Reactor Coolant level and pressure are stable in capacity of normal charging.
Reactor Coolant leakage rapidly increased. Large input to
Reactor Coolant Drain Tank. Leak diagnostic in progress. Secured 1B
NCP [
Reactor Coolant Pump] due to low standpipe level. Leak data to be provided on follow up notification.
The NRC Resident Inspector, State, and local Officials were notified of this event by the licensee.
- * * UPDATE FROM RUSSELL EDMOND TO JOE O'HARA AT 1417 ON 12/27/06 * * *
Reactor coolant leak appears to be isolated. Operators entered containment and found the reactor coolant system "C" loop low point drain valve partially open. The operators closed the valve and isolated the reactor coolant leak.
The licensee is in EAL 4.2.U.4.
The licensee notified the NRC Resident Inspector.
R2DO (Landis), NRR EO (MJ Ross-Lee), and IRD Manager (J. Cruz)
- * * UPDATE FROM LARRY SAUNDERS TO JOE O'HARA AT 1613 ON 12/27/06 * * *
The licensee reports they have exited the unusual event at 1600 on 12/27/06 due to the leak being terminated.
The licensee notified the NRC Resident Inspector.
R2DO (Landis),
NRR EO (MJ Ross-Lee),
IRD Manager (J. Cruz),
FEMA(Eaches), and
DHS(J. Craig)