Title | Unusual Event- Excessive Leakage from a Charging System |
Event Description | At 1045 CST, on 2/18/11, Comanche Peak Unit 1 declared an Unusual Event related to excessive leakage from the charging system. The 40 GPM leakage was in excess of the specified limit of 25 GPM. At 1121 CST, the charging system leakage was verified isolated. Unit 1 is in stable condition and remains at 100% power. No offsite assistance is required at this time.
At 1311 EST, Comanche Peak Nuclear Power Plant has terminated the Unusual Event. The leaking valve in the charging system has been isolated reducing the leakage to zero. Repairs to the valve are in planning." The licensee notified the NRC Resident Inspector. The licensee notified the Texas Department of Public Safety and will be making a press release to the local press. Notified R4DO (Gaddy), IRD (Gott), NRR EO (Thorp), DHS (McDonald) and FEMA (Via).
This is a follow-up notification to inform the NRC that Comanche Peak Nuclear Power Plant is retracting Event Number 46625, the Unusual Event declaration reported on February 18, 2011 at 10:45 Central Standard Time. The declaration was made based on EAL SU8.1, [Reactor Coolant System] RCS Leakage, and was terminated on February 18, 2011 at 13:11 Central Standard Time. The declaration is retracted because the source of the leakage was from the Chemical and Volume Control System (CVCS) and not from the Reactor Coolant System. The licensee has notified the NRC Resident Inspector. Notified R4DO (Campbell) |
Where | |
---|---|
Comanche Peak Texas (NRC Region 4) | |
Reporting | |
Emergency class: | Unusual Event |
10 CFR 50.72(a) (1) (i), Emergency Class Declaration | |
Time - Person (Reporting Time:+-4.48 h-0.187 days <br />-0.0267 weeks <br />-0.00614 months <br />) | |
Opened: | Alex Ibarra 12:16 Feb 18, 2011 |
NRC Officer: | Vince Klco |
Last Updated: | Feb 24, 2011 |
46625 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 46625\u003C/a\u003E - \u003Ca href=\"/Comanche_Peak\" title=\"Comanche Peak\"\u003EComanche Peak\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EUnusual Event- Excessive Leakage from a Charging System\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 46625 - Comanche Peak\n","link":"","lat":32.29839166666667,"lon":-97.78532222222222,"icon":"/w/images/d/d7/Luminant_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 501902014-06-12T02:40:00012 June 2014 02:40:00
[Table view]10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to Halon Gas Release in Unit 2 Cable Spreading Room ENS 496062013-12-04T19:50:0004 December 2013 19:50:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unusual Event - Loss of Startup Power Due to a Cut Cable ENS 472052011-08-27T06:56:00027 August 2011 06:56:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to Entry Into Eal Hu 4-1 ENS 466252011-02-18T16:45:00018 February 2011 16:45:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event- Excessive Leakage from a Charging System 2014-06-12T02:40:00 | |