ENS 45334
ENS Event | |
|---|---|
14:30 Sep 8, 2009 | |
| Title | Defect Found in Bussmann Fuses |
| Event Description | On September 8, 2009, Nebraska Public Power District (NPPD) completed a reportability determination which concluded that a Bussmann fuse with a batch code of R18 contained an underlying fabrication vulnerability consisting of a missing fuse link. NPPD has concluded this condition is reportable per 10 CFR Part 21.
This fuse is part of a batch of fuses purchased as Commercial Grade items and dedicated by NPPD for use at the Cooper Nuclear Station (CNS). The fuses are shipped directly from an authorized Bussmann facility to CNS. The fuse purchasing description is as follows: FUSE; 10 AMP; 250VAC; ONE-TIME; 50KA I.R. ; GENERAL PURPOSE; Manufacturer Part Number NON-10. The missing fuse link was discovered via destructive testing at CNS. The destructive test was prompted when the fuse failed a field continuity test prior to installation. The fuse had passed CNS dedication, which included a continuity test of 100% of the batch by the manufacturer. Although, none of the other fuses in this batch exhibited missing links via continuity testing, the fuse with the missing link is considered to be a continuation of quality problems previously reported to the Nuclear Regulatory Commission (NRC) per Emergency Notification Number 44634, as followed up by a written report from NPPD to the NRC dated December 2, 2008. That report identified that Several Bussmann fuses, Manufacturer Part Number NON-10, batch code J47, contained poor solder joints internal to the fuse assembly. Bussmann NON-10 fuses are authorized by NPPD for use in both safety related and non safety related applications. The applicable dedication package identifies one of the safety functions as 'fuses are required to conduct the design basis load current without interruption.' If the fuses were installed without the condition being detected and failed upon valid demand of the associated circuit, the mission of the associated safety related equipment may not have been accomplished. Since the condition was found prior to installation, the safety function of the installed fuses remains unaffected and the supported equipment remains unaffected. Other locations where the batch R18 fuses are installed have been determined to be operable through actual circuit operation or measurements across the fuses. Therefore, this condition is NOT reportable under 10 CFR 50.72 or 50.73. Vendor testing and current dedication practices should have precluded the possibility of placing a fuse with a similar condition into unrestricted spares. However, these barriers failed. This provided a potential for a Substantial Safety Hazard. This regulation does not credit pre-installation or post-maintenance testing for the detection of a defect. The dedication does not require CNS to perform a continuity check as credit is given to the vendor, per NUPIC survey, for performing the continuity check at the manufacturer's facility. Since the fuses were stocked in unrestricted spares for essential applications, 10 CFR 21 applies, and the condition is reportable under 10 CFR 21.21. The responsible Corporate Officer has been notified of this condition per 10 CFR 21.21(d)(3)(i) on September 8, 2009 at approximately 0930 CDT. Pursuant to 10 CFR 21.21 (d)(3)(ii) written notification is due to the NRC within 30 days of this notification. The licensee will notify the NRC Resident Inspector. |
| Where | |
|---|---|
| Cooper Nebraska (NRC Region 4) | |
| Reporting | |
| 10 CFR 21.21 | |
| Time - Person (Reporting Time:+24.38 h1.016 days <br />0.145 weeks <br />0.0334 months <br />) | |
| Opened: | David Madsen 14:53 Sep 9, 2009 |
| NRC Officer: | Pete Snyder |
| Last Updated: | Sep 9, 2009 |
| 45334 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 45334\u003C/a\u003E - \u003Ca href=\"/Cooper\" title=\"Cooper\"\u003ECooper\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EDefect Found in Bussmann Fuses\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 45334 - Cooper\n","link":"","lat":40.359658333333336,"lon":-95.65465277777778,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (95 %) |
| After | Power Operation (95 %) |
WEEKMONTHYEARENS 461652010-08-09T17:30:0009 August 2010 17:30:00
[Table view]10 CFR 21.21 4160 Vac Control and Transfer Breaker Switch Defect ENS 453342009-09-08T14:30:0008 September 2009 14:30:00 10 CFR 21.21 Defect Found in Bussmann Fuses ENS 446342008-11-06T14:56:0006 November 2008 14:56:00 10 CFR 21.21 Defect Found in Bussman Fuses 2010-08-09T17:30:00 | |