ENS 47277
ENS Event | |
---|---|
15:07 Sep 19, 2011 | |
Title | Spds and Erds Unavailable During Replacement of Plant Process Computer System |
Event Description | At 1007 CDT on September 19, 2011, the Unit 2 Plant Process Computer (PPC) was removed from service for a planned replacement in the current Unit 2 Refueling Outage. The Unit 2 PPC feeds the Safety Parameter Display System (SPDS) used in the Main Control Room (MCR) and the Technical Support Center (TSC). The Unit 2 PPC also feeds the Emergency Response Data System (ERDS). The Unit 1 and Unit 2 PPCs also feed the Plant Parameters Display System (PPDS) used in the MCR, TSC and Emergency Operations Facility (EOF). Meteorological data will remain available. The dose assessment program will remain functional as the Unit 1 PPC will be capable of providing the necessary data through PPDS to run the program. The dose assessment program is not affected by the Unit 2 PPC being out of service. As compensatory measures, a proceduralized backup method to fax or communicate via a phone circuit applicable data to the NRC, TSC, and EOF exists. There is no impact on the Emergency Notification System (ENS) or Health Physics Network (HPN) communication systems.
The new Unit 2 PPC is scheduled to be functional on September 25, 2011. However, based on the Mode Unit 2 will be in, this will limit the number of points that would provide usable data. The Unit 2 PPC will be tested as Mode changes occur. The Unit 2 PPC is planned to be declared functional by Mode 2. A follow-up ENS call will be made once the Unit 2 PPC is declared functional. The loss of SPDS and ERDS is a 'major loss of assessment capability' and is reportable under 10CFR50.72(b)(3)(xiii). The NRC Senior Resident Inspector and the State of Illinois (through the Illinois Emergency Management Agency Resident Inspector) have been notified of this ENS call.
As of 1800 CDT on October 8, 2011, the Unit Two PPC is considered operational with respect to the Safety Parameter Display System (SPDS), Plant Parameter Display System (PPDS) and Emergency Response Data System (ERDS). Therefore, a major loss of assessment capability no longer exists on Unit 2. The Byron EP manager contacted the NRC ERDS Center yesterday on 10/7/11 to conduct an ERDS test for Unit 2 to ensure the data was being satisfactorily sent to the NRC. Unit-1 and Unit-2 ERDS data to NRC was tested satisfactory IAW EP-AA-124-F-01. The NRC Resident Inspector and the State of Illinois (through the Illinois Emergency Management Agency Resident Inspector) have been notified of this ENS update. R3DO (Phillips) notified. |
Where | |
---|---|
Byron Illinois (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-3.95 h-0.165 days <br />-0.0235 weeks <br />-0.00541 months <br />) | |
Opened: | Shane Harvey 11:10 Sep 19, 2011 |
NRC Officer: | Bill Huffman |
Last Updated: | Oct 8, 2011 |
47277 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 47277\u003C/a\u003E - \u003Ca href=\"/Byron\" title=\"Byron\"\u003EByron\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ESpds and Erds Unavailable During Replacement of Plant Process Computer System\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 47277 - Byron\n","link":"","lat":42.07673888888889,"lon":-89.28115,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Not Critical |
Scram | No |
Before | Cold Shutdown (0 %) |
After | Cold Shutdown (0 %) |
WEEKMONTHYEARENS 566982023-08-25T21:00:00025 August 2023 21:00:00
[Table view]10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Assessment Capability ENS 563542023-02-06T11:30:0006 February 2023 11:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Communications and Assessment Capabilities ENS 557692022-03-06T03:15:0006 March 2022 03:15:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Degradation of Technical Support Center ENS 547102020-05-13T15:00:00013 May 2020 15:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Response Facility ENS 529192017-08-21T02:08:00021 August 2017 02:08:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Assessment Capability Due to Non-Functional Tsc Ventilation ENS 521002016-07-18T20:00:00018 July 2016 20:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Offsite Communications Capability ENS 514122015-09-17T05:30:00017 September 2015 05:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Control Room Area Radiation Monitors Not Able to Provide Radiation Level Information ENS 514012015-09-17T03:00:00017 September 2015 03:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Seismic Monitoring Instrumentation During Planned Maintenance ENS 509882015-04-16T10:00:00016 April 2015 10:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Scheduled Maintenance Affecting Technical Support Center Hvac ENS 508812015-03-12T14:00:00012 March 2015 14:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of the Seismic Monitoring Computer ENS 495992013-12-03T04:00:0003 December 2013 04:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center (Tsc) Non-Functional Due to Planned Maintenance ENS 493752013-09-21T20:31:00021 September 2013 20:31:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Commercial and Ens Communications Due to an Area Phone Outage ENS 491382013-06-20T16:18:00020 June 2013 16:18:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Ventilation Removed from Service for Maintenance ENS 482902012-09-10T14:00:00010 September 2012 14:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Plant Process Computer Removed from Service for Maintenance ENS 472772011-09-19T15:07:00019 September 2011 15:07:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Spds and Erds Unavailable During Replacement of Plant Process Computer System ENS 459982010-06-10T13:30:00010 June 2010 13:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Ventilation Maintenance ENS 459712010-06-01T17:39:0001 June 2010 17:39:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Ventilation System Discovered to Be Non-Functional ENS 450572009-05-12T07:44:00012 May 2009 07:44:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Assessment Capability ENS 450202009-04-25T15:48:00025 April 2009 15:48:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Erds Unavailability Due to Plant Process Computer Failure ENS 449012009-03-12T09:20:00012 March 2009 09:20:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Process Computer and Erds Unavailable for Greater than 60 Minutes ENS 443842008-08-04T23:45:0004 August 2008 23:45:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of 84 of 94 Emergency Sirens Due to Inclement Weather ENS 427122006-07-18T02:46:00018 July 2006 02:46:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Emergency Evacuation Siren Failures Due to Thunderstorms 2023-08-25T21:00:00 | |