Title | Safety Related Piping Had Unacceptable Air Void |
Event Description | Engineering reported that an ultrasonic [test] had identified an unacceptable air void in the horizontal run of suction piping from the Refueling Water Storage Tank (RWST) to the Safety Injection pumps, Residual Heat Removal pumps, and Containment Spray pumps. Technical Specification 3.0.3 was entered at 0020 CDT [on] 04/26/2011, and actions were started to remove the [air] void by venting of the suction pipe. Unit 2 was in progress of low power physics testing following refueling outage 2RF12. Inspection for [air] voids is in response to NRC generic letter on voiding in ECCS piping.
The void was removed from the system by venting. Engineering confirmed with ultrasonic [test] that the void was removed, and Technical Specification 3.0.3 was exited at 0143 CDT [on] 04/26/2011. The licensee has notified the NRC Resident Inspector.
Further analysis demonstrated that the declaration of inoperability was a conservative action, and RHR and SI would have fulfilled their respective safety functions and been operable. This analysis is based on a detailed study of the void transport and piping design. The analysis confirmed that one (1) train of containment spray was inoperable, however the containment spray safety function would have been fulfilled with the remaining operable [containment spray] train. Based on the above, it is concluded that the health and safety of the public were unaffected by this condition and this event has been evaluated to not meet the definition of a safety system functional failure per 10CFR50.72(b)(3)(v)(D). The NRC Resident Inspector has been notified of this retraction. Notified R4DO (Deese). |
Where | |
---|---|
Comanche Peak Texas (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+-1.37 h-0.0571 days <br />-0.00815 weeks <br />-0.00188 months <br />) | |
Opened: | Raul Martinez 03:58 Apr 26, 2011 |
NRC Officer: | John Knoke |
Last Updated: | Jun 23, 2011 |
46786 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 46786\u003C/a\u003E - \u003Ca href=\"/Comanche_Peak\" title=\"Comanche Peak\"\u003EComanche Peak\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ESafety Related Piping Had Unacceptable Air Void\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 46786 - Comanche Peak\n","link":"","lat":32.29839166666667,"lon":-97.78532222222222,"icon":"/w/images/d/d7/Luminant_icon.png"}],"imageoverlays":null} | |