At 1354, the Calvert Cliffs Nuclear Plant (
CCNPP) felt seismic activity in the control room.
Both Unit 1 and Unit 2 maintained full power operations. At 1405 CCNPP declared an Unusual Event (UE) for Unit 1 and Unit 2. NRC Operations center was notified at 1453 via dedicated phone (CCNPP event 4189).
Both Units continued to operating safely with no actuations. There were no radiological releases.
An Issue Response Team (IRT) was formed and the site commenced walkdown and inspections of all systems, structures and components for possible seismic damage. All problems found will be entered into the site's Corrective Action Program (CAP) and evaluated for operability.
The licensee notified the NRC Resident Inspector, State, and local government agencies.
They have terminated their Notification of Unusual Event as of 0005 EDT. The licensee has notified the NRC Resident Inspector.
Notified R1DO (Krohn),
IRD (Morris),
DHS (Knox),
FEMA (Via).