opened: | Ray Buzard 13:54 Dec 6, 2011 |
NRC Officer: | Steve Sandin |
Last Updated: | Dec 9, 2011 |
47501 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 47501\u003C/a\u003E - \u003Ca href=\"/Robinson\" title=\"Robinson\"\u003ERobinson\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ELoss of Emergency Assessment Capability\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 47501 - Robinson\n","link":"","lat":34.40111111111111,"lon":-80.15933333333334,"icon":"/w/images/7/75/Duke_Energy_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 547682020-07-10T13:00:00010 July 2020 13:00:00
[Table view]10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Common Emergency Operations Facility Maintenance ENS 523322016-10-29T14:32:00029 October 2016 14:32:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center (Tsc) and Emergency Operations Facility (Eof) Ventilation System Out of Service ENS 485662012-12-07T14:20:0007 December 2012 14:20:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Emergency Offsite Facility/Technical Support Center Ventilation Maintenance ENS 485582012-12-05T05:31:0005 December 2012 05:31:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Radiation Monitor Out of Service for Planned Maintenance ENS 485082012-11-14T14:27:00014 November 2012 14:27:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Radiation Monitor Out of Service ENS 483542012-09-28T12:30:00028 September 2012 12:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Emergency Offsite Facility/Technical Support Center Ventilation Maintenance ENS 482882012-09-08T12:00:0008 September 2012 12:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Emergency Offsite Facility/Technical Support Center Ventilation Maintenance ENS 481802012-08-11T11:30:00011 August 2012 11:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Ventilation Out of Service for Scheduled Maintenance ENS 478282012-04-12T13:30:00012 April 2012 13:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Tsc and Eof Out of Service Due to Maintenance ENS 476632012-02-14T17:40:00014 February 2012 17:40:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Response Facility Information System Due to Planned Modification ENS 475012011-12-06T14:00:0006 December 2011 14:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Assessment Capability ENS 468282011-05-07T12:27:0007 May 2011 12:27:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Emergency Data Systems Out of Service Due to Planned Modification ENS 462042010-08-25T12:45:00025 August 2010 12:45:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Several Display Systems Due to Planned Computer Modifications ENS 431342007-01-30T10:43:00030 January 2007 10:43:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Response Facility Information System ENS 431272007-01-27T14:05:00027 January 2007 14:05:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Erfis Removed from Service for Planned Modification ENS 430812007-01-06T15:00:0006 January 2007 15:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Spds Parameter Display Due to Planned Modification ENS 412952004-12-26T14:04:00026 December 2004 14:04:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Communications/Response Capability ENS 405342004-02-21T04:20:00021 February 2004 04:20:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Emergency Response Facility Information System Inoperable ENS 404772004-01-26T03:36:00026 January 2004 03:36:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Response Communications Due to Failed Uninterruptible Power Supply 2020-07-10T13:00:00 | |