ENS 48896
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
16:40 Apr 8, 2013 | |
Title | Control Room Ens Phone Out of Service for Greater than One Hour |
Event Description | The Salem Generating Unit 1 and 2 control room ENS phone system was down for greater than one hour from 1140EDT to 1240EDT.
The licensee notified the NRC Resident Inspector. |
Where | |
---|---|
Salem New Jersey (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-0.7 h-0.0292 days <br />-0.00417 weeks <br />-9.5886e-4 months <br />) | |
Opened: | Gary Meekins 15:58 Apr 8, 2013 |
NRC Officer: | Vince Klco |
Last Updated: | Apr 8, 2013 |
48896 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48896\u003C/a\u003E - \u003Ca href=\"/Salem\" title=\"Salem\"\u003ESalem\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EControl Room Ens Phone Out of Service for Greater than One Hour\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48896 - Salem\n","link":"","lat":39.46302222222222,"lon":-75.53561388888889,"icon":"/w/images/c/cc/PSEG_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 498272014-02-14T06:13:00014 February 2014 06:13:00
[Table view]10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Meteorological Tower Out-Of-Service Due to Weather ENS 488962013-04-08T16:40:0008 April 2013 16:40:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Control Room Ens Phone Out of Service for Greater than One Hour ENS 487562013-02-16T01:00:00016 February 2013 01:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Taken Out of Service for Planned Maintenance ENS 452202009-07-22T12:00:00022 July 2009 12:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Spds Out of Service for Planned Maintenance ENS 450472009-05-08T14:00:0008 May 2009 14:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Safety Parameter Display System Out of Service for Maintenance ENS 408912004-07-22T11:10:00022 July 2004 11:10:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Power to Primary and Backup Offsite Siren System 2014-02-14T06:13:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_48896&oldid=423202"