ENS 46129
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
01:01 Jul 27, 2010 | |
Title | |
Event Description | On 7/26/2010 at 2001 [hrs. CDT], Control Room personnel initiated a manual reactor trip from approximately 19% reactor power. Unit 1 was in the process of coming off-line to support Main Generator repair. The generator breaker had just been opened and load transferred to condenser steam dumps when a loss of condenser vacuum occurred. The reactor was manually tripped due to a loss of main condenser vacuum with reactor power above P-10 permissive. All systems functioned as expected. All control rods fully inserted. Main Steam Isolation valves were manually shut. All reactor coolant system parameters are as expected, with reactor coolant temperature being maintained by atmospheric steam dumps.
Currently, the plant is at normal operating temperature and pressure with the steam generators being fed by the main feed pumps. Feedwater is being supplied via the condenser and condensate storage tank. There were no lifts of safeties or reliefs during the transient. The plant is in its normal shutdown electrical line-up with no effect on Unit 2. There is no known primary-to-secondary leakage. The cause of the loss of vacuum is under investigation. The licensee has notified the NRC Resident Inspector. |
Where | |
---|---|
Point Beach Wisconsin (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-2.27 h-0.0946 days <br />-0.0135 weeks <br />-0.00311 months <br />) | |
Opened: | Karl Cossey 22:45 Jul 26, 2010 |
NRC Officer: | Howie Crouch |
Last Updated: | Jul 26, 2010 |
46129 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 46129\u003C/a\u003E - \u003Ca href=\"/Point_Beach\" title=\"Point Beach\"\u003EPoint Beach\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EManual Reactor Trip Due to Loss of Condenser Vacuum\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 46129 - Point Beach\n","link":"","lat":44.280972222222225,"lon":-87.53674444444445,"icon":"/w/images/9/9b/NextEra_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | Yes, Manual Scram |
Before | Power Operation (19 %) |
After | Hot Standby (0 %) |
Point Beach with 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
WEEKMONTHYEARENS 553902021-07-31T21:46:00031 July 2021 21:46:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip of Unit 1 ENS 537792018-12-05T06:00:0005 December 2018 06:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip on Loss of Main Condenser Vacuum ENS 515702015-11-29T01:12:00029 November 2015 01:12:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Generator Lockout After Voltage Regulator Malfunction ENS 515062015-10-29T08:48:00029 October 2015 08:48:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Actuation of the Auxiliary Feedwater System Due to Main Transformer Lockout ENS 506492014-12-03T02:50:0003 December 2014 02:50:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Failure of Condensate Pump ENS 487222013-02-06T17:43:0006 February 2013 17:43:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unusual Event - Loss of Offsite Power to Essential Buses for Greater than 15 Minutes ENS 481892012-08-15T01:31:00015 August 2012 01:31:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 1 Manually Tripped in Anticipation of an Automatic Turbine Trip ENS 480532012-06-28T01:46:00028 June 2012 01:46:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to 100% Load Reject ENS 474782011-11-27T08:38:00027 November 2011 08:38:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unusual Event Due to a Loss of Offsite Power During Switching Operations ENS 469572011-06-14T00:24:00014 June 2011 00:24:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Trip During Startup Physics Testing ENS 464822010-12-15T07:48:00015 December 2010 07:48:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 2 Manual Reactor Trip During Startup ENS 461292010-07-27T01:01:00027 July 2010 01:01:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of Condenser Vacuum ENS 460802010-07-09T11:47:0009 July 2010 11:47:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to a Feedwater Regulating Valve Failure ENS 460322010-06-19T11:36:00019 June 2010 11:36:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Generator Lockout ENS 434072007-06-05T20:17:0005 June 2007 20:17:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip After Feedwater Valve Failure ENS 421992005-12-13T09:39:00013 December 2005 09:39:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Trip Due to Loss of Condenser Vacuum ENS 407542004-05-15T16:54:00015 May 2004 16:54:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Diver Entangled in Intake Crib 2021-07-31T21:46:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_46129&oldid=425135"