ENS 40200
From kanterella
Jump to navigation
Jump to search
ENS Event | |
|---|---|
12:50 Sep 26, 2003 | |
| Title | Greater than 1 Percent of Steam Generators 1,2 & 4 Tubes Inspected Indicate That the Inspected Tubes Require Plugging. |
| Event Description | At 0850 EST on September 26, 2003, with Watts Bar Nuclear Plant Unit 1 defueled, steam generator inspections were being performed in accordance with Technical Specification (TS) 5.7.2.12, 'Steam Generator Tube Surveillance Program.' The results of the inspections performed on Steam Generator Numbers 1, 2, and 4 indicated that greater than 1% of the inspected tubes require repair. Based on TS 5.7.2.12, this determination results in the classification of C-3. The current inspection results do not meet the criteria specified for steam generator tube degradation in Revision 2 of NUREG 1022, Event Reporting Guidelines 10 CFR 50.72 and 10 CFR 50.73. However, for classification C-3, WBN TS Table 5.7.2.12-1, 'SG Tube Inspection Supplemental Sampling Requirements, 'requires that the results of the inspection be reported under 10 CFR 50.72. At this time, the submittal of the Licensee Event Report in accordance with 10 CFR 50.73 is not planned.
The NRC Resident Inspector was notified of this event by the licensee.
In addition, at 0800 on September 29, 2003 Steam Generator Number 3 has been determined to be in the classification of C-3 (48 tubes). The current inspection results do not meet the criteria specified for team generator tube degradation in Revision 2 of NUREG 1022, Event Reporting Guidelines 10 CFR 50.72 and 10 CFR 50.73. However, for classification C-3, WBN TS Table 5.7.2.12-1, 'SG Tube Inspection Supplemental Sampling Requirements,' requires that the results of the inspection be reported under 10 CFR 50.72. At this time, the submittal of a Licensee Event Report in accordance with 10 CFR 50.73 is not planned." R2DO (Mark Lesser) notified. The NRC Resident Inspector was notified of this update by the licensee. |
| Where | |
|---|---|
| Watts Bar Tennessee (NRC Region 2) | |
| Reporting | |
| Other Unspec Reqmnt | |
| Time - Person (Reporting Time:+3.68 h0.153 days <br />0.0219 weeks <br />0.00504 months <br />) | |
| Opened: | John Roden 16:31 Sep 26, 2003 |
| NRC Officer: | John Mackinnon |
| Last Updated: | Sep 29, 2003 |
| 40200 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 40200\u003C/a\u003E - \u003Ca href=\"/Watts_Bar\" title=\"Watts Bar\"\u003EWatts Bar\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EGreater than 1 Percent of Steam Generators 1,2 \u0026amp; 4 Tubes Inspected Indicate That the Inspected Tubes Require Plugging.\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 40200 - Watts Bar\n","link":"","lat":35.60199166666666,"lon":-84.7889388888889,"icon":"/w/images/c/ce/Tennessee_Valley_Authority_icon.png"}],"imageoverlays":null} | |
WEEKMONTHYEARENS 476092012-01-17T22:46:00017 January 2012 22:46:00
[Table view]Other Unspec Reqmnt 24-Hour Report Per Section 2.G of Unit 1 Operating License ENS 468852011-05-14T18:28:00014 May 2011 18:28:00 Other Unspec Reqmnt Violation of License Condition ENS 468392011-05-09T19:18:0009 May 2011 19:18:00 Other Unspec Reqmnt Potential Valve Mispositioning Led to a Condition Prohibited by Technical Specifications ENS 458272010-04-08T04:00:0008 April 2010 04:00:00 Other Unspec Reqmnt Diesel Generators Wired Incorrectly ENS 453312009-09-08T01:20:0008 September 2009 01:20:00 Other Unspec Reqmnt Discovery of After-The-Fact Emergency Condition Unusual Event ENS 426902006-07-07T18:45:0007 July 2006 18:45:00 Other Unspec Reqmnt Alternative Report for Non-Declared Emergency Condition in Accordance with Nureg-1022 ENS 414822005-03-11T19:29:00011 March 2005 19:29:00 Other Unspec Reqmnt It Was Determineded That Greater than 1% of Inspected S/G Tubes Must Be Repaired. ENS 402002003-09-26T12:50:00026 September 2003 12:50:00 Other Unspec Reqmnt Greater than 1 Percent of Steam Generators 1,2 & 4 Tubes Inspected Indicate That the Inspected Tubes Require Plugging. 2012-01-17T22:46:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_40200&oldid=428944"