10 CFR 74.57(f)(2) requires notification within
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> that an
MC&A alarm resolution procedure has been initiated. Because the alarm investigation has been initiated, this notification is being made. There is no indication that a material loss has occurred.
Material processing operations related to this alarm have been suspended.
The NRC Resident Inspector has been notified.
- * * UPDATE FROM RANDY SHACKELFORD TO DONG PARK AT 1509 EDT ON 7/6/10 * * *
The investigation from the MC&A alarm resolution procedure has been successfully completed. No material loss occurred, and the alarm was caused by the material being held up in the process.
Notified R2DO (Widmann),
NMSS EO (Pstrak), and Fuels
OUO Group via email.