Title | 60 - Day Optional Telephone Notification of an Invalid Division 2 Containment Isolation Signal |
Event Description | This 60-day telephone notification is being made per the reporting requirements specified in 10 CFR 50.73(a)(2)(iv)(A) and 10 CFR 50.73(3)(1) to describe an invalid actuation signal affecting containment isolation valves in more than one system.
On May 24, 2012, Nine Mile Point Unit 2 (NMP2) received a Division 2 primary containment isolation signal which resulted in closure of Group 3, 8, and 9 primary containment isolation valves (PCIVs) in the following systems: Group 3 PCIVs: Traversing Incore Probe (TIP) ball valves (the TIPS were already withdrawn and the ball valves were already closed); nitrogen purge to TIP indexing mechanism. Group 8 PCIVs: Reactor building closed loop cooling system; drywell equipment drain system; drywell floor drain system; instrument air system; hydrogen recombiner system; containment monitoring system; reactor recirculation system flow control valve hydraulic system; containment leakage monitoring system. Group 9 PCIVs: Containment purge system (the containment purge valves were already closed). All affected PCIVs responded as designed. In addition, the Division 2 containment isolation signal resulted in isolation of the Reactor Building normal ventilation system, starting of the Division 1 and Division 2 standby gas treatment subsystems, starting of the Division 1 and Division 2 Reactor Building safety-related unit coolers, and starting of the Division 2 Control Room envelope filtration subsystem. The Division 2 isolation signal was generated during a maintenance activity involving the replacement of a relay in a main control room panel. During the activity, an installed jumper became dislodged from its point of origin, leading to a blown control power fuse and generation of the Division 2 isolation signal. Since the isolation signal was not initiated in response to actual plant conditions or parameters satisfying the requirements for initiation, the isolation signal was determined to be invalid. This event was entered into the corrective action program as Condition Report (CR) 2012-005128. There were no safety consequences or impact on the health and safety of the public as a result of this event. The Licensee has notified the NRC Resident Inspector. |
Where | |
---|---|
Nine Mile Point New York (NRC Region 1) | |
Reporting | |
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation | |
Time - Person (Reporting Time:+1297.78 h54.074 days <br />7.725 weeks <br />1.778 months <br />) | |
Opened: | Carl Crawford 16:07 Jul 17, 2012 |
NRC Officer: | Bill Huffman |
Last Updated: | Jul 17, 2012 |
48113 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48113\u003C/a\u003E - \u003Ca href=\"/Nine_Mile_Point\" title=\"Nine Mile Point\"\u003ENine Mile Point\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E60 - Day Optional Telephone Notification of an Invalid Division 2 Containment Isolation Signal\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48113 - Nine Mile Point\n","link":"","lat":43.52021388888889,"lon":-76.40656388888888,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Not Critical |
Scram | No |
Before | Cold Shutdown (0 %) |
After | Cold Shutdown (0 %) |
WEEKMONTHYEARENS 535842018-03-19T04:00:00019 March 2018 04:00:00
[Table view]10 CFR 50.73(a)(1), Submit an LER Invalid Specified System Actuation ENS 527472017-03-20T06:16:00020 March 2017 06:16:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Telephone Notification for an Invalid High Pressure Coolant Injection System Actuation ENS 509092015-01-21T15:00:00021 January 2015 15:00:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Notification - Invalid Containment Isolation Signal ENS 490842013-04-02T13:46:0002 April 2013 13:46:00 10 CFR 50.73(a)(1), Submit an LER 6O-Day Optional Telephone Notification for an Invalid Specified System Actuation ENS 485702012-10-12T14:12:00012 October 2012 14:12:00 10 CFR 50.73(a)(1), Submit an LER Temperature Switch Failure Causes Division I Isolation Signal ENS 481132012-05-24T14:20:00024 May 2012 14:20:00 10 CFR 50.73(a)(1), Submit an LER 60 - Day Optional Telephone Notification of an Invalid Division 2 Containment Isolation Signal ENS 475472011-11-08T03:31:0008 November 2011 03:31:00 10 CFR 50.73(a)(1), Submit an LER Invalid Specified System Actuation Due to a Possible Faulty Temperature Switch ENS 457792010-03-15T16:43:00015 March 2010 16:43:00 10 CFR 50.73(a)(1), Submit an LER Inadvertent Start of Emergency Diesel Generator ENS 439232008-01-14T18:41:00014 January 2008 18:41:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of Group 5 and Group 10 Primary Containment Valves During Surveillance Testing ENS 438552007-11-08T15:21:0008 November 2007 15:21:00 10 CFR 50.73(a)(1), Submit an LER Invalid Primary Containment Isolation System (Pcis) Actuation ENS 407182004-04-01T07:06:0001 April 2004 07:06:00 10 CFR 50.73(a)(1), Submit an LER Invalid Automatic Start of Emergency Diesel Generator During Surveillance Test 2018-03-19T04:00:00 | |