ENS 45020
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
15:48 Apr 25, 2009 | |
Title | Erds Unavailability Due to Plant Process Computer Failure |
Event Description | The Unit One Plant Process Computer failed at 1048 CDT. The failure disabled plant data information inputs to the NRC Emergency Response Data System (ERDS). ERDS unavailability was validated by the NRC. ERDS was not restored within one hour, which necessitates this ENS notification per 50.72(b)(3)(xiii). The Plant Process Computer was restored at 1342, which restored ERDS.
The NRC Resident Inspector has been notified. |
Where | |
---|---|
Byron Illinois (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+0.23 h0.00958 days <br />0.00137 weeks <br />3.15054e-4 months <br />) | |
Opened: | Ken Hetzel 16:02 Apr 25, 2009 |
NRC Officer: | Bill Huffman |
Last Updated: | Apr 25, 2009 |
45020 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 45020\u003C/a\u003E - \u003Ca href=\"/Byron\" title=\"Byron\"\u003EByron\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EErds Unavailability Due to Plant Process Computer Failure\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 45020 - Byron\n","link":"","lat":42.07673888888889,"lon":-89.28115,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 566982023-08-25T21:00:00025 August 2023 21:00:00
[Table view]10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Assessment Capability ENS 563542023-02-06T11:30:0006 February 2023 11:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Communications and Assessment Capabilities ENS 557692022-03-06T03:15:0006 March 2022 03:15:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Degradation of Technical Support Center ENS 547102020-05-13T15:00:00013 May 2020 15:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Response Facility ENS 529192017-08-21T02:08:00021 August 2017 02:08:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Assessment Capability Due to Non-Functional Tsc Ventilation ENS 521002016-07-18T20:00:00018 July 2016 20:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Offsite Communications Capability ENS 514122015-09-17T05:30:00017 September 2015 05:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Control Room Area Radiation Monitors Not Able to Provide Radiation Level Information ENS 514012015-09-17T03:00:00017 September 2015 03:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Seismic Monitoring Instrumentation During Planned Maintenance ENS 509882015-04-16T10:00:00016 April 2015 10:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Scheduled Maintenance Affecting Technical Support Center Hvac ENS 508812015-03-12T14:00:00012 March 2015 14:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of the Seismic Monitoring Computer ENS 495992013-12-03T04:00:0003 December 2013 04:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center (Tsc) Non-Functional Due to Planned Maintenance ENS 493752013-09-21T20:31:00021 September 2013 20:31:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Commercial and Ens Communications Due to an Area Phone Outage ENS 491382013-06-20T16:18:00020 June 2013 16:18:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Ventilation Removed from Service for Maintenance ENS 482902012-09-10T14:00:00010 September 2012 14:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Plant Process Computer Removed from Service for Maintenance ENS 472772011-09-19T15:07:00019 September 2011 15:07:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Spds and Erds Unavailable During Replacement of Plant Process Computer System ENS 459982010-06-10T13:30:00010 June 2010 13:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Ventilation Maintenance ENS 459712010-06-01T17:39:0001 June 2010 17:39:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Ventilation System Discovered to Be Non-Functional ENS 450572009-05-12T07:44:00012 May 2009 07:44:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Assessment Capability ENS 450202009-04-25T15:48:00025 April 2009 15:48:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Erds Unavailability Due to Plant Process Computer Failure ENS 449012009-03-12T09:20:00012 March 2009 09:20:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Process Computer and Erds Unavailable for Greater than 60 Minutes ENS 443842008-08-04T23:45:0004 August 2008 23:45:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of 84 of 94 Emergency Sirens Due to Inclement Weather ENS 427122006-07-18T02:46:00018 July 2006 02:46:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Emergency Evacuation Siren Failures Due to Thunderstorms 2023-08-25T21:00:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_45020&oldid=425897"