| Title | Unanalyzed Condition - Electrical Containment Penetration |
| Event Description | On March 23, 2005, with the plant at 100% power, an issue was discovered questioning the design of an approximately 3-inch diameter module of containment electrical penetration (PBP5D) used to feed a non-safety related lighting panel (L49E1) inside the containment building. Specifically, it was identified that this penetration module was protected from overcurrent by a single 30-amp breaker (BF503). Action was taken at that time to open the supply breakers de-energizing the lighting panel to prevent any potential fault on the subject penetration module while the issue was being evaluated.
Evaluations were initiated to determine the potential for the containment electrical penetration module to be thermally or mechanically damaged by a postulated fault. During this evaluation, no weak link upstream of the penetration module could be found that could be credited for preventing a fault in the penetration module in the event of a random failure of the breaker. The next breaker upstream of this circuit is too large to provide adequate overcurrent protection if the 30-amp breaker fails to open. Furthermore, it could not be shown that the electrical penetration module could withstand the maximum possible fault current while maintaining its containment integrity function. Therefore, it is now assumed that this postulated fault current could have damaged the penetration module to the extent that it would no longer have performed its containment integrity function. This condition is being reported within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of discovery in accordance with 10CFR50.72(b)(3)(ii)(B) as the nuclear power plant being in an unanalyzed condition that significantly degrades plant safety. Specifically, it was discovered that a system required to meet the single failure criterion does not do so. The licensee notified the NRC Resident Inspector. |
| Where | |
|---|---|
| Davis Besse Ohio (NRC Region 3) | |
| Reporting | |
| 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
| LER: | 05000346/LER-2005-003 Re Containment Electrical Penetration Not Equipped with Backup Electrical Fault Protection |
| Time - Person (Reporting Time:+-3.93 h-0.164 days <br />-0.0234 weeks <br />-0.00538 months <br />) | |
| Opened: | Tom Cobbledick 16:04 May 13, 2005 |
| NRC Officer: | Jeff Rotton |
| Last Updated: | May 13, 2005 |
| 41698 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 41698\u003C/a\u003E - \u003Ca href=\"/Davis_Besse\" title=\"Davis Besse\"\u003EDavis Besse\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EUnanalyzed Condition - Electrical Containment Penetration\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 41698 - Davis Besse\n","link":"","lat":41.59545,"lon":-83.08950833333333,"icon":"/w/images/7/78/Cleveland_Electric_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (100 %) |
WEEKMONTHYEARENS 573732024-10-10T14:45:00010 October 2024 14:45:00
[Table view]10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition ENS 553212021-06-22T16:08:00022 June 2021 16:08:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition High-Energy Line Break Door Unable to Be Latched ENS 528652017-07-20T16:30:00020 July 2017 16:30:00 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Potential Tornado Missile Vulnerabilities ENS 520102016-06-16T15:37:00016 June 2016 15:37:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition of Emergency Diesel Generator During Tornado Low Pressure ENS 506392014-11-25T17:00:00025 November 2014 17:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Non-Conservatisms in Methodology Used for Emergency Core Cooling System Performance Requirements ENS 498282014-02-14T08:25:00014 February 2014 08:25:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Shield Building Construction Opening ENS 470962011-07-26T20:00:00026 July 2011 20:00:00 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Conditions Involving the Safety Related Direct Current (Dc) System ENS 416982005-05-13T20:00:00013 May 2005 20:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition - Electrical Containment Penetration ENS 404572004-01-19T16:20:00019 January 2004 16:20:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Certain Plant Doors May Not Be Able to Withstand Pressure Created by Main Steam Line Break ENS 402562003-10-17T13:00:00017 October 2003 13:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Steam and Feedwater Rupture Control System Unanalyzed Condition at Davis Besse 2024-10-10T14:45:00 | |