On May 8, 2009, the
Safety Parameter Display System (
SPDS) will be removed from service at approximately
1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> for Salem Unit 1 to perform planned maintenance to the system. The maintenance consists of the replacement of the uninterruptable power source (
UPS) to improve the reliability of the
SPDS. The removal of
SPDS will also affect the transmission of Salem Unit 1 data from the
emergency response data system (
ERDS). Appropriate compensatory measures will be in place while
SPDS is out of service.
SPDS capability is scheduled to be restored using a temporary power feed later today.
The licensee notified the NRC Resident Inspector.
The Salem Unit 1 Safety Parameter Display System (SPDS) and Emergency Response Data System (ERDS) were returned to service at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br />.
The licensee will notify the NRC Resident Inspector.
Notified the R1DO (Caruso).