ENOC-08-00018, Stations - Decommissioning Fund Status Report for the Period Ending December 31, 2007

From kanterella
(Redirected from ENOC-08-00018)
Jump to navigation Jump to search
Stations - Decommissioning Fund Status Report for the Period Ending December 31, 2007
ML080930157
Person / Time
Site: Pilgrim, Vermont Yankee  File:NorthStar Vermont Yankee icon.png
Issue date: 03/26/2008
From: Mccann J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ENOC-08-00018, FOIA/PA-2009-0026, NUREG-1307, RIS-01-007, FOIA/PA-2013-0151
Download: ML080930157 (6)


Text

p. f ;

Entergy Nuclear Operations, Inc.

440 Hamilton Avenue SEntergy White Plains, NY 10601 Tel 9142723370 John F. McCann Director Nuclear Safety and Licensing March 26, 2008 ENOC-08-0001 8 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear Power Station Docket No. 50-271 Pilgrim Nuclear Power Station Docket No. 50-293 Decommissioning Fund Status Report

Dear Sir or Madam:

Entergy Nuclear Operations, Inc (Entergy) is providing the report required by 10 CFR 50.75(f)(1) regarding the status of decommissioning funding for the Vermont Yankee and Pilgrim Nuclear Power Stations. The required information for Vermont Yankee and Pilgrim is provided in Attachments I and II, respectively. These reports are for the period ending December 31, 2007 and are in accordance with NUREG-1307 and RIS 2001-07.

There are no new regulatory commitments identified in this letter. If you have any questions or require additional information, please contact Ms. Charlene Faison at 914-272-3378.

V rytruly yours, e-ohn F. McCann Director Nuclear Safety and Licensing Entergy Nuclear Operations cc: next page Ax wI

ENOC-08-00018 Dockets 50-271 and 50-293 Page 2 of 2 cc:

J. Kim NRC NRR Project Manager S. Collins NRC Region I Regional Administrator NRC Senior Resident Inspector, Pilgrim NRC Senior Resident Inspector, Vermont Yankee D. O'Brien Commissioner VT Department of Public Service

ATTACHMENT I TO ENOC-08-00018 I -

ANNUAL DECOMMISSIONING FUND STATUS REPORT FOR VERMONT YANKEE NUCLEAR POWER STATION ENTERGY NUCLEAR OPERATIONS, INC. -

VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. 50-271

ENOC-08-00018; Attachment I Entergy Nuclear Operations, Inc.

Status of Decommissioning Funding - Vermont Yankee For Year Ending December 31, 2007 - 10 CFR 50.75(f)(1)

Plant Name: Vermont Yankee Nuclear Power Station

1. Amount of decommissioning funds estimated $ 490.89 million to be required pursuant to 10 CFR 50.75 (b) and (c).

Decommissioning cost estimate escalated at $ 621.84 million 3.0% per year to the midpoint of decommissioning (December 2015).

2. Amount accumulated to the end of the $ 439.57 million calendar year preceding the date of the report (December 31, 2007).

Fund balance with 5.0% annual growth to the $ 649.44 million midpoint of decommissioning (December 2015).

3. A schedule of the annual amounts remaining None to be collected.
4. Assumptions used in determining rates of Escalation rate: 3.0%

escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates Rate of earnings: 5.0%

of other factors used in funding projections.

5. Any contracts upon which the licensee is None relying pursuant to 10 CFR 50.75(e)(1)(v).
6. Modifications occurring to a licensee's current None method of providing financial assurance since the last submitted report.
7. Any material changes to trust agreements. None

"S ATTACHMENT II TO E.NOC-08-00018 ANNUAL DECOMMISSIONING FUND STATUS REPORT FOR PILGRIM NUCLEAR POWER STATION ENTERGY NUCLEAR OPERATIONS, INC.

PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293

ENOC-08-00018; Attachment II-Entergy Nuclear Operations, Inc.

Status of Decommissioning Funding - Pilgrim NPS For Year Ending December 31, 2007 - 10 CFR 50.75(f)(1)

Plant Name: Pilgrim Nuclear Power Station

1. Amount I of decommissioning funds estimated $ 495.12 million to be required pursuant to 10 CFR 50.75 (b) and (c).

Decommissioning cost estimate escalated at $ 627.20 million 3.0% per year to the midpoint of decommissioning (December 2015).

2. Amount accumulated to the end of the $ 621.74 million calendar year preceding the date of the report (December 31, 2007).

Fund balance with 5.0% annual growth to the $ 918.59 million midpoint of decommissioning (December 2015).

3. A schedule of the annual amounts remaining None.

to be collected.

4. Assumptions used in determining rates of Escalation rate: 3.0%

escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates Rate of earnings: 5.0%

of other factors used in funding projections.

5. Any contracts upon which the licensee is None relying pursuant to 10 CFR 50.75(e)(1 )(v).
6. Modifications occurring to a licensee's current None method.of providing financial assurance since the last submitted report.
7. Any material changes to trust agreements. None