During an investigation in response to a low
megger reading, a small amount of water was discovered in the environmental qualification boundary of the 22B
RCS Thot thermowell (TE-3-422B2). Analysis of the water on 9/13/07 at 2304 showed
Cesium 137 and 134, and
Magnesium 54 indicating that the source of water intrusion into the thermowell was likely
reactor coolant system (
RCS) fluid. We are continuing the investigation for potential causes of water intrusion other than the
Reactor Coolant System. This report is being made based on the previous indication of
RCS leakage into 23A,
RCS Tcold thermowell (TE-3-420) [see
EN#43627 from 09/10/07] and similar discovery in our preliminary investigation.
PTN Unit 3 Technical Specifications (TS) Limiting Condition for Operation (LCO) 3.4.6.2.a permits no reactor coolant pressure boundary leakage in Modes 1-4. This report to the NRC is pursuant to the requirements of 10 CFR 50.72 (b)(3)(ii)(A) as a degraded condition.
Turkey Point Unit 3 is presently defueled.
The licensee will notify the NRC Resident Inspector.